Production Scheduling Identification: An Inverse Optimization Approach for Industrial Load Modeling Using Smart Meter Data
Abstract
To cost-effectively manage the supply-demand balance of the power system, the flexibility of industrial users could be harnessed through demand-side response. To minimize the negative impact on the production of industrial users during demand-side response, general-purpose models such as the state-task network (STN) are widely used to model the energy-consuming constraints of industrial production processes. However, the required model parameters cannot be set because the required data are privately owned by industrial users and are not directly available, hindering the accurate modeling of industrial loads. In this paper, we propose production scheduling identification (PSI), an inverse-optimization-based approach for industrial load modeling under incomplete information. In PSI, industrial users' smart meter data are used to identify production scheduling parameters, thus addressing the problem of accurate load modeling when private data are unavailable. We implemented PSI with a modified STN and proposed a practical algorithm to obtain an effective solution. Numerical tests showed that PSI can identify the model parameters of a steel powder plant and a cement plant with acceptable accuracy, using only 21 days of hourly smart meter data. Compared with accurate models established with direct access to private data, the modeling error does not exceed 8.5% and 5.2%, respectively.
Empirical ResultsBrowse all benchmarks →
| Benchmark | Method | Metric | Score | Protocol / Evidence |
|---|---|---|---|---|
| Cement plant | PSI (mSTN, i (end)=5) | load model accuracy (nRMSE) | 5.18% | split: test · i_end=5 · test-days=10 · model-variant=mSTN · training-days=21Source quoteL416: PSI │ 5.18% │ 8.52% |
| Steel powder manufacturer | PSI (mSTN, i (end)=5) | load model accuracy (nRMSE) | 8.52% | split: test · i_end=5 · test-days=10 · model-variant=mSTN · training-days=21Source quoteL416: PSI │ 5.18% │ 8.52% |
Reported baseline / comparator measurements (2)
| Benchmark | Method | Metric | Score | Protocol / Evidence |
|---|---|---|---|---|
| Cement plant | MLP baseline | load model accuracy (nRMSE) | 13.43% | split: test · model=MLP · test-days=10 · training-days=21Source quoteL413: \begin{tabular}[c]{@{}c@{}} Steel powder manufacturer MLP │ 13.43% │ 18.50% |
| Steel powder manufacturer | MLP baseline | load model accuracy (nRMSE) | 18.50% | split: test · model=MLP · test-days=10 · training-days=21Source quoteL413: \begin{tabular}[c]{@{}c@{}} Steel powder manufacturer MLP │ 13.43% │ 18.50% |
BibTeX
@article{lyu2025production,
author = {Ruike Lyu and Hongye Guo and Qinghu Tang and Qixin Chen and Chongqing Kang},
title = {{Production Scheduling Identification: An Inverse Optimization Approach for Industrial Load Modeling Using Smart Meter Data}},
journal = {IEEE Trans. Smart Grid},
year = {2025},
url = {https://openreview.net/forum?id=0Q7v1T5c4D},