Abstract

The Joint Replenishment Problem (JRP) is a cornerstone of supply chain optimization, modeling how retailers coordinate orders for multiple items to minimize shared shipping and individual handling costs. While traditional online models focus on either holding costs (make-to-stock) or backlog penalties (make-to-order), real-world logistics frequently requires balancing both. This paper introduces the first constant-competitive online algorithm for JRP that incorporates both holding and backlog costs. By employing a multi-phase greedy strategy and a dual-fitting analysis, the authors achieve a 30-competitive ratio for the general multi-item case, bridging a significant gap in inventory management theory.

Introduction

In supply chain management, the Joint Replenishment Problem (JRP) involves a retailer ordering multiple items from a single supplier. Each order incurs a fixed joint cost (e.g., shipping) plus item-specific costs for each product type included. The challenge is intensified in "online" settings where demand arrives unpredictably, and the retailer must decide when to trigger a service without knowledge of future requests.

Previous research typically addressed two extremes: make-to-order models (no stock, only backlog costs) and make-to-stock models (hard deadlines, only holding costs). This paper addresses the realistic middle ground where every request has a "soft" deadline. If fulfilled early, the retailer pays a holding cost; if fulfilled late, they pay a backlog cost.

The Online JRP Model with Soft Deadlines

The core of the problem is deciding exactly when to trigger a service and which items to include to minimize the total sum of service, holding, and backlog costs. Every request $\rho$ is characterized by its arrival time $a_\rho$ and a preferred deadline $d_\rho$.

Visualization of holding and backlog cost accumulation for a request $\rho$ served at time $d_\rho$.

As illustrated in the figure above, the algorithm must navigate the trade-off between fulfilling a request before its deadline (incurring holding costs $h$) or after its deadline (incurring backlog costs $b$). The goal is to find a service schedule that minimizes the total cost relative to an omniscient offline optimizer.

Algorithm Design: The "Cup" Metaphor

The proposed algorithm utilizes a greedy logic driven by a "cup" metaphor for cost accumulation.

Single-Item Case

In the single-item scenario, the algorithm acts as a reservoir for backlog costs. It waits until the accumulated backlog costs of overdue requests equal the service cost $s$. Once this threshold is reached, a service is triggered. To maximize the efficiency of the "sunk" service cost, the algorithm then "preemptively" fulfills future requests as long as their total holding costs do not exceed the budget $s$.

Multi-Item Coordination and Overflow

For multiple items, the coordination becomes more complex. Each item type maintains its own "cup" that fills with its specific backlog costs. When an item's cup reaches its fixed cost, it becomes "mature," and its additional backlog costs "overflow" into a root cup representing the shared joint service cost.

When the root cup is full, a service is triggered in four distinct phases:

  1. Mature Backlog Phase: Satisfy all overdue requests for mature items.
  2. Premature Backlog Phase: Satisfy items that are nearly mature to prevent imminent joint costs.
  3. Local Holding Phase: Use the item-specific budget to satisfy future requests for included items.
  4. Global Holding Phase: Use the joint cost budget to satisfy future requests across all items included in the service.

Theoretical Results and Competitive Ratios

The paper establishes its results through mathematical proofs using dual fitting. By constructing a feasible solution to the dual of the problem's linear programming relaxation, the authors bound the competitive ratio—the maximum factor by which the online algorithm's cost exceeds the optimal offline cost.

  • Single-Item Case: The authors developed a 3-competitive algorithm and proved this bound is tight.
  • General Multi-Item Case: The main contribution is a 30-competitive algorithm. While 30 may appear high, establishing a constant ratio for this problem is a major theoretical breakthrough, as previous bounds were either unbounded or unknown.
  • Special Cases: In scenarios where backlog is forbidden (infinite cost), the approach simplifies to a 2-competitive algorithm, matching existing optimal bounds for the standard JRP.

Conclusion and Future Work

This research provides a robust theoretical framework for balancing the competing pressures of inventory storage and fulfillment delays in real-time. While the 30-competitive ratio is a landmark result, a significant gap remains between this bound and the known lower bound of approximately 2.75. Future work may focus on tightening this ratio or extending the model to multi-level supply chain hierarchies, such as regional warehouses feeding local distribution centers.

Summary updated

BibTeX
@inproceedings{moseley2025putting,
  author = {Benjamin Moseley and Aidin Niaparast and R. Ravi},
  title = {{Putting Off the Catching Up: Online Joint Replenishment Problem with Holding and Backlog Costs}},
  booktitle = {SODA},
  year = {2025},
  doi = {10.1137/1.9781611978322.130},
}