Abstract
This paper proposes a cooperative multi-robot system (CMRS) modeling method called fuzzy timed agent based Petri nets (FTAPN), which has been extended from fuzzy timed object-oriented Petri net (FTOPN). The proposed FTAPN can be used to model and illustrate both the structural and dynamic aspects of CMRS. Supervised learning is supported in FTAPN. As a special type of high-level object, agent is introduced, which is used as a common modeling object in FTAPN models. The proposed FTAPN can not only be used to model CMRS and represent system aging effect, but also be refined into the object-oriented implementation easily. At the same time, it can also be regarded as a conceptual and practical artificial intelligence (AI) tool for multi-agent system (MAS) into the mainstream practice of software development.
Introduction
Cooperative Multi-Robot Systems (CMRS) are essential for modern high-efficiency manufacturing, but they are notoriously difficult to model. Unlike generic control systems, CMRS must account for "social" cooperation, real-time temporal constraints, and the ability to learn from the environment. Existing Multi-Agent System (MAS) models often use object-oriented methodologies, but these frequently fail to capture the dynamic aspects of cooperation and timing.
This paper introduces Fuzzy Timed Agent Based Petri Nets (FTAPN), a modeling framework designed to handle the complex, time-sensitive cooperation required in multi-robot systems. By combining fuzzy logic, temporal constraints, and agent-oriented programming, the authors provide a way to model both the structure and the dynamic learning behavior of robots in industrial settings.
The FTAPN Framework
The authors propose FTAPN as an extension of the Fuzzy Timed Object-oriented Petri Net (FTOPN) framework. A core innovation is the integration of agents as high-level objects.
Agent Integration
The model incorporates the "active object" concept from the ACTALK framework. An agent is defined by three components: its address, its activity, and its behavior. This structure allows for the modeling of complex autonomous behavior without losing the structural clarity of a standard Petri Net.
Fuzzy Timing and Learning
Instead of rigid timestamps, FTAPN uses fuzzy functions to evaluate the "degree" of an object firing based on time. This allows the system to represent "aging effects" and imprecise temporal constraints. Furthermore, FTAPN supports supervised learning, where model parameters are estimated based on experimental time-series data from input and output nodes (places) in the Petri Net, rather than being manually hardcoded.
Modeling Cooperative Multi-Robot Systems
The authors demonstrated the FTAPN method using a theoretical modeling example of a wafer etching platform in the circuit industry. This system utilizes two robots to transfer unprocessed wafers and fetch processed ones.
The model successfully depicted how two robots can cooperate (e.g., coordinating transfer and fetch operations) without conflict. It effectively illustrated both the physical layout of the system (structural) and the time-dependent rules of robot behavior (dynamic). Because the model is built on object-oriented principles, the high-level design can be directly translated into software implementation.
Key Insights
- Bridging AI and Engineering: FTAPN serves as a tool that brings Artificial Intelligence concepts, such as MAS, into mainstream software development and industrial engineering.
- Dynamic Parameter Estimation: The ability to "train" Petri Net parameters using experimental data allows the model to adapt to specific hardware or environmental conditions that are difficult to predict during the design phase.
Conclusion and Future Work
While the FTAPN method provides a clear methodology for overcoming development hurdles in agent-oriented software engineering, it has some limitations. As a conceptual framework, it currently lacks deep quantitative comparison against other modeling methods regarding computational speed or fuzzy logic accuracy. Additionally, the scalability of the Petri Net as the number of robots or tasks increases remains to be explored. Future work will involve further analysis and simulation to validate the model's performance in larger-scale industrial environments.
Summary updated