Foundations of Prescriptive Process Monitoring

Irene Teinemaa, Niek Tax, Massimiliano de Leoni, Marlon Dumas, Fabrizio Maria Maggi

Abstract

While Predictive Process Monitoring (PPM) has advanced the ability to forecast process outcomes, it often fails to provide actionable guidance for decision-makers. This paper introduces a formal prescriptive framework that bridges the gap between prediction and action. By integrating a parameterized cost model with empirical thresholding, the framework determines the optimal moment to intervene in a business process. We evaluate this approach across multiple real-world datasets, demonstrating that cost-optimized intervention strategies significantly outperform traditional predictive baselines.

Introduction

In the field of Business Process Management (BPM), Predictive Process Monitoring (PPM) has enabled organizations to anticipate failures before they occur. However, a high-probability prediction of failure does not inherently dictate a course of action. Every intervention carries a cost—be it resource allocation, employee time, or potential customer friction. Conversely, inaction in the face of a likely failure leads to tangible losses. This paper addresses the critical need for a formal, cost-aware logic that prescribes when to act, moving beyond simple probability to financial rationality.

The Prescriptive Framework

The proposed framework transitions from binary predictions to prescriptive decisions by balancing the expected costs of intervention against the potential losses of undesired outcomes. It is built upon three primary pillars.

1. The Parameterized Cost Model

Central to the framework is a cost model that quantifies the trade-offs involved in process interventions. It defines four primary variables:

  • Cost of Intervention ($c_{in}$): The direct expense of attempting to mitigate a failure.
  • Cost of Undesired Outcome ($c_{out}$): The loss incurred if the process fails despite intervention or due to inaction.
  • Cost of Compensation ($c_{com}$): The penalty for a "false alarm," such as the cost of rectifying an unnecessary intervention.
  • Mitigation Effectiveness ($eff$): The probability that an intervention successfully prevents an undesired outcome.

The relationship between these variables and the resulting costs for different outcomes is summarized in the following table:

Cost matrix for prescriptive process monitoring decisions.

2. The Alarm System and Empirical Thresholding

The framework employs a probabilistic classifier (such as Random Forest or Gradient Boosted Trees) to estimate the likelihood of failure at any given step of a process trace. An "agent" then decides whether to trigger an alarm based on a probability threshold ($\tau$).

Rather than relying on a default threshold (like 0.5), the authors utilize Empirical Thresholding. Using the Tree-structured Parzen Estimator (TPE) optimization technique, the system searches for a threshold that minimizes the total expected cost based on historical data. This ensures that the alarm sensitivity is tuned to the specific economic constraints of the business environment.

Key Insights

  • The ROI Condition: For an intervention to be rational, the expected saving ($eff \cdot c_{out}$) must exceed the cost of intervention ($c_{in}$).
  • Temporal Decay: The framework explicitly models the decay of mitigation effectiveness over time. Early interventions are often more effective but based on less certain predictions, while later interventions are more accurate but less powerful. The system must find the "sweet spot" where accuracy and effectiveness are balanced.
  • Dynamic Thresholding: Optimal thresholds are not static. They shift based on the ratio of failure costs to intervention costs. In high-stakes environments where failure is catastrophic, the system naturally adopts a lower threshold for action, prioritizing safety over the cost of false alarms.

Evaluation and Results

The framework was evaluated using three real-life event logs: BPIC2017 (loan applications), Road Traffic Fines, and UWV (unemployment benefits).

The results consistently showed that TPE-optimized thresholding outperformed standard baselines, including "always alarm," "never alarm," and fixed-threshold strategies. Gradient Boosted Trees (GBT) generally provided the most robust predictive foundation for the prescriptive agent. Furthermore, the system demonstrated significant resilience across varying cost scenarios, proving its ability to adapt to different business priorities and risk tolerances.

Conclusion and Future Directions

This work establishes a foundational logic for prescriptive process monitoring. By grounding interventions in a formal cost-benefit analysis, organizations can move from passive observation to proactive, economically sound management.

Future research will address several remaining challenges, including:

  • Resource Constraints: Incorporating queueing theory to account for limited human or technical resources available to handle alarms.
  • Multi-type Interventions: Expanding the framework to choose between multiple types of actions (e.g., automated vs. manual) based on their respective costs and effectiveness.
  • Dynamic Costs: Integrating real-time fluctuations in operational costs to further refine the prescriptive logic.

Summary updated

BibTeX
@inproceedings{teinemaa2018foundations,
  author = {Irene Teinemaa and Niek Tax and Massimiliano de Leoni and Marlon Dumas and Fabrizio Maria Maggi},
  title = {{Foundations of Prescriptive Process Monitoring}},
  booktitle = {BPM (Forum)},
  year = {2018},
  doi = {10.1007/978-3-319-98651-7\_6},
}
Figure