Abstract

Cascading failures typically occur following a large disturbance in power systems, such as tripping of a generating unit or a transmission line. Such failures can propagate and destabilize the entire power system, potentially leading to widespread outages. One approach to mitigate impending cascading failures is through controlled islanding, in which a set of transmission lines is deliberately tripped to partition the unstable system into several disjoint, internally stable islands. Selecting such a set of transmission lines is inherently a combinatorial optimization problem. Current approaches address this problem in two steps: first classify coherent generators into groups and then separate generator groups into different islands with minimal load-generation imbalance. These methods, however, are based on computationally expensive heuristics that do not provide optimality guarantees. In this paper, we propose a novel approach to controlled islanding based on weak submodularity. Our formulation jointly captures the minimal generator non-coherency and minimal load-generation imbalance in one objective function. We relax the problem to a formulation with bounded submodularity ratio and a matroid constraint, and propose an approximation algorithm which achieves a provable optimality bound on non-coherency and load-generation imbalance. The proposed framework is tested on IEEE 39-bus and 118-bus power systems.

Introduction

When a major fault occurs in a power grid (like a line tripping), it can trigger a "cascading failure" where remaining lines become overloaded and fail in a domino effect. To stop the propagation of such failures, engineers use controlled islanding: they deliberately trip specific lines to split the grid into several independent, stable "islands."

The challenge is twofold:

  1. Generator Coherency: Generators within an island must oscillate at similar frequencies; otherwise, the island becomes internally unstable and collapses.
  2. Load-Generation Imbalance: Each island needs to match its power production to its demand as closely as possible to maintain frequency stability.

Historically, this has been solved in two separate steps using heuristics (like min-cut or spectral clustering). These methods are computationally expensive and, crucially, offer no guarantee that the resulting partition is anywhere near the "best" possible solution. They also lack the flexibility to trade off between coherency and power balance.

Methodology

The authors move away from graph-based heuristics toward combinatorial optimization. Their core contribution is a one-step formulation that minimizes a weighted sum of generator non-coherency and load-generation imbalance.

Key technical components include:

  • Weak Submodularity: The authors prove that their objective function satisfies "weak submodularity." While standard submodularity implies a strict "diminishing returns" property, weak submodularity is a relaxation that still allows a simple greedy algorithm to achieve a provable bound relative to the optimal solution.
  • Graphic Matroid Constraints: To ensure the grid is partitioned correctly (i.e., each island contains exactly one "reference" generator and the islands are disjoint), they model the constraints using matroid theory. This ensures the greedy selection of lines to trip always results in a valid grid topology.
  • Two-Stage Algorithm: They propose a polynomial-time algorithm consisting of a Greedy Selection phase followed by a Local Search phase to refine the solution.
  • Reference Generator Selection: Picking which generators should "lead" each island is reformulated as a submodular maximization problem, providing a $(1 - 1/e)$ optimality guarantee for that sub-task.
The REFERENCE_GEN algorithm for selecting reference generators, which provides a (1 - 1/e) optimality guarantee.

Experimental Setup

The framework was evaluated using standard power systems engineering benchmarks:

  • IEEE 39-bus system: A simplified model of the New England power grid (10 generators, 46 lines).
  • IEEE 118-bus system: A larger, more complex system representing a portion of the Midwestern US grid (54 generators, 186 lines).

Key Results and Insights

By combining coherency and power balance into a single objective function, the algorithm can "sacrifice" a small amount of generator coherency if it leads to a massive improvement in power balance. Traditional two-step methods are "blind" to this trade-off.

  • Superior Power Balance: On the IEEE 39-bus system, the proposed method reduced load-generation imbalance by 27% compared to the state-of-the-art spectral clustering method.
  • Flexibility: By adjusting a trade-off parameter ($\xi$), the authors showed they could find a "near-balanced" islanding strategy that reduced imbalance from 758.3 MW to just 28.5 MW by allowing a slight increase in generator non-coherency.
  • Scalability: The algorithm maintained high performance on the larger 118-bus system, identifying solutions with significantly lower power imbalance than spectral clustering while maintaining identical coherency levels.
Visualization of controlled islanding on the IEEE 39-bus system, illustrating the partitioning of generators into stable islands.

Conclusion

While the study relies on linearized "swing equations" and DC power flow approximations, it provides a rigorous mathematical foundation for controlled islanding. By proving the submodularity ratio of their objective function, the authors provide a mathematical "safety net," guaranteeing that the algorithm won't produce a catastrophically poor result. Future work could integrate dynamic load shedding directly into the islanding optimization to further enhance real-world applicability.

Summary updated

Abstract

Cascading failures typically occur following a large disturbance in power systems, such as tripping of a generating unit or a transmission line. Such failures can propagate and destabilize the entire power system, potentially leading to widespread outages. One approach to mitigate impending cascading failures is through controlled islanding, in which a set of transmission lines is deliberately tripped to partition the unstable system into several disjoint, internally stable islands. Selecting such a set of transmission lines is inherently a combinatorial optimization problem. Current approaches address this problem in two steps: first classify coherent generators into groups and then separate generator groups into different islands with minimal load-generation imbalance. These methods, however, are based on computationally expensive heuristics that do not provide optimality guarantees. In this paper, we propose a novel approach to controlled islanding based on weak submodularity. Our formulation jointly captures the minimal generator non-coherency and minimal load-generation imbalance in one objective function. We relax the problem to a formulation with bounded submodularity ratio and a matroid constraint, and propose an approximation algorithm which achieves a provable optimality bound on non-coherency and load-generation imbalance. The proposed framework is tested on IEEE 39-bus and 118-bus power systems.
BibTeX
@article{liu2018controlled,
  author = {Zhipeng Liu and Andrew Clark and Linda Bushnell and Daniel S. Kirschen and Radha Poovendran},
  title = {{Controlled Islanding via Weak Submodularity}},
  journal = {IEEE Transactions on Power Systems},
  year = {2018},
  doi = {10.1109/tpwrs.2018.2881163},
}
Figure