Planning with State Dependent Action Costs

This direction is merged into another direction: state-dependent action costs. Its last version stays readable and citable here.

Version 1 of 117 papers26 conceptsfrozen 2026-10-04

In classical automated planning, we usually assume that every action has a fixed price. Moving a robot from point A to point B costs the same amount of energy whether the robot is carrying a heavy load or traveling light. However, real-world costs are rarely static; they are context-dependent. The difficulty of an assembly task changes based on the stability of the current sub-assembly, and the time required to drill a hole depends on the current orientation of the workpiece.

Research into State-Dependent Action Costs (SDAC) moves away from these rigid assumptions, allowing the cost of an action to be a function of the state in which it is applied.

The Cost of Context

The intuition behind state-dependency is best seen in manufacturing and robotics. As Caroline C. Hayes noted in A Model of Planning for Plan Efficiency, expert machinists don't just look for a sequence of steps; they look for "operator overlap." If two different tasks require the same machine setup, performing them back-to-back is cheaper than separating them. Similarly, Ming Tan and Jeffrey C. Schlimmer demonstrated in Two Case Studies in Cost-Sensitive Concept Acquisition that for a physical robot, the cost of "sensing" a feature depends entirely on the robot's current physical configuration relative to the object.

When costs are dynamic, the planning problem shifts from finding the shortest path in a graph with fixed weights to finding an optimal path where the weights of the edges change as you traverse them.

Representing Dynamic Costs

If the cost of an action can change based on every possible state variable, how do we represent it without an exponential explosion of data?

Florian Geißer, Thomas Keller 0001, and Robert Mattmüller addressed this in Delete Relaxations for Planning with State-Dependent Action Costs by using Edge-Valued Multi-valued Decision Diagrams (EVMDDs). These diagrams provide a compact way to map state variables to specific costs. By embedding these functions into the planning model, researchers can generalize traditional heuristics like $h^{add}$, which were originally designed for constant costs.

In more complex numeric environments, Francesco Leofante and colleagues proposed Optimal Planning Modulo Theories, which encodes cost functions as numeric expressions. This allows solvers to use formal logic and arithmetic to find globally optimal plans even when costs fluctuate wildly based on continuous variables like fuel levels or velocity.

Heuristics and Search Strategies

The primary challenge of SDAC is that traditional search algorithms rely on "cheap" heuristics to prune the search space. If calculating the cost of an action is itself a complex computation—such as running a simulation or a database query—the search slows to a crawl.

To solve this, Masataro Asai and his team developed Delayed Expansion A (DEA) in Efficient Optimal Search under Expensive Edge Cost Computation. DEA* uses optimistic, low-cost estimates to explore the graph and only computes the "true" expensive state-dependent cost when absolutely necessary.

Furthermore, Thomas Keller 0001 and Florian Pommerening introduced State-Dependent Cost Partitioning (SDCP) in State-Dependent Cost Partitionings for Cartesian Abstractions in Classical Planning. Instead of assigning a global cost to an action, SDCP distributes the cost across different abstractions of the state space. This allows the planner to capture context-specific information, such as the fact that a "move" action is only expensive when the robot's battery is low.

Learning and Real-World Application

As we move toward integrating machine learning with planning, the focus has shifted to predicting these costs from data. In Decision-Focused Learning to Predict Action Costs for Planning, Jayanta Mandi and Jörg Hoffmann 0001 argue that models should be trained to minimize plan regret rather than simple prediction error. This "planning-aware" learning ensures that the model prioritizes accuracy for the specific state-action pairs that most impact the final plan's efficiency.

These techniques have found utility in diverse fields:

By treating cost as a dynamic property of the environment rather than a static attribute of an action, these researchers have created a more flexible and realistic framework for automated decision-making.

Papers in this version

History & citationVersion 1 · 2026-10-04

Merged into another direction · Permanent link

View frozen version 1

Cite this direction

Latest version (a living page):

@misc{lacuna_planning_with_state_dependent_action_cos_f9eea2ef,
  title = {Planning with State Dependent Action Costs},
  author = {{Lacuna}},
  howpublished = {Lacuna research direction},
  year = {2026},
  url = {https://lacuna.tiptreesystems.com/direction/planning-with-state-dependent-action-costs/rdr_f9eea2ef10c743dda4ff0301cd285a13},
  note = {Latest version of a living research direction; cite a version for a fixed text. Accessed 2026-11-27},
}

This exact version (version 1, frozen text):

@misc{lacuna_planning_with_state_dependent_action_cos_f9eea2ef_v1,
  title = {Planning with State Dependent Action Costs},
  author = {{Lacuna}},
  howpublished = {Lacuna research direction},
  year = {2026},
  url = {https://lacuna.tiptreesystems.com/direction/planning-with-state-dependent-action-costs/rdr_f9eea2ef10c743dda4ff0301cd285a13/v/1},
  note = {Version 1, frozen 2026-10-04. Accessed 2026-11-27},
}