NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Research on Fracture of Foldable Drill Floor Column for 3000 m Truck-mounted Drilling Rig

Pei YangOil 2011

Abstract

The rear two columns of drill floor were found to have large size fracture when one of our ZJ30 truck-mounted drilling rigs performed the drilling operations in Middle East.Although we repaired the fractures through welding,fracture was still produced.This can directly threaten the operation safety.Therefore,we performed a theoretical verification on the column strength.We got a sample of fractured column on the jobsite,and tested the physicochemical performance and impact toughness.All the test and verifications showed that the material performance met the design requirements.After careful observance on the jobsite and analysis of cracks,we concluded that the cracks were caused due to the lifting of the top of drill floor without removing connection pins.After that,we performed the finite element analysis and simulated lifting test under the same operating condition.The calculation and stress test result confirmed our conclusion.Meanwhile,Moduspec,a recognized third party inspector,checked the whole manufacturing process of our drill floor,and came to a conclusion that the user's incorrect lifting caused the fracture of drill floor columns.
BibTeX
@inproceedings{yang2011research,
  author = {Pei Yang},
  title = {{Research on Fracture of Foldable Drill Floor Column for 3000 m Truck-mounted Drilling Rig}},
  booktitle = {Oil},
  year = {2011},
}

Loading related content...

Figure