Abstract
In order to recycle the waste heat of the dyeing and printing factory, analysis about dyeing and printing waste heat and its current running system of the factory were obtained in this paper. Analysis indicated that most of the waste heat was unemployed. The recycling order of all kinds of waste heat available confirmed after the calculation of them by using thermodynamic method. A waste heat utilization scheme with two recycling stations was designed to solve the problem of heat wasting. Practice shows that the scheme is effective and economical. It brings the factory with 80% recovery rate and nearly 6 million Yuan cost saving.
Introduction
The dyeing and printing industry is a cornerstone of the textile sector but remains notoriously energy-intensive. In many Chinese factories, energy utilization rates hover around 35%, with the remainder lost as waste heat. High-temperature steam condensate (nearly 100°C), dyeing wastewater (60°C), and boiler flue gas are typically discharged directly into the environment. This represents both a significant economic loss due to wasted fuel (primarily coal) and a source of thermal pollution. This research presents a practical engineering solution implemented at the Junyou Dyeing and Printing Factory to "close the loop" by capturing low-to-medium grade heat and returning it to the production cycle.
Methodology and Data Analysis
The researchers employed a three-step engineering approach:
- Thermodynamic Analysis: Using the Chinese national standard (GB/T 1028-2000), they calculated the total enthalpy available in various waste streams.
- System Design: A two-station recovery scheme was developed to target different waste sources based on their temperature and volume.
- Integration: The system pre-heats the boiler's feed water from 25°C to 85°C, directly reducing the coal required for steam generation.
The "hot medium" data, which formed the basis for these calculations, included flow rates and temperatures for cooling water, condensate, boiler sewage, and turbine oil.
System Design: The Two-Station Approach
The recovery scheme is divided into two primary stations:
- Station 1 (Workshop): This station focuses on recycling high-temperature condensate and dyeing wastewater. A critical innovation here is the specialized flash tank, designed to filter impurities and eliminate flash steam. This protects downstream plate heat exchangers from fouling and pressure surges, ensuring industrial durability.
- Station 2 (Boiler/Turbine): This station utilizes tubular heat exchangers to capture heat from continuous boiler sewage (at 200°C) and the cooling oil of steam turbines.
Key Results and Economic Impact
The implementation at the Junyou factory demonstrated that the boiler feed water acts as an ideal heat sink. By pre-heating the intake water, the factory achieved the following:
- Recovery Efficiency: An overall 80% heat recovery rate.
- Fuel Savings: Annual coal consumption was reduced by 1,080 tons.
- Water Conservation: Recycling condensate saved 30,000 tons of fresh water annually.
- Economic Gains: Total cost savings reached approximately 5.928 million Yuan per year. With an initial investment that can be recovered in just six months, the system proves highly economical.
Conclusion
This case study illustrates that multi-stage heat recovery is a viable path for improving the sustainability of textile manufacturing. While the current design focuses on liquid-phase heat, future work could integrate gas-to-liquid exchangers to capture heat from flue gases and setting machine smoke, potentially pushing the recovery rate even higher. The success of the flash tank in managing contaminated wastewater highlights the importance of robust mechanical design in translating thermodynamic theory into reliable industrial practice.