Time-Dependent Behavior of a Concrete Integral Abutment Bridge
Lists
Only you see this
Abstract
Time-dependent behavior of an integral abutment bridge near Rochester, Minnesota, was investigated from the beginning of construction through 7 years of service by using field data collected from more than 150 instruments installed in the bridge during construction. Long-term bridge shortening was observed from the readings of horizontal extensometers installed behind the abutments. Measured pile curvatures steadily increased with time. To understand this unexpected bridge behavior better, a time-dependent numerical study using the creep and shrinkage models from American Concrete Institute Committee 209 was conducted. The results obtained in this research indicate that concrete creep and shrinkage had a significant effect on the behavior of the concrete integral abutment bridge over the course of the 7-year study.
BibTeX
@inproceedings{huang2005time,
author = {Jimin Huang and Carol K. Shield and Catherine French},
title = {{Time-Dependent Behavior of a Concrete Integral Abutment Bridge}},
booktitle = {Transportation},
year = {2005},
doi = {10.3141/trr.11s.f114879181v878t1},
}Loading related content...