NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Statistical logic cell delay analysis using a current-based model

Hanif Fatemi, Shahin Nazarian, Massoud Pedram

Abstract

A statistical model for the purpose of logic cell timing analysis in the presence of process variations is presented. A new current-based cell delay model is utilized, which can accurately compute the output waveform for input waveforms of arbitrary shapes subjected to noise. The cell parasitic capacitances are pre-characterized by lookup tables to improve the accuracy. To capture the effect of process parameter variations on the cell behavior, the output voltage waveform of logic cells is modeled by a stochastic Markovian process in which the voltage value probability distribution at each time instance is computed from that of the previous time instance. Next the probability distribution of a%Vdd crossing time, i.e., the hitting time of the output voltage stochastic process is computed. Experimental results demonstrate the high accuracy of our cell delay model compared to Monte-Carlo-based SPICE simulations.
BibTeX
@inproceedings{fatemi2006statistical,
  author = {Hanif Fatemi and Shahin Nazarian and Massoud Pedram},
  title = {{Statistical logic cell delay analysis using a current-based model}},
  booktitle = {DAC},
  year = {2006},
  doi = {10.1145/1146909.1146975},
}

Loading related content...

Figure