Quantile Propagation Planning for Budgeted Tail-Risk Evaluation

Weijia Han, Zhi Huang, Lisha Qu, Yuanyuan Tan, Jiayue Meng

TL;DR

Quantile Propagation Planning (QPP) is a deterministic method for risk-aware planning that evaluates tail risk by propagating a small, fixed set of disturbance quantiles through a system's dynamics. By replacing noisy Monte Carlo samples with a handful of strategically chosen "level-curve" trajectories, QPP provides a budget-efficient way to minimize rare, costly outcomes in complex environments like microgrid management and inventory control.

What Problem Does This Paper Address?

In many real-world scenarios—from managing a power grid to stocking retail shelves—planners must account for uncertainty. Traditional "mean-only" planning focuses on the average outcome but can be blindsided by rare, catastrophic events in the "tail" of the distribution.

To capture these risks, researchers often use Conditional Value-at-Risk (CVaR), which measures the expected cost of the worst outcomes (e.g., the worst 10%). However, calculating CVaR typically requires many Monte Carlo simulations. If your model is expensive to run, you might only afford a few "rollouts." With a tiny budget, Monte Carlo estimates become incredibly noisy—if you only run five simulations, your estimate of the "worst 10%" might be determined by a single, lucky (or unlucky) random sample. This "statistical bottleneck" makes it nearly impossible to rank different plans reliably.

Methods

The authors introduce Quantile Propagation Planning (QPP) to break this bottleneck. Instead of drawing random samples, QPP uses a deterministic approach:

  1. Fixed Quantile Levels: It selects a small set of $K$ fixed quantile levels (e.g., the 5th, 25th, 50th, 75th, and 95th percentiles of the noise).
  2. Recursive Propagation: It propagates these specific levels through the system's dynamics. Crucially, it uses comonotonic coupling, meaning it assumes the same quantile rank persists across time steps and coordinates.
  3. Level-Curve Scoring: The costs from these $K$ trajectories form a piecewise-linear "cost curve." QPP analytically integrates this curve to calculate both the mean and the CVaR.
  4. Optimization: This evaluator is plugged into a standard planner like the Cross-Entropy Method (CEM), which iteratively refines a population of candidate plans to find the one with the best risk-adjusted score.
The QPP pipeline: from state observation to deterministic risk evaluation and action selection.

Datasets

The researchers evaluated QPP across three distinct environments:

  • Overload: A synthetic 1D task where a controller must balance throttle rewards against the risk of exceeding a safety threshold (overload).
  • Inventory: A 2D task involving persistent lognormal demand, where the goal is to minimize the combined costs of holding stock and running out (stockouts).
  • Microgrid: A real-world application using hourly load data from the ECL dataset. The task is to manage battery dispatch for buildings to minimize electricity costs and grid-import peaks. This involved fitting models to 12 training sites and testing on 4 held-out evaluation sites.

Key Insights and Ideas

  • Deterministic vs. Stochastic: QPP transforms a stochastic estimation problem into a deterministic geometry problem. By looking at the "level curve" of costs, it avoids the high variance of small-sample Monte Carlo.
  • The Power of Coupling: By assuming the "worst-case" rank persists (comonotonicity), QPP creates a conservative surrogate for the real world. As shown in Figure 2, while real execution involves independent shocks at every step, QPP's coupled trajectories provide a structured "envelope" of possible futures.
Comparison between QPP's coupled planning levels (left) and the independent shocks of real-world execution (right).
  • Budget Efficiency: QPP is designed for "tight" budgets. The authors show that QPP with just 5 trajectories can outperform Monte Carlo methods using 20 or even 50 trajectories in certain tasks because it doesn't "waste" evaluations on redundant typical cases.

Key Results

  • Safety and Reliability: On the Overload task, QPP reduced the realized violation rate from 2.5% (mean-only) to just 0.5%.
  • Mean-Tail Trade-off: QPP effectively moves planning along a "frontier," allowing users to accept a slightly higher average cost in exchange for significantly lower tail risk.
  • Microgrid Performance: In the microgrid study, QPP improved "headroom" (safety margin for the battery) at all four test sites and significantly reduced the rate of actual grid-import exceedances compared to mean-rollout planning.
Results on the Overload task showing QPP's competitive edge in tail-risk reduction within a limited evaluation budget.

Limitations and Future Work

While QPP is powerful, the authors note several boundaries:

  • Conservatism: The comonotonic assumption can sometimes be too conservative, leading to plans that are safer than necessary.
  • Interpolation Error: With only 5 levels, there is an inherent ~11% error in the cost-curve approximation.
  • Model Dependency: QPP relies on having a good estimate of the noise distribution (the quantile function). If the model fit is weak, the benefits of QPP diminish.
  • Complexity: The current theory focuses on scalar disturbances. Extending this to high-dimensional, highly non-monotone dynamics remains an open challenge for future research.

Summary updated

Abstract

Risk-aware planning must identify rare, costly outcomes using only a limited number of model evaluations. Monte Carlo rollouts spend this budget on noisy tail estimates, while planning from the mean can miss the tail entirely. We introduce quantile propagation planning (QPP), which propagates a small, fixed set of disturbance quantiles through the dynamics and integrates the resulting cost curve to evaluate both mean and tail risk. The method is exact at the propagated levels, converges as the quantile grid is refined, and admits a one-sided conservatism guarantee under stated structural conditions. In controlled overload and inventory tasks, QPP reduces realized tail cost and constraint violations relative to mean-rollout planning. On overload, it remains competitive with sampled evaluators that use substantially more trajectories. These results position QPP as a transparent, budget-controlled approach to tail-risk evaluation.
BibTeX
@misc{han2026quantile,
  author = {Weijia Han and Zhi Huang and Lisha Qu and Yuanyuan Tan and Jiayue Meng},
  title = {{Quantile Propagation Planning for Budgeted Tail-Risk Evaluation}},
  year = {2026},
  eprint = {2610.41351},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2610.41351},
}
Figure