NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Joint Expansion Planning for Natural Gas and Electric Transmission with Endogenous Market Feedbacks

Russell Bent, Seth Blumsack, Pascal Van Hentenryck, Conrado Borraz-Sánchez, Scott Backhaus

Introduction

As the North American power grid transitions from coal and nuclear power toward natural gas, the interdependence between gas and electric systems has reached a critical point. Historically, these two infrastructures have been planned and operated in silos. This lack of coordination was starkly illustrated during the 2014 "Polar Vortex," where simultaneous peaks in gas and electric demand led to fuel delivery insecurity and massive price spikes.

To address this, we introduce the Combined Electricity and Gas Expansion (CEGE) model. This framework jointly plans the expansion of natural gas and electric transmission networks. Unlike traditional models that treat market prices as fixed, CEGE "endogenizes" price formation, recognizing that building infrastructure to lower market prices can be more beneficial than simply building the cheapest possible pipes and wires.

The CEGE Framework

The CEGE model is a mathematical optimization problem designed to minimize the total cost of network expansion and system operation. It incorporates several high-fidelity technical features:

  • AC Power Flow: Utilizing second-order cone (SOC) relaxations, the model captures realistic binding voltage constraints while remaining computationally tractable.
  • Weymouth Equations: These govern steady-state gas flow physics. The model uses a disjunctive formulation and SOC relaxations to handle the non-linear relationship between pressure and flow.
  • Endogenous Price Formation: This is the model's primary innovation. Instead of using static price inputs, the model employs empirical price sensitivity curves. It calculates gas costs based on locational demand and pressure, allowing the model to "understand" how expanding a pipeline will lower gas prices in a specific zone.
Empirical relationship between normalized congestion metrics and gas prices in Transco zones, justifying the need for endogenous price modeling.

Modeling the Northeastern US Grid

To test the CEGE framework, we developed a representative test system known as the NE Model (Northeastern United States Gas Grid Model). This model integrates a 36-bus electric system with a multi-company gas transmission network covering the Pennsylvania-to-New England corridor, featuring 125 nodes and 143 existing edges.

The NE Model test system, illustrating the integrated gas lines, electric lines, and coupling nodes across the Northeastern United States.

Key Results: The Impact of Market Feedbacks

The model was tested under various stress scenarios, including a 300% increase in gas demand and a 35% increase in electric demand. Several key insights emerged:

  • The Price Feedback Shift: In a traditional "Expansion-only" model, the goal is to meet demand at the lowest construction cost. However, when endogenous price formation is included, the model often chooses to build more infrastructure. For example, in a 300% gas stress scenario, the Expansion-only model built 5 pipelines, while the Endogenous Price model built 14 pipelines. The higher upfront capital cost was offset by long-term operational savings from lower gas prices across the zone.
  • Reliability vs. Economics: The model distinguishes between expansions necessary for reliability (maintaining service during extreme stress) and those driven by economics (reducing congestion to lower prices).
  • Polar Vortex Mitigation: By limiting "pressure penalty costs"—a proxy for the 2014 price spikes—the system naturally opts for a 40% increase in gas infrastructure to stabilize the market.

Conclusion and Future Work

The CEGE model demonstrates that joint planning with market feedbacks leads to more robust and economically efficient infrastructure decisions. While the current model assumes steady-state flow, future work will incorporate transient dynamics (line pack) to manage hourly fluctuations and include gas storage facilities. Additionally, future iterations will expand the scope to include generation expansion, deciding not just where to build pipes and wires, but where to locate the power plants themselves.

Summary updated

BibTeX
@inproceedings{bent2018joint,
  author = {Russell Bent and Seth Blumsack and Pascal Van Hentenryck and Conrado Borraz-Sánchez and Scott Backhaus},
  title = {{Joint Expansion Planning for Natural Gas and Electric Transmission with Endogenous Market Feedbacks}},
  booktitle = {HICSS},
  year = {2018},
}
Figure