Study on the Fast Transient Process of Primary Equipment Operation in UHV Fixed Series Capacitors Based on PEEC Method

Baojiang Tian, Kai Xu, Yingying Wang, Pei Guo, Chao Xiao, Wei Han, Yiran Dong, Jingang WangSensors 2025 · DOI

TL;DR

This paper introduces a novel simulation method using the Partial Element Equivalent Circuit (PEEC) to accurately model fast transient overvoltages and electromagnetic interference (EMI) in Ultra-High Voltage (UHV) Fixed Series Compensation (FSC) platforms. By developing a detailed multi-conductor model for both primary and secondary equipment, the study provides crucial insights into how operations like spark gap triggering and disconnector switching can impact system reliability and offers guidance for optimal equipment placement and shielding design.

What Problem Does This Paper Address?

Ultra-High Voltage (UHV) transmission systems rely on Fixed Series Compensation (FSC) to enhance stability and capacity. However, the operation of primary equipment within these FSC platforms, particularly during events like transmission line faults, can trigger protective devices such as spark gaps and disconnectors. These events can generate significant fast transient overvoltages and electromagnetic interference (EMI) that can propagate through the complex network of conductors on the platform, potentially affecting the performance and reliability of sensitive secondary equipment (e.g., measurement and protection devices). Previous studies often simplified the FSC platform as a single node, failing to capture the intricate electromagnetic coupling between various conductors. This paper addresses the need for a more sophisticated modeling approach that can accurately represent these multi-conductor systems and their transient behavior.

Methods

The core of this paper is the application of the Partial Element Equivalent Circuit (PEEC) method for modeling the fast transient processes. PEEC is a numerical technique that transforms electromagnetic field problems into discretized circuit models. The authors first develop a multi-conductor system model for both the primary and secondary equipment on the UHV FSC platform. This involves:

  • Discretization: The complex 3D conductors of the platform are divided into smaller segments (cells), with a discrete unit length of 100 mm.
  • Parameter Calculation: For each discrete cell, partial circuit parameters like resistance (R) and inductance (L) are calculated based on geometric dimensions and material properties. Mutual inductance (M) and capacitance (C) between neighboring conductors are also computed.
  • Hybrid Modeling: Lumped element models are incorporated for primary equipment like spark gaps (modeled as a capacitor in parallel with a time-varying resistor) and disconnectors (modeled as a two-port structure). Secondary equipment, such as current transformers (CTs) and measurement box loads, are also modeled using equivalent circuits.
  • Simulation: The entire system is then simulated using a time-domain analysis with a fixed time step of 0.2 ns to capture high-frequency components. The resulting differential-algebraic equations are solved iteratively using the GMRES method.

Datasets

The study utilizes the actual parameters of a 1000 kV UHV series compensation platform for its simulations. These parameters, listed in Table 1, include details such as capacitor bank values, voltage levels, platform dimensions, conductor properties, and spacing. The paper does not introduce new benchmark datasets but rather uses real-world parameters for validation.

Key Insights and Ideas

  • PEEC's Suitability for Complex Systems: The PEEC method proves effective in capturing the intricate electromagnetic coupling within the multi-conductor system of an UHV FSC platform, overcoming the limitations of simpler models.
  • Spark Gap vs. Disconnector Impact: Spark gap triggering generates significantly higher transient overvoltages and EMI compared to disconnector operations. This highlights the critical need to design for the worst-case scenario (spark gap triggering) when ensuring insulation and shielding.
  • Equipotential Point is Key: The lowest overvoltage levels are consistently observed at the equipotential connection point between the low-voltage busbar and the high-potential platform. This suggests strategic placement of sensitive secondary equipment near this point.
  • EMI Dominance of Low Frequencies: While fast transients can reach hundreds of megahertz, the dominant energy and frequencies of EMI in the secondary system are concentrated below 20 MHz, guiding the design of suppression measures.
  • Distance Matters for EMI: Increasing the physical distance between current transformers (CTs) and measurement boxes, and routing shielded cables along straight paths, can effectively reduce coupled EMI.

Key Results

  • Overvoltage Distribution: Simulations show that overvoltage peaks between the low-voltage busbar and the high-potential platform increase with distance from the equipotential connection point. For spark gap triggering, peak overvoltages can reach up to 1146 V (common mode) and 674 V (differential mode) in the secondary system.
  • Platform Potential Rise: The platform potential rise is highest at the busbar ends and lowest at the equipotential connection point, indicating localized current surges during spark gap events.
  • EMI Characterization: Tables 3 and 4 quantify the EMI characteristics for both spark gap triggering and disconnector operations, showing higher peak values and durations for spark gap events.
  • Distance-Based EMI Reduction: Figure 14 demonstrates that increasing the distance between CTs and measurement boxes by just a few meters can significantly reduce peak disturbance voltages. For instance, overvoltages between CT enclosures and the low-voltage busbar were found to be around 65-75 kV for spark gap triggering.

Limitations and Future Work

The authors acknowledge several limitations:

  • Idealized Conductors and Dielectrics: Conductors are assumed to have uniform cross-sections and constant material properties, and the dielectric medium (air) is treated as homogeneous and linear, neglecting effects like corona or humidity.
  • Simplified Spark Gap Model: The spark gap is modeled as an idealized voltage-controlled switch, without accounting for arc channel dynamics or thermal effects.
  • Idealized Grounding: Grounding networks and platform support structures are simplified as ideal connections or lumped impedance elements.
  • Limited Experimental Data: The study acknowledges the issue of limited waveform recording data available for such transient events, which the PEEC method helps to address.

Future work could involve incorporating more detailed models for conductors, dielectrics, and spark gap behavior. Further experimental validation of the simulation results would also be beneficial. The authors suggest that the proposed method provides a basis for optimizing sensor placement and designing electromagnetic shielding for interference-prone systems.

Summary updated

Abstract

This manuscript proposes a fast transient simulation method based on PEEC to model overvoltage caused by spark gap and disconnecting switch operations in UHV series compensation (FSC). It proposes a simulation method based on the Partial Element Equivalent Circuit (PEEC) for modeling the fast transient processes associated with the operation of primary equipment in UHV FSC. Initially, a multi-conductor system model for both primary and secondary equipment on the cascade platform is developed. Then, the lumped components' modeling of primary equipment and secondary equipment is added on the basis of multi-conductor model. Through simulation, the rapid transient overvoltage of primary equipment and the electromagnetic disturbance of the secondary system are analyzed. The simulation results provide insights into the distribution of fast transient overvoltage and the transient electromagnetic disturbance along the bus, from the low-voltage bus to the high-potential platform, under various primary equipment operating conditions. These findings provide a basis for theoretical analysis of the layout of sensor devices on platform and the design of electromagnetic shielding for interference-prone systems on platform.
BibTeX
@inproceedings{tian2025study,
  author = {Baojiang Tian and Kai Xu and Yingying Wang and Pei Guo and Chao Xiao and Wei Han and Yiran Dong and Jingang Wang},
  title = {{Study on the Fast Transient Process of Primary Equipment Operation in UHV Fixed Series Capacitors Based on PEEC Method}},
  booktitle = {Sensors},
  year = {2025},
  doi = {10.3390/s25154662},
}
Figure