YearMethodMetricScoreProtocol / FacetsPaper & Evidence
2026Proposed feasibility-aware hierarchical diffusion framework proposedAC power-flow convergence rate (Conv.)98.6%split: valOperationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution
Source quote
L412: Ours │ 98.6 │ 0.934 │ 76.8 │ 94.5 │ 0.912 │ -- │ 92.8 │ 0.876 │ 68.5 │ 100 │ 0.581 │ --
2026Proposed feasibility-aware hierarchical diffusion framework proposedSingle-line-outage survivability rate (N--1)76.8%Reported for transmission systems; for each convergent sample, each branch is removed a…Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution
Source quote
L412: Ours │ 98.6 │ 0.934 │ 76.8 │ 94.5 │ 0.912 │ -- │ 92.8 │ 0.876 │ 68.5 │ 100 │ 0.581 │ --
2026PowerGrowAC power-flow convergence rate (Conv.)93.2%split: valOperationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution
Source quote
L413: PowerGrow \cite{he2026powergrow} │ 93.2 │ 0.806 │ 65.4 │ 86.5 │ 0.774 │ -- │ 85.4 │ 0.721 │ 55.7 │ 100 │ 0.529 │ --
2026PowerGrowSingle-line-outage survivability rate (N--1)65.4%Reported for transmission systems; for each convergent sample, each branch is removed a…Operationally Feasible Synthetic Power-Grid Scenarios via Learning the AC-Operable Joint Distribution
Source quote
L413: PowerGrow \cite{he2026powergrow} │ 93.2 │ 0.806 │ 65.4 │ 86.5 │ 0.774 │ -- │ 85.4 │ 0.721 │ 55.7 │ 100 │ 0.529 │ --
2025MTD-strengthened DNN (p=6, K=10) proposed non-standard sliceRecall rate0.942split: test · K=10 · p=6 · test-set=ν1 · attack-magnitude=ν=0.05 · physics-based-MTD=absentMoving Target Defense Against Adversarial False Data Injection Attacks In Power Grids
Source quote
L366: MTD-strengthened DNN (p=6, K=10) │ 0.942 │ 3832 │ 0
2025MTD-strengthened DNN (p=6, K=10) proposed non-standard sliceTime3832 ssplit: test · K=10 · p=6 · test-set=ν1 · attack-magnitude=ν=0.05 · physics-based-MTD=absentMoving Target Defense Against Adversarial False Data Injection Attacks In Power Grids
Source quote
L366: MTD-strengthened DNN (p=6, K=10) │ 0.942 │ 3832 │ 0
2025BDD strengthened using Physics-based MTD (SPA=0.4) baseline non-standard sliceIncrease in OPF costs1.6%split: test · SPA=0.4 · test-set=ν1 · attack-magnitude=ν=0.05Moving Target Defense Against Adversarial False Data Injection Attacks In Power Grids
Source quote
L368: BDD strengthened using Physics-based MTD (\text{SPA}=0.4) │ >0.99 │ 0 │ 1.6%
2024CRP-based LME proposedLME calculation-time speedup25.2xsamples=1000 · hardware=Apple M1 MacBook Air, 8 GB RAM · comparison=IF-based LMEIs Locational Marginal Price All You Need for Locational Marginal Emission?
Source quote
L190: We use the CRP-based, IF-based, and FD-based methods to obtain the LMEs for unseen load samples and compare their average calculation time as shown in Fig. \ref{Comparison_Time}. The FD-based method takes the longest time in all cases, always thousands of times longer than the other methods, reaching up to 36.7 seconds per sample in the 118-bus system case. This is because it requires solving two SCED problems for each node to compute the finite difference. Compared to the IF-based method, our proposed method achieves significant acceleration, with speedups of 25.2x, 29.5x, and 22.0x for the 14-, 39-, and 118-bus systems, respectively. This demonstrates that mapping the load sample to the specific critical region is much faster than using the implicit function. In most cases, the three methods produce the same LME results. However, in the 39-bus system, the proposed method may yield different results for few samples due to slight deviations in the calculation of generation sensitivity, which are amplified by the emission rates. Following the resulting generation policy ensures valid LMEs, with only a slight difference in total emissions from the optimal value, as the generation policy is nearly identical.
2023PPO Hierarchical proposedMean episode length5124.69split: test · outages=withHierarchical Reinforcement Learning for Power Network Topology Control
Source quote
L377: Mean episode length │ 5124.69 (5147.66) │ 4052.91 (4169.29)
2023DeepWP proposedRMSE(\widehat{\pi})0.62 $/MWhsplit: test · wind-farms=1 · test-scenarios=1000 · trained-models=100 · transmission-capacity=uniformly scaled to provoke congestionPrice-Aware Deep Learning for Electricity Markets
Source quote
L101: 14\_ieee │ 14 │ 100 │ 1.00 │ 0.35 │ 0.62 │ 1.52 │ 0 │ 0.35 │ +0.6% │ 0.61 │ -0.6% │ 1.50 │ -0.8% │ 0 │ ---
2023DCP (independent variables \vec{\nu}, \cev{\nu}; polar representation) proposedMean optimality gap0.05%split: test · formulation=independent-variables · representation=polarDual conic proxies for AC optimal power flow
Source quote
L888: 0.05
2023PPO Substation ablationMean episode length8064split: test · outages=withoutHierarchical Reinforcement Learning for Power Network Topology Control
Source quote
L328: Mean episode length │ 7720.16 (7843.9505) │ 7781.99 (7917.48) │ 8064 (8045.63) │ 7522.95 (7736.74) │ 7821.42 (7724.33) │ 7659.32 (7809.46)
2023PPO Substation ablationMean episode length4052.91split: test · outages=withHierarchical Reinforcement Learning for Power Network Topology Control
Source quote
L377: Mean episode length │ 5124.69 (5147.66) │ 4052.91 (4169.29)
2023SAC Native baselineMean episode length7522.95split: test · outages=withoutHierarchical Reinforcement Learning for Power Network Topology Control
Source quote
L328: Mean episode length │ 7720.16 (7843.9505) │ 7781.99 (7917.48) │ 8064 (8045.63) │ 7522.95 (7736.74) │ 7821.42 (7724.33) │ 7659.32 (7809.46)
2023SAC Native baselineMean episode length4277.88split: test · outages=withHierarchical Reinforcement Learning for Power Network Topology Control
Source quote
L378: 3688.20 (4054.57) │ 4277.88 (4449.58) │ 2429.20 (2698.70) │ 911.25 (950.16)
2023Greedy baselineMean episode length911.25split: test · outages=withHierarchical Reinforcement Learning for Power Network Topology Control
Source quote
L378: 3688.20 (4054.57) │ 4277.88 (4449.58) │ 2429.20 (2698.70) │ 911.25 (950.16)
2022GISMO proposedTotal Cost42,392evaluation=AC-constrained reconstructionContinuous Switch Model and Heuristics for Mixed-Integer Problems in Power Systems
Source quote
L408: 39,00 │ 3,392 │ 42,392
2021Robust MTD proposed non-standard sliceAverage ADP (attack detection probability)87.5%rho=[15,20) · attack-type=random AC-FDI · power-grid-model=full AC · false-positive-rate=5%Robust Moving Target Defence Against False Data Injection Attacks in Power Grids
Source quote
L527: [15,20) │ 44.5% │ 92.4% │ 43.4% │ 87.5% │ 36.0% │ 69.1%
2021Max-Rk (max-rank MTD) baseline non-standard sliceAverage ADP (attack detection probability)43.4%rho=[15,20) · attack-type=random AC-FDI · power-grid-model=full AC · false-positive-rate=5%Robust Moving Target Defence Against False Data Injection Attacks in Power Grids
Source quote
L527: [15,20) │ 44.5% │ 92.4% │ 43.4% │ 87.5% │ 36.0% │ 69.1%
2020NeuralDeco proposedSolution feasibility ratio95.97input-load-variation=highLearning to Solve Network Flow Problems via Neural Decoding
Source quote
L421: {NeuralDeco} │ 98.49 │ 96.15 │ 93.19 │ 99.91 │ 98.16 │ 93.47 │ 99.23 │ 98.14 │ 95.97
2020End to End baselineSolution feasibility ratio86.31input-load-variation=highLearning to Solve Network Flow Problems via Neural Decoding
Source quote
L419: {End to End} │ 96.36 │ 96.04 │ 90.39 │ 96.06 │ 95.78 │ 93.77 │ 96.64 │ 96.14 │ 86.31
2019Proposed branch-selection algorithm (Algorithms 1 and 2) proposed non-standard sliceDimension of the stealthy attack space6selection=Algorithms 1 and 2 combined · D-FACTS-devices=10 · branch-eligibility=all branchesAnalysis of Moving Target Defense Against False Data Injection Attacks on Power Grid
Source quote
L530: Evaluation of our algorithm. First, with the IEEE 14-bus power system, we evaluate the selection of the set of target-perturbation branches with Algorithm 1 and Algorithm 2. A total number of 10 D-FACTS devices are given for constructing/realizing MTD. We assume that all branches in this power system can be perturbed. With the aim to minimize the dimension of the stealthy attack space and maximize the number of covered buses, we adopt Algorithm 1 and 2 in Section IV-D1. From Algorithm 1, we obtain a set of target-perturbation branches as \{k_1, k_3, k_4, k_7, k_8, k-11, k-12\}. From Algorithm 2, we obtain a set of target-perturbation branches as \{k-16, k-17, k-20\}. We get the final set of the target-perturbation branches by combining these two sets. With this MTD, the dimension of the stealthy attack space is 6 and the number of covered buses is 13. The target-perturbation branches deployed with D-FACTS devices are shown in Fig. \ref{fig:output_from_our_algorithm}. For comparison, if we optionally perturb the set of branches \{k_1, k_2, k_3, k_4, k_5, k-6, k-7, k_8, k_9, k-10\} (Fig. \ref{fig:not_chose_correctly}), the dimension of stealthy attack space is 8 and the number of the covered buses is 8. This indicates that the output from our algorithm is better than the optional selections.
2017Sce(50%) (scenario approach) proposedMean Time(s)7.63 sscenario-removal=50% · demand-response-programs=2Scenario-Based Economic Dispatch With Uncertain Demand Response
Source quote
L376: Sce(50%) │ 7.63 │ 5.84
2017Deterministic LAV (ADMM-based prox-linear solver) proposedComputation time0.062 scase=noiseless · solver=ADMM-based prox-linear · profile=default voltage profile · ADMM-iterations=up to 150Robust and Scalable Power System State Estimation via Composite Optimization.
Source quote
L446: Deterministic LAV │ 6 │ 0.062
2017Rob (Robust) baselineMean Time(s)20.71 sdemand-response-programs=2Scenario-Based Economic Dispatch With Uncertain Demand Response
Source quote
L374: Rob │ 20.71 │ 17.14
2017Regular LSE baselineMean-Square Estimation Error0.1434scenario=S3PSSE Redux: Convex Relaxation, Decentralized, Robust, and Dynamic Approaches
Source quote
L578: (S3) │ 0.0367 │ 0.1434 │ 0.0407 │ 0.0390
2017LNRT estimator (threshold 3.0) baselineMean-Square Estimation Error0.0407scenario=S3 · threshold=3.0PSSE Redux: Convex Relaxation, Decentralized, Robust, and Dynamic Approaches
Source quote
L578: (S3) │ 0.0367 │ 0.1434 │ 0.0407 │ 0.0390
2017Huber's estimator (λ=1.34) baselineMean-Square Estimation Error0.0390lambda=1.34 · scenario=S3PSSE Redux: Convex Relaxation, Decentralized, Robust, and Dynamic Approaches
Source quote
L578: (S3) │ 0.0367 │ 0.1434 │ 0.0407 │ 0.0390
2017Gauss-Newton baselineComputation time0.071 scase=noiseless · profile=default voltage profileRobust and Scalable Power System State Estimation via Composite Optimization.
Source quote
L445: Gauss-Newton~\cite{AburExpositoBook} │ 5 │ 0.071
2014Min_Input_PS (minimum-size input-set algorithm) proposedNumber of input nodes required4 nodesgamma=π/3 · coupling=inverse line-impedance magnitudes · frequency-distribution=zero-mean Gaussian, variance 8Global Practical Node and Edge Synchronization in Kuramoto Networks: A Submodular Optimization Framework
Source quote
L861: Figure \ref{fig:power_simulation}(a) illustrates input selection for a given set of intrinsic frequencies. The variance of the intrinsic frequencies was equal to 8. The dark squares indicate input nodes selected by our algorithm (|A| = 4). We observe that each non-input node is at most two hops away from an input node, which suggests that centrally located nodes are more likely to be candidates for inputs. On the other hand, nodes with high degree were not necessarily chosen as inputs. Additional information beyond the network topology, including the intrinsic frequencies and the coupling coefficients between nodes, is incorporated into the input selection process.