IEEE 14-bus
14 papers · 30 extracted observations · power network topology control · Markdown · CSV · JSON API
Also indexed as: ieee-14-bus
Metricmean episode length (6)error rate (3)mean time s (2)average adp attack detection probability (2)computation time (2)ac power flow convergence rate conv (2)
Showing 30 of 30 matching observations.
| Year | Method | Metric | Score | Protocol / Facets | Paper & Evidence |
|---|---|---|---|---|---|
| 2026 | Proposed feasibility-aware hierarchical diffusion framework proposed | AC power-flow convergence rate (Conv.) | 98.6% | split: val | Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint DistributionSource quoteL412: Ours │ 98.6 │ 0.934 │ 76.8 │ 94.5 │ 0.912 │ -- │ 92.8 │ 0.876 │ 68.5 │ 100 │ 0.581 │ -- |
| 2026 | Proposed feasibility-aware hierarchical diffusion framework proposed | Single-line-outage survivability rate (N--1) | 76.8% | Reported for transmission systems; for each convergent sample, each branch is removed a… | Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint DistributionSource quoteL412: Ours │ 98.6 │ 0.934 │ 76.8 │ 94.5 │ 0.912 │ -- │ 92.8 │ 0.876 │ 68.5 │ 100 │ 0.581 │ -- |
| 2026 | PowerGrow | AC power-flow convergence rate (Conv.) | 93.2% | split: val | Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint DistributionSource quoteL413: PowerGrow \cite{he2026powergrow} │ 93.2 │ 0.806 │ 65.4 │ 86.5 │ 0.774 │ -- │ 85.4 │ 0.721 │ 55.7 │ 100 │ 0.529 │ -- |
| 2026 | PowerGrow | Single-line-outage survivability rate (N--1) | 65.4% | Reported for transmission systems; for each convergent sample, each branch is removed a… | Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint DistributionSource quoteL413: PowerGrow \cite{he2026powergrow} │ 93.2 │ 0.806 │ 65.4 │ 86.5 │ 0.774 │ -- │ 85.4 │ 0.721 │ 55.7 │ 100 │ 0.529 │ -- |
| 2025 | MTD-strengthened DNN (p=6, K=10) proposed non-standard slice | Recall rate | 0.942 | split: test · K=10 · p=6 · test-set=ν1 · attack-magnitude=ν=0.05 · physics-based-MTD=absent | Moving Target Defense Against Adversarial False Data Injection Attacks In Power GridsSource quoteL366: MTD-strengthened DNN (p=6, K=10) │ 0.942 │ 3832 │ 0 |
| 2025 | MTD-strengthened DNN (p=6, K=10) proposed non-standard slice | Time | 3832 s | split: test · K=10 · p=6 · test-set=ν1 · attack-magnitude=ν=0.05 · physics-based-MTD=absent | Moving Target Defense Against Adversarial False Data Injection Attacks In Power GridsSource quoteL366: MTD-strengthened DNN (p=6, K=10) │ 0.942 │ 3832 │ 0 |
| 2025 | BDD strengthened using Physics-based MTD (SPA=0.4) baseline non-standard slice | Increase in OPF costs | 1.6% | split: test · SPA=0.4 · test-set=ν1 · attack-magnitude=ν=0.05 | Moving Target Defense Against Adversarial False Data Injection Attacks In Power GridsSource quoteL368: BDD strengthened using Physics-based MTD (\text{SPA}=0.4) │ >0.99 │ 0 │ 1.6% |
| 2024 | CRP-based LME proposed | LME calculation-time speedup | 25.2x | samples=1000 · hardware=Apple M1 MacBook Air, 8 GB RAM · comparison=IF-based LME | Is Locational Marginal Price All You Need for Locational Marginal Emission?Source quoteL190: We use the CRP-based, IF-based, and FD-based methods to obtain the LMEs for unseen load samples and compare their average calculation time as shown in Fig. \ref{Comparison_Time}. The FD-based method takes the longest time in all cases, always thousands of times longer than the other methods, reaching up to 36.7 seconds per sample in the 118-bus system case. This is because it requires solving two SCED problems for each node to compute the finite difference. Compared to the IF-based method, our proposed method achieves significant acceleration, with speedups of 25.2x, 29.5x, and 22.0x for the 14-, 39-, and 118-bus systems, respectively. This demonstrates that mapping the load sample to the specific critical region is much faster than using the implicit function. In most cases, the three methods produce the same LME results. However, in the 39-bus system, the proposed method may yield different results for few samples due to slight deviations in the calculation of generation sensitivity, which are amplified by the emission rates. Following the resulting generation policy ensures valid LMEs, with only a slight difference in total emissions from the optimal value, as the generation policy is nearly identical. |
| 2023 | PPO Hierarchical proposed | Mean episode length | 5124.69 | split: test · outages=with | Hierarchical Reinforcement Learning for Power Network Topology ControlSource quoteL377: Mean episode length │ 5124.69 (5147.66) │ 4052.91 (4169.29) |
| 2023 | DeepWP proposed | RMSE(\widehat{\pi}) | 0.62 $/MWh | split: test · wind-farms=1 · test-scenarios=1000 · trained-models=100 · transmission-capacity=uniformly scaled to provoke congestion | Price-Aware Deep Learning for Electricity MarketsSource quoteL101: 14\_ieee │ 14 │ 100 │ 1.00 │ 0.35 │ 0.62 │ 1.52 │ 0 │ 0.35 │ +0.6% │ 0.61 │ -0.6% │ 1.50 │ -0.8% │ 0 │ --- |
| 2023 | DCP (independent variables \vec{\nu}, \cev{\nu}; polar representation) proposed | Mean optimality gap | 0.05% | split: test · formulation=independent-variables · representation=polar | Dual conic proxies for AC optimal power flowSource quoteL888: 0.05 |
| 2023 | PPO Substation ablation | Mean episode length | 8064 | split: test · outages=without | Hierarchical Reinforcement Learning for Power Network Topology ControlSource quoteL328: Mean episode length │ 7720.16 (7843.9505) │ 7781.99 (7917.48) │ 8064 (8045.63) │ 7522.95 (7736.74) │ 7821.42 (7724.33) │ 7659.32 (7809.46) |
| 2023 | PPO Substation ablation | Mean episode length | 4052.91 | split: test · outages=with | Hierarchical Reinforcement Learning for Power Network Topology ControlSource quoteL377: Mean episode length │ 5124.69 (5147.66) │ 4052.91 (4169.29) |
| 2023 | SAC Native baseline | Mean episode length | 7522.95 | split: test · outages=without | Hierarchical Reinforcement Learning for Power Network Topology ControlSource quoteL328: Mean episode length │ 7720.16 (7843.9505) │ 7781.99 (7917.48) │ 8064 (8045.63) │ 7522.95 (7736.74) │ 7821.42 (7724.33) │ 7659.32 (7809.46) |
| 2023 | SAC Native baseline | Mean episode length | 4277.88 | split: test · outages=with | Hierarchical Reinforcement Learning for Power Network Topology ControlSource quoteL378: 3688.20 (4054.57) │ 4277.88 (4449.58) │ 2429.20 (2698.70) │ 911.25 (950.16) |
| 2023 | Greedy baseline | Mean episode length | 911.25 | split: test · outages=with | Hierarchical Reinforcement Learning for Power Network Topology ControlSource quoteL378: 3688.20 (4054.57) │ 4277.88 (4449.58) │ 2429.20 (2698.70) │ 911.25 (950.16) |
| 2022 | GISMO proposed | Total Cost | 42,392 | evaluation=AC-constrained reconstruction | Continuous Switch Model and Heuristics for Mixed-Integer Problems in Power SystemsSource quoteL408: 39,00 │ 3,392 │ 42,392 |
| 2021 | Robust MTD proposed non-standard slice | Average ADP (attack detection probability) | 87.5% | rho=[15,20) · attack-type=random AC-FDI · power-grid-model=full AC · false-positive-rate=5% | Robust Moving Target Defence Against False Data Injection Attacks in Power GridsSource quoteL527: [15,20) │ 44.5% │ 92.4% │ 43.4% │ 87.5% │ 36.0% │ 69.1% |
| 2021 | Max-Rk (max-rank MTD) baseline non-standard slice | Average ADP (attack detection probability) | 43.4% | rho=[15,20) · attack-type=random AC-FDI · power-grid-model=full AC · false-positive-rate=5% | Robust Moving Target Defence Against False Data Injection Attacks in Power GridsSource quoteL527: [15,20) │ 44.5% │ 92.4% │ 43.4% │ 87.5% │ 36.0% │ 69.1% |
| 2020 | NeuralDeco proposed | Solution feasibility ratio | 95.97 | input-load-variation=high | Learning to Solve Network Flow Problems via Neural DecodingSource quoteL421: {NeuralDeco} │ 98.49 │ 96.15 │ 93.19 │ 99.91 │ 98.16 │ 93.47 │ 99.23 │ 98.14 │ 95.97 |
| 2020 | End to End baseline | Solution feasibility ratio | 86.31 | input-load-variation=high | Learning to Solve Network Flow Problems via Neural DecodingSource quoteL419: {End to End} │ 96.36 │ 96.04 │ 90.39 │ 96.06 │ 95.78 │ 93.77 │ 96.64 │ 96.14 │ 86.31 |
| 2019 | Proposed branch-selection algorithm (Algorithms 1 and 2) proposed non-standard slice | Dimension of the stealthy attack space | 6 | selection=Algorithms 1 and 2 combined · D-FACTS-devices=10 · branch-eligibility=all branches | Analysis of Moving Target Defense Against False Data Injection Attacks on Power GridSource quoteL530: Evaluation of our algorithm. First, with the IEEE 14-bus power system, we evaluate the selection of the set of target-perturbation branches with Algorithm 1 and Algorithm 2. A total number of 10 D-FACTS devices are given for constructing/realizing MTD. We assume that all branches in this power system can be perturbed. With the aim to minimize the dimension of the stealthy attack space and maximize the number of covered buses, we adopt Algorithm 1 and 2 in Section IV-D1. From Algorithm 1, we obtain a set of target-perturbation branches as \{k_1, k_3, k_4, k_7, k_8, k-11, k-12\}. From Algorithm 2, we obtain a set of target-perturbation branches as \{k-16, k-17, k-20\}. We get the final set of the target-perturbation branches by combining these two sets. With this MTD, the dimension of the stealthy attack space is 6 and the number of covered buses is 13. The target-perturbation branches deployed with D-FACTS devices are shown in Fig. \ref{fig:output_from_our_algorithm}. For comparison, if we optionally perturb the set of branches \{k_1, k_2, k_3, k_4, k_5, k-6, k-7, k_8, k_9, k-10\} (Fig. \ref{fig:not_chose_correctly}), the dimension of stealthy attack space is 8 and the number of the covered buses is 8. This indicates that the output from our algorithm is better than the optional selections. |
| 2017 | Sce(50%) (scenario approach) proposed | Mean Time(s) | 7.63 s | scenario-removal=50% · demand-response-programs=2 | Scenario-Based Economic Dispatch With Uncertain Demand ResponseSource quoteL376: Sce(50%) │ 7.63 │ 5.84 |
| 2017 | Deterministic LAV (ADMM-based prox-linear solver) proposed | Computation time | 0.062 s | case=noiseless · solver=ADMM-based prox-linear · profile=default voltage profile · ADMM-iterations=up to 150 | Robust and Scalable Power System State Estimation via Composite Optimization.Source quoteL446: Deterministic LAV │ 6 │ 0.062 |
| 2017 | Rob (Robust) baseline | Mean Time(s) | 20.71 s | demand-response-programs=2 | Scenario-Based Economic Dispatch With Uncertain Demand ResponseSource quoteL374: Rob │ 20.71 │ 17.14 |
| 2017 | Regular LSE baseline | Mean-Square Estimation Error | 0.1434 | scenario=S3 | PSSE Redux: Convex Relaxation, Decentralized, Robust, and Dynamic ApproachesSource quoteL578: (S3) │ 0.0367 │ 0.1434 │ 0.0407 │ 0.0390 |
| 2017 | LNRT estimator (threshold 3.0) baseline | Mean-Square Estimation Error | 0.0407 | scenario=S3 · threshold=3.0 | PSSE Redux: Convex Relaxation, Decentralized, Robust, and Dynamic ApproachesSource quoteL578: (S3) │ 0.0367 │ 0.1434 │ 0.0407 │ 0.0390 |
| 2017 | Huber's estimator (λ=1.34) baseline | Mean-Square Estimation Error | 0.0390 | lambda=1.34 · scenario=S3 | PSSE Redux: Convex Relaxation, Decentralized, Robust, and Dynamic ApproachesSource quoteL578: (S3) │ 0.0367 │ 0.1434 │ 0.0407 │ 0.0390 |
| 2017 | Gauss-Newton baseline | Computation time | 0.071 s | case=noiseless · profile=default voltage profile | Robust and Scalable Power System State Estimation via Composite Optimization.Source quoteL445: Gauss-Newton~\cite{AburExpositoBook} │ 5 │ 0.071 |
| 2014 | Min_Input_PS (minimum-size input-set algorithm) proposed | Number of input nodes required | 4 nodes | gamma=π/3 · coupling=inverse line-impedance magnitudes · frequency-distribution=zero-mean Gaussian, variance 8 | Global Practical Node and Edge Synchronization in Kuramoto Networks: A Submodular Optimization FrameworkSource quoteL861: Figure \ref{fig:power_simulation}(a) illustrates input selection for a given set of intrinsic frequencies. The variance of the intrinsic frequencies was equal to 8. The dark squares indicate input nodes selected by our algorithm (|A| = 4). We observe that each non-input node is at most two hops away from an input node, which suggests that centrally located nodes are more likely to be candidates for inputs. On the other hand, nodes with high degree were not necessarily chosen as inputs. Additional information beyond the network topology, including the intrinsic frequencies and the coupling coefficients between nodes, is incorporated into the input selection process. |