NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Technology of 3D Visual Design for Hanging-Wall Ore Mining under Complex Geological Condition

Yiqun WangMining 2011

Abstract

The occurrence condition of hanging-wall ore on open pit boundary is always complicated and variable,which is accompanied with complex geology and landform including irregular benches,landslides and faults and so on.In order to solve the problem that general digital terrain model(DTM) can′t simulate complex geological mass accurately,by introducing special constrained topographical lines based on the platform of MICROMINE,a constrained DTM of open pit was built.With the method of wire frame modeling,the spatial relationship among ore,open pit slope and landslide was expressed visually.Those models can be used to guide the design of development and mining preparation for hanging-wall ore mining,the 3D visualization of underground mining design and the optimization of the development and mining preparation design.This technology was applied to the hanging-wall ore mining in Daye iron min,as a result,the occurrence condition of hanging-wall ore was simulated accurately,and the efficiency and rationality of the hanging-wall ore mining design were advanced greatly.It provided a reference for hanging-wall ore mining in similar open pit mines.
BibTeX
@inproceedings{wang2011technology,
  author = {Yiqun Wang},
  title = {{Technology of 3D Visual Design for Hanging-Wall Ore Mining under Complex Geological Condition}},
  booktitle = {Mining},
  year = {2011},
}

Loading related content...

Figure