Introduction
Coordinating heterogeneous robot teams requires solving three deeply interdependent problems: allocation (who does what), scheduling (when they do it), and motion planning (how they get there). Traditionally, multi-robot systems (MRS) solve these in a linear pipeline. However, this sequential approach often fails because an allocation that seems optimal may be temporally impossible to schedule or physically unreachable due to environmental obstacles. When a downstream step fails, the system must backtrack, leading to significant computational overhead or mission failure.
To address this, we introduce ITAGS (Incremental Task Allocation Graph Search), a framework that interleaves these three steps using a trait-based search algorithm. By checking feasibility at every step of the allocation process, ITAGS significantly outperforms traditional sequential methods in both speed and task completion rates.
Methodology: The ITAGS Framework
ITAGS moves away from assigning specific robots to tasks. Instead, it utilizes Trait-Based Modeling, where tasks specify required capabilities (e.g., "water capacity" or "payload"). This allows the system to generalize across different robot types and naturally form coalitions where multiple robots work together to meet a single requirement.
Interleaved Hierarchy
The core of ITAGS is a three-layer architecture that communicates bidirectionally to ensure feasibility:
- Task Allocation Layer: Performs a greedy best-first search on an incremental graph to assign robot traits to tasks.
- Scheduling Layer: Uses Simple Temporal Networks (STN) and Tabu search to ensure timing and precedence constraints are met.
- Motion Planning Layer: Verifies the existence of collision-free paths and provides travel time estimates to the scheduler.
The TETAQ Heuristic
To guide the search efficiently, we developed the Time-Extended Task Allocation Quality (TETAQ) heuristic. This metric is a convex combination of the Allocation Percentage Remaining (APR)—how close the team is to meeting trait requirements—and the Normalized Schedule Quality (NSQ)—the efficiency of the resulting schedule (minimizing makespan). This allows the search to prune branches of the search tree that are physically or temporally impossible before wasting computational resources.
Evaluation and Results
We evaluated ITAGS in a simulated emergency response domain using maps from the Robocup Rescue Competition. Scenarios ranged from 6–12 robots with up to 45 tasks, including a high-stress set with 20 robots.
Performance Gains
ITAGS demonstrated a 100% task completion rate across all test cases. In comparison, state-of-the-art baselines like CFLA2 and CCF only managed 32.4% and 56.4% completion, respectively. ITAGS was also significantly faster, averaging 11.54 seconds to find a solution, compared to 153.61 seconds for CFLA2.
The Interleaving Advantage
When compared to a sequential version of the same algorithm, the interleaved approach showed dramatic improvements in both plan quality and efficiency. Interleaved ITAGS produced schedules with a 168% shorter makespan (total execution time) while requiring 17% less computation time.
Key Insights and Future Work
The primary advantage of interleaving is early pruning. By allowing the motion planner and scheduler to "veto" invalid allocations early, the search avoids deep, unproductive branches of the allocation graph. We also observed that the parameter $\alpha$ (weighting APR vs. NSQ) is critical; a balanced approach prevents the memory exhaustion typical of pure schedule-focused searches.
Future work will focus on decentralizing the framework to improve resilience against communication failures and incorporating dynamic obstacles to better handle uncertainty in real-world environments.
Summary updated