Abstract
Building a scientific and reasonable evaluation system for project management informatization has a great effect which is advantageous to assess project management and can indicate the right direction for its construction. This paper, based on the engineering project management implementation cycle, management content, the characteristics of engineering project, and using the theory of BSC, construct a performance evaluation model about engineering.
Introduction: The "IT Black Hole" in Engineering
In the construction and engineering sectors, "informatization"—the application of IT to manage business activities—is seen as essential for staying competitive. However, many enterprises fall into what the authors call the "informatization mire" or "IT black hole." They invest massive amounts of capital into software and systems but lack a scientific way to measure if these tools actually improve performance.
Standard evaluation methods often focus too narrowly on simple financial metrics, which fail to capture the complex, long-term, and often intangible benefits of digital transformation in a project-based environment. The challenge is to create a model that accounts for multiple stakeholders, long project cycles, and the specific operational realities of engineering.
Methodology: Adapting the Balanced Scorecard
The authors utilize the Balanced Scorecard (BSC) as their foundation. However, a standard corporate BSC doesn't perfectly fit a project management context. To bridge this gap, they translated the four traditional BSC pillars into project-specific categories:
- Benefits Perspective (formerly Financial): Focuses on cost reduction and profit maximization.
- Related Participator Perspective (formerly Customer): Focuses on the satisfaction of contractors, suppliers, and government.
- Operational Perspective (formerly Internal Process): Focuses on the efficiency of communication and decision-making.
- Strategic Competitiveness Perspective (formerly Learning and Growth): Focuses on corporate image and personnel quality.
The Three-Dimensional Evaluation Model
The core contribution of this paper is the expansion of the evaluation into a three-dimensional model. This approach provides a more multifaceted and comprehensive index than traditional 1D or 2D models by integrating the following axes:
- Dimension 1: BSC Perspectives. The four adapted categories (Operational, Benefits, Strategic, and Participator).
- Dimension 2: Project Life Cycle. Stages including Decision, Design, Construction, and Operation. This acknowledges that the value of IT changes over time.
- Dimension 3: Performance Grades. A grading system ranging from Excellent to Poor.
Key Insights and Results
The primary result is the conceptual framework itself, which highlights several critical management principles:
- Stakeholder-Centricity: Unlike traditional models that focus only on the "customer," this model emphasizes "Related Participators." In engineering, the success of IT depends on the "full participation" of sub-contractors, supervisors, and suppliers.
- Dynamic Evaluation: By including the project life cycle, the model accounts for the shifting impact of IT tools across different phases. A tool that is highly effective during the "Design" phase might have a different impact during "Operation."
- Intangible Value: The model explicitly includes "Strategic Competitiveness," acknowledging that while things like "international cooperation" or "corporate image" are hard to quantify, they are vital outcomes of digital maturity.
Conclusion and Future Work
While the paper provides a robust theoretical framework, it lacks empirical validation. The model has not yet been tested against real-world project data, and a mathematical weighting system for the indicators remains to be developed. Future research should involve applying this model to specific construction projects to refine the indicators and develop a quantitative scoring algorithm, such as using the Analytic Hierarchy Process or Fuzzy Evaluation.