Abstract
Regional integrated energy system coupling with multienergy devices, energy storage devices, and renewable energy devices has been regarded as one of the most promising solutions for future energy systems. Planning for existing natural gas and electricity network expansion, regional integrated energy system locations, or system equipment types and capacities are urgent problems in infrastructure development. This article employs a joint planning model to address these; however, the joint planning model ignores the potential ownerships by three agents, for which investment decisions are generally made by different investors. In this work, the joint planning model is decomposed into three distributed planning subproblems related to the corresponding stakeholders, and the alternating direction method of multipliers is adopted to solve the tripartite distributed planning problem. The effectiveness of the planning model is verified on an updated version of the Institute of Electrical and Electronics Engineers (IEEE) 24-bus electric system, the Belgian 20-node natural gas system, and three assumed integrated energy systems. Simulation results illustrate that a distributed planning model is more sensitive to individual load differences, which is precisely the defect of the joint planning model. Moreover, the algorithm performance considering rates of convergence and the impacts of penalty parameters is further analyzed.
Introduction
As the global energy landscape shifts toward low-carbon solutions, the integration of diverse energy vectors—electricity, natural gas, heating, and cooling—has become a priority. Traditional planning approaches often rely on centralized joint models that assume a single entity controls all infrastructure. However, in practice, natural gas networks (GN), electricity networks (EN), and Regional Integrated Energy Systems (RIES) are typically managed by independent stakeholders with distinct economic objectives and proprietary data. This paper proposes a distributed planning framework that respects these institutional boundaries while ensuring optimal system-wide expansion.
Methodology
Distributed Planning via ADMM
The core of the proposed model is the decomposition of the centralized planning objective into three independent subproblems using the Alternating Direction Method of Multipliers (ADMM). This approach allows GN, EN, and RIES agents to optimize their respective systems locally while coordinating through a "handshake" process.
Instead of a single global optimization, agents iterate by exchanging information on energy flows—specifically, the power transmitted by networks and the power required by regional hubs. A key innovation is the introduction of an "Intermediate Power" (IP) variable, which accounts for the physical realities and potential losses of energy in transit between nodes, a factor often overlooked in centralized models.
Regional Integrated Energy System (RIES) Modeling
The RIES component is modeled using energy hub theory, which describes the conversion and storage of multiple energy forms.
As shown in the figure above, the RIES integrates various technologies:
- Conversion Devices: Combined Cooling, Heating, and Power (CCHP) units, gas boilers (GB), and absorption chillers (AC).
- Renewable Energy: Photovoltaic (PV) panels and wind turbines (WT).
- Storage Systems: Battery Energy Storage Systems (BESS), Thermal Energy Storage Systems (TESS), and Cold Energy Storage Systems (CESS).
Case Study and Results
Simulation Setup
The model was validated using a multi-network testbed:
- Electricity: An updated IEEE 24-bus system.
- Natural Gas: The Belgian 20-node gas network.
- RIES: Three distinct regional systems with varying load profiles to test sensitivity to local demand variations.
Key Findings
- Cost and Realism: The total planning cost for the distributed model was $47.62M, approximately 12.87% higher than the centralized model ($42.19M). While the centralized model appears more "optimal" on paper, the distributed model is more realistic as it accounts for the infrastructure requirements of energy transmission and stakeholder independence.
- Sensitivity to Local Loads: The distributed approach proved significantly more sensitive to individual RIES load differences. In centralized models, local nuances often get averaged out, whereas the ADMM-based model directly reflects local demand in the sub-problem results.
- Convergence and Parameters: The study identified that the ADMM penalty parameter ($\rho$) is critical for stability. A range of $[100, 200]$ was found to provide the best balance between convergence speed and accuracy.
Conclusion
This research demonstrates that a distributed planning approach using ADMM provides a robust and realistic framework for multi-energy infrastructure development. By allowing independent stakeholders to make autonomous decisions while maintaining global coordination, the model addresses the practical challenges of modern energy system ownership. Future work will focus on improving computational efficiency through intelligent initialization and exploring non-linear gas flow approximations.