Coupling and Analysis of 981 Deep Water Semi-submersible Drilling Platform and the Mooring System

Xudong Wang, Chaodong Luo, Xiao-mei Zhu, Liqin Qian, Jianwen Sheng, D. Wang, Feng Yang, Haotian Bai, Fan Yang2017 · DOI

Abstract

As offshore exploration moves into ultra-deep waters, the weight and complexity of mooring systems for semi-submersible platforms increase significantly. This paper presents a coupled time-domain analysis of the "981" platform and its multi-component mooring system. By integrating MATLAB-based catenary calculations with AQWA hydrodynamic modeling, the study evaluates safety and positioning performance under South China Sea environmental conditions. The analysis identifies an optimal 40° horizontal inclination at the top of the mooring lines, balancing line tension safety with platform offset limits.

Introduction: The Challenge of Ultra-Deep Water Mooring

Offshore oil exploration in regions like the South China Sea requires platforms to operate at depths exceeding 1500 meters. Traditional catenary mooring systems, composed primarily of heavy steel chains, become prohibitively heavy at these depths, reducing the platform's payload capacity. To mitigate this, engineers employ multi-component mooring lines that incorporate lighter synthetic materials.

However, these systems introduce significant engineering challenges due to nonlinear coupling. The platform's motion affects line tension, which in turn dictates the platform's dynamic response. Standard frequency-domain analyses often fail to capture these complex interactions. This study establishes a reliable coupled time-domain analysis method to ensure platform safety during both routine operations and extreme "once-in-a-century" weather events.

Methodology

The researchers employed a dual-stage computational approach to bridge static design and dynamic simulation.

Static Analysis and Catenary Modeling

The initial phase involved using MATLAB to solve catenary equations for multi-component lines. This static analysis determined the equilibrium geometry of the 12-chain mooring system. The model accounted for various segments of the line, solving a system of 11 equations with 18 variables, including line length, weight per unit length, and horizontal force components.

Schematic of multi-component mooring line segments and variables used in static analysis.

Hydrodynamic Modeling and Coupled Simulation

A 3D hydrodynamic model of the 981 platform was constructed using AQWA software. The study utilized the AQWA-DRIFT module for coupled time-domain simulation, which accounts for time-varying wave forces, second-order wave drift, and fluid-structure interaction delays based on Cummins' theory.

Top-down view of the 981 platform mooring configuration and the direction of environmental loads (wind, wave, current).

The model was subjected to simulated South China Sea conditions, utilizing the JONSWAP wave spectrum and API wind spectrum. Key environmental parameters included a significant wave height of 6m and wind velocities of 23.15 m/s for normal operations, with increased loads for extreme weather testing.

Key Insights: The Tension-Offset Trade-off

The most critical design variable identified was the horizontal inclination angle at the top of the mooring lines. The study revealed a fundamental trade-off:

  • Increasing the angle reduces the maximum tension on the lines, thereby increasing the safety factor against line breakage.
  • Increasing the angle also increases the platform's horizontal "offset" or drift.

The researchers identified a "sweet spot" at a 40° horizontal inclination. At this angle, the platform offset remains approximately 5% of the water depth—the industry standard limit for normal drilling operations. This configuration provides the optimal compromise between structural safety and operational positioning.

Results and Safety Evaluation

The coupled analysis confirmed that the 981 platform's mooring system meets rigorous safety standards:

  • Normal Operations: Mooring line safety coefficients exceeded the 1.67 requirement set by the API RP 2 SK standard.
  • Extreme Weather Performance: Under "once-in-a-century" storm conditions at 1500m depth, the system maintained a safety factor of 1.73.
  • Maximum Offset: During extreme weather, the maximum horizontal offset reached 125.36m (8.38% of water depth). While exceeding the 5% "normal" limit, this remains within the 5%–10% "restricted operation" range, ensuring the platform's survival even if active drilling must be suspended.

Conclusion and Future Directions

This research demonstrates that for deep-water assets, analyzing the platform and mooring system as a single coupled entity is essential. The mass and dynamics of the mooring system significantly influence the overall hydrodynamic response of the rig.

While providing a robust framework for tension and positioning analysis, future work could expand to include detailed structural integrity and fatigue life analysis of the rig's hull and synthetic mooring components, as well as adaptation of the model to other specific oceanic environments.

Summary updated

Abstract

With the increasing water depth, semi-submersible platform mooring system weight has increased rapidly. Because the coupling of the platform and mooring system will directly affect the safety of platform location, the mooring system must use the design of multi-component mooring line. The paper introduces coupled time domain analysis theory of platform and mooring system, and then uses AQWA software to build the three-dimensional hydrodynamic model of the 981 Semi-submersible Platform. MATLAB is used for the multi-component mooring system design calculations. The load is applied to the model of the marine environment in the South China. It studies its changes with top angle of tension mooring system and platform offset, and finally checks the platform safety. Ultimately it determines a reasonable horizontal inclination at the top of mooring lines. Check and assess mooring positioning system of the 981 platform once in a century environmental loads. This paper has a positive meaning to optimization of 981 semi-submersible drilling platform mooring system at the deep water state, pre-anchor operation and positioning system security evaluation.
BibTeX
@misc{wang2017coupling,
  author = {Xudong Wang and Chaodong Luo and Xiao-mei Zhu and Liqin Qian and Jianwen Sheng and D. Wang and Feng Yang and Haotian Bai and Fan Yang},
  title = {{Coupling and Analysis of 981 Deep Water Semi-submersible Drilling Platform and the Mooring System}},
  year = {2017},
  doi = {10.2991/icreet-16.2017.1},
}
Figure