IEEE 39-bus system

21 papers · 52 extracted observations · transient stability assessment · Markdown · CSV · JSON API

Also indexed as: ieee-39-bus-system

Comparable Cohort Timeline (proposed/measured methods; excludes quoted baselines)

Proposed/measured results on test (including prose scores where split is implicit).

93.695.897.9100.0202120232025TrAdaBoost (Training dataset): 95.35 (2021)TrAdaBoost (augmented dataset): 95.44 (2021)PGNN (Parallel Graph Neural Network): 94.1 (2025)PGNN (Parallel Graph Neural Network): 100.0 (2025)
Click any point on the timeline to inspect method, protocol, and paper.

Showing 52 of 52 matching observations.

YearMethodMetricScoreProtocol / FacetsPaper & Evidence
2026LASS-ODE-Power (listed as LASS-ODE in the table) proposedOver-frequency MSE (× 10^-2)0.120-shot · bus=31 · disturbance=0.1 p.u. load decreasePredicting Power-System Dynamic Trajectories with Foundation Models
Source quote
L423: Bus 31 │ Zero-shot │ 0.12 │ 166.40 │ 53.00 │ 26.29 │ 3.37 │ 29.88 │ 43.64 │ 5.00
2026LASS-ODE-Power (listed as LASS-ODE in the table) proposedUnder-frequency MSE (× 10^-2)3.370-shot · bus=31 · disturbance=0.1 p.u. load increasePredicting Power-System Dynamic Trajectories with Foundation Models
Source quote
L423: Bus 31 │ Zero-shot │ 0.12 │ 166.40 │ 53.00 │ 26.29 │ 3.37 │ 29.88 │ 43.64 │ 5.00
2026TimerXL baselineOver-frequency MSE (× 10^-2)26.290-shot · bus=31 · disturbance=0.1 p.u. load decreasePredicting Power-System Dynamic Trajectories with Foundation Models
Source quote
L423: Bus 31 │ Zero-shot │ 0.12 │ 166.40 │ 53.00 │ 26.29 │ 3.37 │ 29.88 │ 43.64 │ 5.00
2026TimerXL baselineUnder-frequency MSE (× 10^-2)5.000-shot · bus=31 · disturbance=0.1 p.u. load increasePredicting Power-System Dynamic Trajectories with Foundation Models
Source quote
L423: Bus 31 │ Zero-shot │ 0.12 │ 166.40 │ 53.00 │ 26.29 │ 3.37 │ 29.88 │ 43.64 │ 5.00
2025Proposed Method (W/ LDM) proposedError2.47%variant=with LDM · sampling_points=6000Deep Generative Model-Aided Power System Dynamic State Estimation and Reconstruction with Unknown Control Inputs or Data Distributions
Source quote
L357: Proposed Method │ \multirow{2}{*}{23.93} │ \multirow{2}{*}{2.47%} │ \multirow{2}{*}{2.67%} │ \multirow{2}{*}{31.78} │ \multirow{2}{*}{2.19%} │ \multirow{2}{*}{1.33%}
2025Proposed Method (W/ LDM) proposedTime23.93 svariant=with LDM · sampling_points=6000Deep Generative Model-Aided Power System Dynamic State Estimation and Reconstruction with Unknown Control Inputs or Data Distributions
Source quote
L357: Proposed Method │ \multirow{2}{*}{23.93} │ \multirow{2}{*}{2.47%} │ \multirow{2}{*}{2.67%} │ \multirow{2}{*}{31.78} │ \multirow{2}{*}{2.19%} │ \multirow{2}{*}{1.33%}
2025Proposed Method (W/ LDM) proposedRatio2.67%variant=with LDM · sampling_points=6000Deep Generative Model-Aided Power System Dynamic State Estimation and Reconstruction with Unknown Control Inputs or Data Distributions
Source quote
L357: Proposed Method │ \multirow{2}{*}{23.93} │ \multirow{2}{*}{2.47%} │ \multirow{2}{*}{2.67%} │ \multirow{2}{*}{31.78} │ \multirow{2}{*}{2.19%} │ \multirow{2}{*}{1.33%}
2025PGNN (Parallel Graph Neural Network) proposedOC-Acc94.1%split: testEfficient Extreme Operating Condition Search for Online Relay Setting Calculation in Renewable Power Systems Based on Parallel Graph Neural Network
Source quote
L340: 39 │ 94.1% │ 96.5% │ 99.5% │ 99.6% │ 100%
2025PGNN (Parallel Graph Neural Network) proposedPS-Acc100%split: testEfficient Extreme Operating Condition Search for Online Relay Setting Calculation in Renewable Power Systems Based on Parallel Graph Neural Network
Source quote
L340: 39 │ 94.1% │ 96.5% │ 99.5% │ 99.6% │ 100%
2025proposed analytical sensitivity formula (Eq. sensitivity) proposedsensitivity D_beta12.5493split: test · beta=0.95 for generators; generated with InverseBeta (beta_0,k=0.95) for lines · perturbation=u_ij=√2/2 for lines (2,3) and (23,24); zero for remaining linesInverse Chance Constrained Optimal Power Flow
Source quote
L224: The analytical sensitivity computed by \eqref{sensitivity} is 12.5493,
2025finite-difference estimate baselinesensitivity D_beta12.2301split: test · beta=0.95 for generators; generated with InverseBeta (beta_0,k=0.95) for lines · perturbation=u_ij=√2/2 for lines (2,3) and (23,24); zero for remaining lines · finite-difference-step=10^-3Inverse Chance Constrained Optimal Power Flow
Source quote
L225: which closely matches the finite-difference result 12.2301 (step size 10 (-3)),
2024Cyber defense game proposedDefender cyber-defense effort at Nash equilibrium (u_d^NE)0.58game-parameters=γ(u_d)=√u_d+0.1; ζ(u_a)=2.5 log(u_a+1)+0.1; C_d=C_a=0.2u²Integrated Cyber-Physical Resiliency for Power Grids under IoT-Enabled Dynamic Botnet Attacks
Source quote
L716: To find the NE of the cyber defense game, the defender and attacker respond to each other's action optimally and repeatedly, as shown in Fig.~\ref{fig:cyber_game_nash}. The defender and attacker's optimal response functions are depicted in Fig.~\ref{fig:cyber_game_nash.1}. The intersection of two functions shows that the game admits a NE (u_d (NE), u_a (NE)) = (0.58, 0.76), which specifies the defense and attack strategies at the cyber layer.
2024Cyber defense game proposedAttacker cyberattack effort at Nash equilibrium (u_a^NE)0.76game-parameters=γ(u_d)=√u_d+0.1; ζ(u_a)=2.5 log(u_a+1)+0.1; C_d=C_a=0.2u²Integrated Cyber-Physical Resiliency for Power Grids under IoT-Enabled Dynamic Botnet Attacks
Source quote
L716: To find the NE of the cyber defense game, the defender and attacker respond to each other's action optimally and repeatedly, as shown in Fig.~\ref{fig:cyber_game_nash}. The defender and attacker's optimal response functions are depicted in Fig.~\ref{fig:cyber_game_nash.1}. The intersection of two functions shows that the game admits a NE (u_d (NE), u_a (NE)) = (0.58, 0.76), which specifies the defense and attack strategies at the cyber layer.
2024Neural-PI-0.3 (fixed controller) baselineMean total cost21.91split: test · inertia=variable · controller=Neural-PI-0.3 · test-trajectories=100Online Event-Triggered Switching for Frequency Control in Power Grids With Variable Inertia
Source quote
L391: Neural-PI-0.3 │ 21.91 │ 7.11 │ 21.58 │ 6.97 │ 0.32 │ 0.16
2023Proposed multi-step constraint screening with ground-truth generator states proposed non-standard slicescreening rate95.3%scenario=sample-aware · generator-states=ground-truthFast Constraint Screening for Multi-Interval Unit Commitment
Source quote
L19: To address such challenges, we develop one of the first multi-interval UC constraint screening models to narrow down the search space of line flow constraints reliably, leading to screening strategy with more efficient performance. Our key insights lie on integrating the temporal constraints, i.e., the ramping constraints to the standard screening model, and such approach can be applied for either given load region or individual load sample. The potential of utilizing the ML predictions of generator states to improve the screening efficiency is also explored. Specifically, we formulate a tractable linear programming problem for multi-interval UC, and prove that more inactive constraints can be eliminated without changing the feasible region of original UC problem. Moreover, our method can be flexibly integrated to screen constraints for either one specific load vector, or to achieve solver warm-start (offline constraint screening beforehand to get the reduced problem which can be later used for real-time operation problem) for a given load region. We term these two cases as sample-aware~\cite{zhai2010fast} and sample-agnostic~\cite{roald2019implied} constraint screening respectively. Specially, for the sample-aware case, we further propose to make use of ML prediction on commitment schedule to better limit the search space of the constraint screening problem. In the sample-aware case on IEEE 39-bus system, our proposed method with ground truth generator states can achieve 95.3% screening rate, achieving a boost compared to the standard constraint screening~\cite{zhai2010fast} (82%). With partial predictions, the feasible rate of our method reach 84% while the solution gap is only 0.32%. In the sample-agnostic case on 118-bus, our procedure can also find the most compact form of UC problem after the more efficient screening process.
2023Proposed multi-step constraint screening with partial KNN predictions proposedfeasible rate84%split: val · K=5 · scenario=sample-aware · prediction-interval=4 · generator-state-predictions=partial KNN · validation-samples-per-case=50Fast Constraint Screening for Multi-Interval Unit Commitment
Source quote
L19: To address such challenges, we develop one of the first multi-interval UC constraint screening models to narrow down the search space of line flow constraints reliably, leading to screening strategy with more efficient performance. Our key insights lie on integrating the temporal constraints, i.e., the ramping constraints to the standard screening model, and such approach can be applied for either given load region or individual load sample. The potential of utilizing the ML predictions of generator states to improve the screening efficiency is also explored. Specifically, we formulate a tractable linear programming problem for multi-interval UC, and prove that more inactive constraints can be eliminated without changing the feasible region of original UC problem. Moreover, our method can be flexibly integrated to screen constraints for either one specific load vector, or to achieve solver warm-start (offline constraint screening beforehand to get the reduced problem which can be later used for real-time operation problem) for a given load region. We term these two cases as sample-aware~\cite{zhai2010fast} and sample-agnostic~\cite{roald2019implied} constraint screening respectively. Specially, for the sample-aware case, we further propose to make use of ML prediction on commitment schedule to better limit the search space of the constraint screening problem. In the sample-aware case on IEEE 39-bus system, our proposed method with ground truth generator states can achieve 95.3% screening rate, achieving a boost compared to the standard constraint screening~\cite{zhai2010fast} (82%). With partial predictions, the feasible rate of our method reach 84% while the solution gap is only 0.32%. In the sample-agnostic case on 118-bus, our procedure can also find the most compact form of UC problem after the more efficient screening process.
2023Proposed multi-step constraint screening with partial predictions proposedobjective-value gap between reduced and original UC problems0.32%scenario=sample-aware · comparison=reduced vs original UC objective · generator-state-predictions=partialFast Constraint Screening for Multi-Interval Unit Commitment
Source quote
L347: Sample-aware screening tasks: We consider three scenarios: i) without generator statuses predictions, ii) with partial predictions, and iii) with ground truth are considered to verify the effectiveness of the proposed method. When there is no generator statuses predictions, our multi-step method reduces 81.16% of line limits as shown in Table.\ref{table2}. With partial predictions, the number of remaining constraints of multi-step is only 69% of single-step method, and the CPU time solving the original problem is 1.103 times faster than single-step method according to Table \ref{table4}. It can be seen that multi-step method can always eliminate more inactive constraints, and thus taking less time to solve the reduced UC problem. Besides, the infeasible rate of the original problem is only 16%, and the gap of objective value between the reduced and the original UC problem is only 0.32%. Note that the bias between the solution of binary variables obtained by the screening model and the UC problem does not cause the infeasible case due to the line limits misidentification, which verifies Corollary 3. According to Fig. \ref{fig4}, the case with the ground truth can eliminate the most inactive constraints, while with the partial predictions the remaining constraints can still be sufficiently reduced compared to the case without prediction.
2023Standard constraint screening baseline non-standard slicescreening rate82%scenario=sample-aware · generator-states=ground-truthFast Constraint Screening for Multi-Interval Unit Commitment
Source quote
L19: To address such challenges, we develop one of the first multi-interval UC constraint screening models to narrow down the search space of line flow constraints reliably, leading to screening strategy with more efficient performance. Our key insights lie on integrating the temporal constraints, i.e., the ramping constraints to the standard screening model, and such approach can be applied for either given load region or individual load sample. The potential of utilizing the ML predictions of generator states to improve the screening efficiency is also explored. Specifically, we formulate a tractable linear programming problem for multi-interval UC, and prove that more inactive constraints can be eliminated without changing the feasible region of original UC problem. Moreover, our method can be flexibly integrated to screen constraints for either one specific load vector, or to achieve solver warm-start (offline constraint screening beforehand to get the reduced problem which can be later used for real-time operation problem) for a given load region. We term these two cases as sample-aware~\cite{zhai2010fast} and sample-agnostic~\cite{roald2019implied} constraint screening respectively. Specially, for the sample-aware case, we further propose to make use of ML prediction on commitment schedule to better limit the search space of the constraint screening problem. In the sample-aware case on IEEE 39-bus system, our proposed method with ground truth generator states can achieve 95.3% screening rate, achieving a boost compared to the standard constraint screening~\cite{zhai2010fast} (82%). With partial predictions, the feasible rate of our method reach 84% while the solution gap is only 0.32%. In the sample-agnostic case on 118-bus, our procedure can also find the most compact form of UC problem after the more efficient screening process.
2022Proposed terminal-voltage calculation method proposedMaximum error percentage across all nodes0.21%fault=nearby three-phase short circuit at node 30 · wind-farm=PMSG-WTG · fault-duration=3.0–3.1 sA Dynamic Equivalent Method for PMSG-WTG Based Wind Farms Considering wind Speeds and Fault Severities
Source quote
L428: When \alpha ^{f (-')}-pcc=0.2250, the terminal voltages of PMSG-WTGs at the moment before fault clearance can be calculated using the method proposed in Section V.A. The calculation results are compared with the simulation results of detailed model, as shown in figure. \ref{fig_17}. The maximum error percentage of all nodes is 0.21%, which proves the validity of the method proposed in Section V.A.
2022RT-IFGSM (SAC-based UVLS model) proposedAER-27157.80split: test · model=SAC-based UVLS · access=white-box · attack=RT-IFGSMExploring the Vulnerability of Deep Reinforcement Learning-based Emergency Control for Low Carbon Power Systems
Source quote
L334: -27157.80
2022RT-IFGSM (SAC-based UVLS model) proposedBRR0.394split: test · model=SAC-based UVLS · access=white-box · attack=RT-IFGSMExploring the Vulnerability of Deep Reinforcement Learning-based Emergency Control for Low Carbon Power Systems
Source quote
L335: 0.394
2022RT-IFGSM with DB-RDP defense (SAC-based UVLS model) proposedAER-8709.32split: test · model=SAC-based UVLS · access=white-box · attack=RT-IFGSM · defense=DB-RDPExploring the Vulnerability of Deep Reinforcement Learning-based Emergency Control for Low Carbon Power Systems
Source quote
L338: -8709.32
2022RT-IFGSM with DB-RDP defense (SAC-based UVLS model) proposedBRR0.159split: test · model=SAC-based UVLS · access=white-box · attack=RT-IFGSM · defense=DB-RDPExploring the Vulnerability of Deep Reinforcement Learning-based Emergency Control for Low Carbon Power Systems
Source quote
L339: 0.159
2022No attack (SAC-based UVLS model) baselineAER-2301.33split: test · model=SAC-based UVLS · attack=noneExploring the Vulnerability of Deep Reinforcement Learning-based Emergency Control for Low Carbon Power Systems
Source quote
L243: -2301.33
2022No attack (SAC-based UVLS model) baselineBRR0.007split: test · model=SAC-based UVLS · attack=noneExploring the Vulnerability of Deep Reinforcement Learning-based Emergency Control for Low Carbon Power Systems
Source quote
L244: 0.007
2022Naive estimator (VSM m*_3) baselineinertia-0.0008 p.u.scenario=mixed synchronous-generator/VSMParameter Estimation in Ill-conditioned Low-inertia Power Systems
Source quote
L232: m^*_3 = {\bf 0.0019} │ 0.0019 (-0.042e-03) │ -0.0008 (-1.4535)
2022Naive estimator (VSM m*_4) baselineinertia-0.0002 p.u.scenario=mixed synchronous-generator/VSMParameter Estimation in Ill-conditioned Low-inertia Power Systems
Source quote
L233: m^*_4 = {\bf 0.0015} │ 0.0015 (-0.031e-03) │ -0.0002 (-0.8677)
2022Naive estimator (VSM m*_5) baselineinertia-0.0002 p.u.scenario=mixed synchronous-generator/VSMParameter Estimation in Ill-conditioned Low-inertia Power Systems
Source quote
L234: m^*_5 = {\bf 0.0014} │ 0.0014 (-0.873e-03) │ -0.0002 (-1.1791)
2021TrAdaBoost (augmented dataset) proposedFP (unsafe misclassification)1.55%dataset=augmented · evaluation=N-1 pre-fault · contingency=line 21-22Versatile and Robust Transient Stability Assessment via Instance Transfer Learning
Source quote
L110: TrAdaBoost │ Augmented │ 1.55% │ 92.74% │ 96.13% │ 97.35% │ 95.44%
2021TrAdaBoost (Training dataset) proposedFP (unsafe misclassification)2.30%dataset=training · evaluation=N-1 pre-fault · contingency=line 21-22Versatile and Robust Transient Stability Assessment via Instance Transfer Learning
Source quote
L112: TrAdaBoost │ Training │ 2.30% │ 94.13% │ 94.25% │ 96.16% │ 95.35%
2021TrAdaBoost (augmented dataset) proposedAcc.95.44%dataset=augmented · evaluation=N-1 pre-fault · contingency=line 21-22Versatile and Robust Transient Stability Assessment via Instance Transfer Learning
Source quote
L110: TrAdaBoost │ Augmented │ 1.55% │ 92.74% │ 96.13% │ 97.35% │ 95.44%
2021TrAdaBoost (Training dataset) proposedAcc.95.35%dataset=training · evaluation=N-1 pre-fault · contingency=line 21-22Versatile and Robust Transient Stability Assessment via Instance Transfer Learning
Source quote
L112: TrAdaBoost │ Training │ 2.30% │ 94.13% │ 94.25% │ 96.16% │ 95.35%
2021TrAdaBoost (augmented dataset) proposedPre. (precision)96.13%dataset=augmented · evaluation=N-1 pre-fault · contingency=line 21-22Versatile and Robust Transient Stability Assessment via Instance Transfer Learning
Source quote
L110: TrAdaBoost │ Augmented │ 1.55% │ 92.74% │ 96.13% │ 97.35% │ 95.44%
2021TrAdaBoost (augmented dataset) proposedSpe. (specificity)97.35%dataset=augmented · evaluation=N-1 pre-fault · contingency=line 21-22Versatile and Robust Transient Stability Assessment via Instance Transfer Learning
Source quote
L110: TrAdaBoost │ Augmented │ 1.55% │ 92.74% │ 96.13% │ 97.35% │ 95.44%
2021SI-DNN proposedAverage Test MSE3.3split: test · mse-scale=×10^-3 · training-size=10Learning to Solve the AC-OPF using Sensitivity-Informed Deep Neural Networks
Source quote
L350: 10 │ 8.6 │ 738 │ 3.3 │ 746
2021BCU + expansion (N=6) proposedCCT0.540model=lossless · fault-bus=3 · fault-type=three-phase short-circuit · expansion-iterations=6Approaching the Transient Stability Boundary of a Power System: Theory and Applications
Source quote
L457: 3 │ 23.42 │ 0.669 │ 16.15 │ 0.519 │ -22.40 │ 2.156 │ 0.528 │ -21.15 │ 0.047 │ 0.532 │ -20.53 │ 0.114 │ 0.540 │ -19.28 │ 0.269
2021SINDy proposedExecution time86 mshardware=MacBook Pro, 2.3 GHz Dual-Core Intel Core i5, 8GB RAMA Comparison of Data-Driven Techniques for Power Grid Parameter Estimation.
Source quote
L186: SINDy (IEEE 39-bus) │ 86~ms
2021P-DNN baselineAverage Test MSE8.6split: test · mse-scale=×10^-3 · training-size=10Learning to Solve the AC-OPF using Sensitivity-Informed Deep Neural Networks
Source quote
L350: 10 │ 8.6 │ 738 │ 3.3 │ 746
2021Step-by-Step (SBS) trajectory simulation baselineCCT0.669model=lossless · fault-bus=3 · fault-type=three-phase short-circuitApproaching the Transient Stability Boundary of a Power System: Theory and Applications
Source quote
L457: 3 │ 23.42 │ 0.669 │ 16.15 │ 0.519 │ -22.40 │ 2.156 │ 0.528 │ -21.15 │ 0.047 │ 0.532 │ -20.53 │ 0.114 │ 0.540 │ -19.28 │ 0.269
2021BCU baselineCCT0.519model=lossless · fault-bus=3 · fault-type=three-phase short-circuitApproaching the Transient Stability Boundary of a Power System: Theory and Applications
Source quote
L457: 3 │ 23.42 │ 0.669 │ 16.15 │ 0.519 │ -22.40 │ 2.156 │ 0.528 │ -21.15 │ 0.047 │ 0.532 │ -20.53 │ 0.114 │ 0.540 │ -19.28 │ 0.269
2021Step-by-Step (SBS) trajectory simulation baselineCCT0.281model=lossy · fault-bus=3 · fault-type=three-phase short-circuitApproaching the Transient Stability Boundary of a Power System: Theory and Applications
Source quote
L517: 3 │ 13.18 │ 0.281 │ 9.60 │ 0.239 │ -14.89 │ 1.653 │ 0.248 │ -11.93 │ 0.013 │ 0.252 │ -10.45 │ 0.030 │ 0.264 │ -6.00 │ 0.063
2021BCU baselineCCT0.239model=lossy · fault-bus=3 · fault-type=three-phase short-circuitApproaching the Transient Stability Boundary of a Power System: Theory and Applications
Source quote
L517: 3 │ 13.18 │ 0.281 │ 9.60 │ 0.239 │ -14.89 │ 1.653 │ 0.248 │ -11.93 │ 0.013 │ 0.252 │ -10.45 │ 0.030 │ 0.264 │ -6.00 │ 0.063
2020Model-free end-to-end learning framework proposedloss in dispatch cost8.24%Compared with the conventional approach benchmark on the IEEE 39-bus system.Effective End-to-End Learning Framework for Economic Dispatch
Source quote
L488: Figure \ref{IEEE39} illustrates the performance improvement of the model-free framework, compared with the conventional approach as a benchmark. While our framework generates 72.85% more load prediction error, it does reduce the loss in dispatch cost by 8.24%.
2020Proposed minimum-weight feedback-edge-set D-FACTS placement proposedD-FACTS deployment-set size (|L_D|)8 linksDeployment set intended to enable detection of CCPAs against any transmission line.Moving-Target Defense Against Cyber-Physical Attacks in Power Grids via Game Theory
Source quote
L449: IEEE 39-bus system │ 36 │ 8
2020Proposed negotiation algorithm with incentive function proposedExpected rewards during negotiation503,800 $agent=7 · iteration=1 · RUL-scenario-paths=50 · simulation-horizon=365 daysMulti-agent maintenance scheduling based on the coordination between central operator and decentralized producers in an electricity market
Source quote
L515: 7 │ 503,800 │ 704,100 │ 704,100
2020Proposed negotiation algorithm with incentive function proposedExpected rewards during negotiation662,900 $agent=10 · iteration=1 · RUL-scenario-paths=50 · simulation-horizon=365 daysMulti-agent maintenance scheduling based on the coordination between central operator and decentralized producers in an electricity market
Source quote
L517: 10 │ 662,900 │ 1,054,000 │ 1,455,800
2020Proposed negotiation algorithm with incentive function proposedExpected rewards during negotiation1,054,000 $agent=10 · iteration=2 · RUL-scenario-paths=50 · simulation-horizon=365 daysMulti-agent maintenance scheduling based on the coordination between central operator and decentralized producers in an electricity market
Source quote
L517: 10 │ 662,900 │ 1,054,000 │ 1,455,800
2020Proposed negotiation algorithm with incentive function proposedExpected rewards during negotiation1,455,800 $agent=10 · iteration=3 · RUL-scenario-paths=50 · simulation-horizon=365 daysMulti-agent maintenance scheduling based on the coordination between central operator and decentralized producers in an electricity market
Source quote
L517: 10 │ 662,900 │ 1,054,000 │ 1,455,800
2019Proposed graph-theoretic D-FACTS deployment set proposedSize of D-FACTS deployment set (|\mathcal{L}_D|)8 linksMinimum-sized deployment set for detecting CCPAs against any transmission line.Moving-Target Defense for Detecting Coordinated Cyber-Physical Attacks in Power Grids
Source quote
L275: IEEE 39-bus system │ 36 │ 8
2018Algorithm 2 pruning step baselinefalse-positive edges eliminated after Step 958 %Pruning step; reported in many cases.Physics informed topology learning in networks of linear dynamical systems
Source quote
L356: Consider the neighbors (green) and two-hop neighbors (red) of node 25 in the IEEE 39 bus system as shown in Fig~\ref{fig:ieee_39_node25}. Application of steps 1 to 9 of Algorithm 1 with a threshold \rho of 10 (-5) in step \ref{step_nonzero} and 6.5 × 10^6 phase samples per node leads to edges between node 25 and all nodes in Fig.~\ref{fig:ieee_39_node25}(b). The absolute values of the phase response of the multivariate Wiener filters for node 25 and the nodes in its two-hop neighborhood are shown in Fig.~\ref{fig:phase_1hops}(a). It is seen that the phase response of the Wiener filters corresponding to the nodes two hops away are close to \pi rad, while that of the neighbor nodes start from 0 rad. Thus using the pruning step, all the two-hop neighbors can be removed, recovering the true physical topology. The relative error percentage in topology estimation for the IEEE 39 bus system as a function of sample size is shown in Fig.~\ref{fig:error_proportion}(b). The threshold \rho was chosen as 10 (-3) while \tau = 0.2 \pi. In many cases, pruning step eliminated 58 % of the total false positive edges obtained after step 9 of Algorithm 2.
2017WLS via Gauss-Newton (GN-based)Empirical success rate64%split: testPower System State Estimation via Feasible Point Pursuit: Algorithms and Cramer-Rao Bound.
Source quote
L443: GN-based │ 100% │ 100% │ 100% │ 100% │ 87% │ 64%
2013Sparsity-promoting WAC controller K*_1 (γ=1) proposedTolerable time-delay margin for the remote feedback signal3.964 sgamma=1Sparsity-Promoting Optimal Wide-Area Control of Power Networks
Source quote
L368: For the wide-area controller~\subscr{u}{wac}(t) = -K-1 (*)x(t), if the local control \subscr{u}{wac}^{\textup{(loc)}}(t) is absorbed in the plant, then we obtain a 58.303 (\circ) phase margin with respect to the remote control input \subscr{u}{wac}^{\textup{(rem)}}(t). The corresponding tolerable time-delay margin is 3.964\,\textup{s}. {From a simulation of the linearized power grid model \eqref{eq: power network model}, we observe that a delay of 750\textup{ms} of the remote feedback signal \subscr{u}{wac}^{\textup{(rem)}}(t) does not significantly affect the closed-loop performance; see Fig.~\ref{Fig: time-series NE 2}(c) and Fig.~\ref{Fig: time-series NE 2}(f). In the delayed case, only a slight distortion of the trajectories of generator 1 (which is implementing the remote WAC signal \subscr{u}{wac}^{\textup{(rem)}}(t)) is noticed.}