Abstract
Traditional data centers built in early development stages often fail to meet modern green standards and performance requirements. This paper examines a renovation project of a 2008-era data center in Shanghai, China. Through practical engineering research, the study summarizes strategies for holistic structural updates—including ceiling, flooring, wall, and air systems—to transform legacy infrastructure into efficient, modern facilities.
Introduction
Data centers constructed in the early 2000s are rapidly becoming "legacy" bottlenecks. These facilities frequently suffer from high energy consumption, poor insulation, and outdated safety systems that do not align with contemporary environmental mandates. While academic research has extensively covered cooling system optimization, there is a significant gap regarding the structural and environmental optimization of the data center "shell." Issues like dust accumulation, moisture seepage, and thermal leakage in walls and ceilings can negate the benefits of efficient cooling hardware.
Methodology
The researchers conducted a case study on a 2,000 $m^2$ facility in Pudong, Shanghai. The renovation implemented a six-pronged engineering strategy:
- Ceiling Engineering: Replacement of standard ceilings with all-aluminum-plastic microporous panels and thermal insulation cotton to prevent moisture and heat gain.
- Ground Engineering: Installation of all-steel anti-static raised floors at a 500-600 mm elevation to create a "static pressure cabin" for superior air distribution.
- Wall Engineering: Use of 40 mm thick aluminum foil glass fiber insulation and color-coated steel plates to enhance thermal and acoustic properties.
- Air Engineering: Implementation of a "positive pressure" fresh air system, maintaining internal pressure 9.8 Pa higher than the exterior to repel dust.
- Waterproof Works: Installation of real-time leakage monitoring and 100 mm high waterproof "ground ridges" around precision air conditioners.
- Fire Engineering: Deployment of an automated heptafluoropropane gas suppression system with dual start modes.
Key Insights and Results
The project demonstrated that the data center envelope functions as a critical tool for efficiency. By elevating the floor, the researchers created a functional air distribution duct that also serves as a sound-absorbing chamber. The use of positive pressure effectively turned the building itself into a filter, reducing the maintenance load on internal systems.
Key performance metrics from the renovation include:
- Air Quality: Fresh air dust filtering efficiency was maintained above 70%.
- Internal Filtration: Precision air conditioning achieved a return air filtration efficiency of over 95%, with air cycled more than 85 times per hour.
- Safety Redundancy: Waterproof ridges and real-time monitoring provided essential buffer time for leak mitigation.
- Energy Standards: The facility successfully moved toward the national "second-class energy-saving" standard.
Conclusion
This research underscores that "green" data center initiatives must extend beyond server efficiency to include the building's physical structure. Holistic insulation and pressure management create a "thermos-like" environment that protects hardware and reduces energy waste. Future work should focus on detailed cost-benefit analyses and the integration of smart city technologies to further optimize operation and maintenance (O&M) costs in large-scale facilities.
Summary updated