Abstract
This study investigates for the first time the non-stationary stochastic lot-sizing problem involving multi-dealer joint replenishment under the policy (R, S) without fill rate constraints. The planning horizon for each dealer is divided into the replenishment cycle series, accounting for the lead time associated with each joint replenishment cycle. A shortest path model is developed. Through mathematical analysis, the safety stock variables are eliminated, and the multiple variables are reduced to replenishment variables only. The stochastic problem is converted to the deterministic dynamic lot-sizing through expectation analysis. Furthermore, the MLS-MRS heuristic is proposed based on Robinson's Left-Right shift (LS-RS) heuristic by adding a module, the positive cost-saving family shifts. This algorithm improves the optimal solution and notably greatly increases the search speed.
Introduction
In supply chain management, lot-sizing is the critical task of deciding when and how much to order to minimize total costs. This challenge is amplified in environments with multiple dealers utilizing joint replenishment to share major setup costs, especially when demand is non-stationary (changing over time) and stochastic (uncertain).
This paper addresses the "Static-Dynamic Uncertainty" (SDU) strategy under an (R, S) policy. In this setup, replenishment cycles ($R$) and order-up-to levels ($S$) are fixed before the planning horizon begins, providing a stable schedule that reduces "system nervousness." The primary contribution is finding optimal values for these variables in a multi-dealer environment where lead times and stock-out penalties are significant factors.
Methodology
The research employs a two-pronged strategy involving mathematical optimization and a novel heuristic algorithm.
Shortest Path Modeling & Variable Reduction
The authors modeled the total cost—comprising setup, holding, and shortage costs—as a shortest path problem. A critical breakthrough was the mathematical analysis of the safety stock factor ($z$). They discovered that the optimal safety stock could be expressed analytically in terms of the replenishment decision. This allowed them to eliminate safety stock as an independent decision variable, effectively converting a complex stochastic problem into a deterministic 0-1 integer programming problem.
The MLS-MRS Heuristic
Building on Robinson’s "Left-Right Shift" (LS-RS) heuristic, the authors proposed the Modified Left-Shift and Modified Right-Shift (MLS-MRS). While standard heuristics move individual orders to test for cost reductions, the MLS-MRS introduces "positive cost-saving family shifts." In joint replenishment, moving items individually often fails to trigger savings because the shared "major" setup cost remains. By shifting entire "families" of orders simultaneously, the algorithm captures the true economic benefit of joint ordering, preventing the search from getting stuck in local optima and drastically increasing speed.
Experimental Evaluation
The study evaluated the model using 324 generated data instances reflecting diverse industrial scenarios:
- Scale: Planning horizons of 6, 12, and 24 periods; dealer counts ranging from 20 to 300.
- Demand: Normally distributed demand where the mean and standard deviation vary per period (non-stationary).
- Benchmarks: Results were compared against established methods, including the FB-SK heuristic, Genetic Algorithms (AGA), Particle Swarm Optimization (PSO), and Simulated Annealing (SA).
Key Results
- Optimality: The MLS-MRS achieved an average optimality gap of only 0.03%, outperforming the standard LS-RS (0.25%) and far surpassing Genetic Algorithms (21.26%).
- Computational Efficiency: The MLS-MRS reduced runtime by 94.89% compared to the standard LS-RS heuristic.
- Consistency: In the 324 test cases, the MLS-MRS found the best-known solution 220 times, whereas the next best metaheuristic (Simulated Annealing) only found it 82 times.
Conclusion
The study highlights the power of analytic simplification over pure simulation. By mathematically eliminating the safety stock variable, the authors transformed a complex stochastic challenge into a manageable deterministic one. The specialized MLS-MRS heuristic significantly outperforms general-purpose metaheuristics in both solution quality and speed for this NP-hard problem. Future work may expand this logic to include stochastic lead times and more complex multi-echelon supply chain topologies.