A plan manager for multi-robot systems

Sylvain Joyeux, Rachid Alami, Simon Lacroix

TL;DR

This paper introduces a "plan database" (pDB) component that acts as a central hub for managing and executing multi-robot plans. It enables dynamic plan updates, safe concurrent execution, and distributed supervision even without constant communication, paving the way for more flexible and robust multi-robot coordination.

What Problem Does This Paper Address?

Coordinating multiple robots in complex, dynamic environments is a significant challenge. Existing multi-robot architectures often struggle with:

  • Limited interaction prediction: Team management layers typically issue high-level commands, failing to proactively plan for nuanced, low-level interactions between robots.
  • Communication dependency: Many systems assume constant communication, which is unrealistic in real-world scenarios where connections can be lost.
  • Lack of a shared plan representation: Robots may have different views of the overall plan, leading to inconsistencies and difficulties in managing complex interactions.
  • Inflexibility: Existing systems are often tied to specific planning mechanisms or interaction schemes, making them hard to adapt to new scenarios or integrate with different tools.

This paper aims to bridge this gap by providing a unified, flexible, and robust framework for managing multi-robot plans.

Methods

The core contribution is the Plan Database (pDB) component. It's designed to:

  • Manage dynamic plans: The pDB can handle plans that are constantly evolving, with tasks being inserted or removed.
  • Facilitate safe concurrent execution: It provides mechanisms to ensure that plans are executed safely, even when they are being modified simultaneously.
  • Enable distributed supervision: Robots can manage their plans and coordinate with others without needing a continuous communication link.
  • Act as a middle-man: The pDB sits between the robot's functional layer (perception and action) and the plan generation components.
  • Support negotiation: It uses a "transaction" mechanism, acting as a distributed whiteboard, allowing robots to propose, modify, and agree upon plan changes collaboratively. This ensures that plan modifications are atomic and applied simultaneously across all involved robots.
  • Handle communication failures: The system is designed to be robust to intermittent communication, allowing plans to continue execution even when robots are temporarily disconnected.

Datasets

Not discussed in the paper. The paper focuses on a simulated rover/UAV scenario.

Key Insights and Ideas

  • Transactions as a collaborative whiteboard: The concept of using "transactions" for plan modification is a powerful way to manage distributed negotiation and ensure atomic updates across multiple robots. This avoids the need for a central coordinator and allows for flexible, emergent cooperation.
  • Decoupling planning and execution: The pDB allows for simultaneous planning and execution, with a decision control layer managing conflicts and choices. This is crucial for adapting to dynamic environments.
  • Generic interaction handling: By not being tied to specific interaction schemes, the pDB can integrate various multi-robot coordination strategies, making it a versatile tool.
  • Abstraction for multi-robot contexts: The ability for robots to use intermediate levels of abstraction for task models (e.g., a UAV understanding a rover's high-level goal without needing its detailed task implementation) simplifies inter-robot communication and plan management.

Key Results

The paper demonstrates the effectiveness of the pDB through a simulated scenario involving a rover and a UAV exploring an unknown environment.

  • Successful cooperation: The simulated rover/UAV interaction, where the UAV acts as a remote sensor or maps along the rover's path, consistently led to the rover reaching its goal, unlike when the rover operated alone.
  • Robustness to communication loss: The system's design inherently handles situations where communication is not permanent, a critical aspect for real-world multi-robot deployments.
  • Modularity and integration: The implementation in Ruby and the use of existing modules (Genom) highlight the system's modularity and ease of integration with functional layers.

Limitations and Future Work

  • Error recovery in multi-robot contexts: The paper acknowledges that multi-robot error recovery is not fully distributed and is currently handled either through conditional plans or reactive negotiation. This is an area for further development.
  • Handling bad predictions during disconnection: While the system can make predictions for remote tasks during disconnection, recovering from incorrect predictions is not addressed.
  • Integration of temporal information: The authors identify the need to integrate temporal information into plans to better handle communication loss, such as for setting up rendezvous points.
  • Real-world deployment: While the simulation is promising, the paper mentions that real-robot implementation is underway, suggesting that real-world performance and challenges are yet to be fully explored.

Summary updated

Abstract

Summary. This paper presents a software component, the plan database, which provides the services needed to build and execute plans in a multi-robot context. This plan database handles fully dynamic plans (insertion and removal of tasks), provides tools for safe concurrent execution and modification of plans, and handles distributed plan supervision without permanent robot-to-robot communication. The proposed concept is illustrated by a simulated example that involves a rover and an UAV in an initially unmapped environment. 1
BibTeX
@article{joyeux2009plan,
  author = {Sylvain Joyeux and Rachid Alami and Simon Lacroix},
  title = {{A plan manager for multi-robot systems}},
  journal = {Int. J. Robotics res},
  year = {2009},
  doi = {10.1177/0278364908098370},
}
Figure