Vehicle Motion Planning with Time-Varying Constraints

William Todd Cerven, Francesco Bullo, Victoria CoverstoneJournal of Guidance Control and Dynamics 2004 · DOI

TL;DR

This paper introduces a novel motion planning algorithm for vehicles, particularly spacecraft, that can handle dynamic environments with obstacles and target locations that change over time. By extending the popular Rapidly-exploring Random Tree (RRT) algorithm to incorporate time as a state variable, the approach achieves probabilistic completeness and demonstrates its effectiveness in a challenging asteroid landing scenario.

What Problem Does This Paper Address?

Planning a safe and efficient trajectory for a vehicle, especially in complex and unpredictable environments, is a fundamental challenge in robotics and autonomous systems. Traditional motion planning methods often struggle with scenarios where obstacles are not static or where the desired end-state is not fixed. This is particularly relevant for spacecraft, which might need to navigate around moving debris, adjust their landing trajectory due to unexpected surface conditions, or account for the changing gravitational pull of celestial bodies. Existing methods, while effective for static environments, often fail to provide guaranteed solutions or become computationally prohibitive when dealing with time-varying constraints. This paper aims to bridge this gap by developing a planning algorithm that can robustly handle these dynamic complexities.

Methods

The core of this paper's contribution lies in its adaptation of the Rapidly-exploring Random Tree (RRT) algorithm. RRTs are a popular class of randomized algorithms that efficiently explore a state space by growing a tree of feasible paths from a starting point. The authors introduce a primitive-based hybrid system model where system dynamics are represented by a set of precomputed "reference trajectories" and "maneuvers."

The key innovation is the inclusion of time as a state variable within the RRT framework. This allows the algorithm to explicitly account for time-varying obstacles and time-dependent final conditions. The algorithm iteratively builds a tree of feasible trajectories, where each node represents a system state and a specific time. When extending the tree, the algorithm uses an embedded planner to find feasible trajectories between nodes, ensuring that these trajectories are collision-free and respect the time constraints. A novel approach to embedded planner error mitigation is also presented, which helps to correct for inaccuracies in the underlying planning routine as trajectories are concatenated.

Datasets

Not discussed in the paper. The paper focuses on a simulated example of a spacecraft landing on an idealized asteroid.

Key Insights and Ideas

  • Time is a Crucial State Variable: Explicitly incorporating time into the state space is essential for robust motion planning in dynamic environments. This allows the algorithm to reason about how the environment and the goal evolve over the course of the trajectory.
  • Hybrid Systems for Complex Dynamics: Modeling system dynamics using a combination of reference trajectories and maneuvers provides a flexible and efficient way to represent complex vehicle behaviors.
  • Probabilistic Completeness in Dynamic Scenarios: The adapted RRT algorithm maintains probabilistic completeness, meaning that if a feasible path exists, the probability of finding it converges to one as the number of iterations increases, even with time-varying constraints.
  • Error Mitigation is Practical: The proposed error correction mechanism, while not a complete solution, is shown to be effective in practice for the example problem, highlighting the importance of addressing planner inaccuracies in concatenated trajectories.

Key Results

The paper demonstrates the algorithm's effectiveness through a simulated asteroid landing scenario. The spacecraft had to land on an idealized asteroid (modeled as a cylinder) with time-varying obstacles and a specific landing zone. The algorithm successfully found a solution within a reasonable time frame.

  • The algorithm was applied to a scenario with a 46-hour transfer time limit.
  • The overall solution for the asteroid landing example was computed in 64.2 seconds.
  • The final state achieved had a position error of 0.03 percent and a velocity error of 0.2 percent relative to the target.
  • A batch of 50 runs of the example yielded a median run time of 95.9 seconds on an 850 MHz Pentium III computer, with 78% of cases completing in under 200 seconds.
  • The median number of randomized planner iterations was 11, with 90% of cases requiring less than 40 iterations.

Limitations and Future Work

  • Optimality: The paper acknowledges that the presented randomized method is not optimal. Future work could involve refining the tree to increase the optimality of the found trajectories.
  • Quantification of Error Handling: While the error mitigation method was shown to be effective, the limitations of handling error in this manner were not quantified. Further analysis in this area would be beneficial.
  • Gravity Models: The asteroid gravity was simplified to a Newtonian point source. Extending the algorithm to more complex gravity models would be a valuable future direction.
  • Real-world Validation: The current work is based on simulation. Applying and validating the algorithm in real-world scenarios would be a crucial next step.

Summary updated

BibTeX
@article{cerven2004vehicle,
  author = {William Todd Cerven and Francesco Bullo and Victoria Coverstone},
  title = {{Vehicle Motion Planning with Time-Varying Constraints}},
  journal = {Journal of Guidance Control and Dynamics},
  year = {2004},
  doi = {10.2514/1.4306},
}
Figure