Risk Analysis of Flood Overtopping Based on Uncertain Time Interval TBN

Hongwei WangJisuanji 2013

Abstract

In the process of flood overtopping,the uncertainty of events' duration time caused by state uncertainty of natural conditions,dam and emergency measures,and the effect of emergency measures are both key factors that affect the flood overtopping risk.The traditional time interval was transformed into an uncertain time interval and an uncertain time interval Temporal Bayesian Network(TBN) was proposed.After that,a new inferring algorithm of the TBN was discussed.On the basis,flood overtopping risk analysis model,in which emergency measures were considered,was established.Finally,the simulation result shows that the model can accumulate information,judge the importance of each emergency measure,express the state uncertainty and time uncertainty which both exist in the process of flood overtopping and accordingly increase the accuracy of flood overtopping risk analysis.
BibTeX
@inproceedings{wang2013risk,
  author = {Hongwei Wang},
  title = {{Risk Analysis of Flood Overtopping Based on Uncertain Time Interval TBN}},
  booktitle = {Jisuanji},
  year = {2013},
}

Loading related content...

Figure