Status of the SPES Exotic Beam Facility

M. Comunian, A. Andrighetto, Piergiorgio Antonini, C. Baltador, Luca Bellan, D. Benini, J. Bermudez, G. Bisoffi, D. Bortolato, M. Calderolla, M. Cavenago, S. Corradetti, Luca de Ruvo, A. Facco, E. Fagotti, P. Favaron, L. Ferrari, A. Galatà, F. Galtarossa, M. Giacchini, F. Gramegna, A. Lombardi, M. Maggiore, M. Manzolaro, Davide Marcato, T. Marchi, P. Mastinu, P. Modanese, M.f. Moisio, A. Monetti, Maurizio Montis, Antonio Palmieri, Stefano Pavinato, D. Pedretti, A. Pisent, M. Poggi, G. Prete, C. Roncolato, M. Rossignoli, L. Sarchiapone, D. Scarpa, D. Zafiropoulos, M. BellatoJournal of Physics Conference Series 2020 · DOI

Abstract

At Legnaro National Laboratories of INFN, a Rare Isotope Facility called “Selective Production of Exotic Species” (SPES) is under construction. Based on a 35-70 MeV proton cyclotron capable of delivering up to 0.75 mA, the facility includes an ISOL fission target station and utilizes the existing ALPI superconducting accelerator as a post-accelerator (up to 10 MeV/u for A/q=7). This report covers the high-resolution mass separator, the CW RFQ injector, the low-energy transfer lines, and the injection line from the Charge Breeder to ALPI.

Introduction

The SPES facility at INFN-LNL represents a significant advancement in nuclear physics infrastructure, designed to produce high-intensity, neutron-rich radioactive ion beams. By combining a high-power proton cyclotron with advanced mass separation and a superconducting re-accelerator, SPES aims to provide researchers with the tools to explore the limits of nuclear stability.

General layout of the SPES facility at LNL, showing the integration of the cyclotron, target areas, and the ALPI linac.

Methods: The ISOL Production Chain

The facility utilizes the Isotope Separation On-Line (ISOL) technique to generate and accelerate rare isotopes. The process follows a complex chain designed to maximize the capture and purity of short-lived isotopes:

  1. Primary Driver: A commercial 35-70 MeV proton cyclotron (C70) strikes a Uranium Carbide ($UC_x$) target, inducing $10^{13}$ fissions per second.
  2. Ionization and 1+ Selection: Fission products are ionized to a 1+ charge state. A Low-Resolution Mass Spectrometer (LRMS) performs the first "rough cut" of isotopes.
  3. Beam Cooling and HRMS: To achieve extreme purity, the beam is cooled and passed through a High-Resolution Mass Spectrometer (HRMS). This device, sitting on a -220 kV platform, is designed to separate isobars with a resolution of 1/20,000.
  4. Charge Breeding: To facilitate acceleration, an Electron Cyclotron Resonance (ECR) Charge Breeder strips more electrons away, moving the ions from a 1+ to an $n+$ charge state.
  5. Post-Acceleration: A new Continuous Wave (CW) Radio Frequency Quadrupole (RFQ) injector prepares the beam for the final stage: the existing ALPI superconducting linear accelerator.
Schematic representation of the SPES beam production chain, from the proton driver to the ALPI post-accelerator.

Key Technical Achievements

  • Cyclotron Performance: The primary proton driver is already operational. Tests showed excellent stability at 40 MeV (201 $\mu$A) and successful dual-extraction at 70 MeV (500 $\mu$A).
  • RFQ Construction: Manufacturing of the 80 MHz CW RFQ is well underway, with electrodes meeting tight mechanical tolerances (within 0.04mm).
  • End-to-End Simulation: Simulations of the entire line—from the charge breeder to the experimental hall—predict a total beam transmission of >85%, with a final kinetic energy of 1.2 GeV for the reference $^{132}$Sn beam.
  • Mass Resolution: The HRMS design was benchmarked to successfully separate isobars at the required 1/20,000 mass difference.

Limitations and Future Work

The facility is currently in the installation and commissioning phase. Key future milestones include:

  • ALPI Upgrades: To reach the target energy of 10 MeV/u for heavy isotopes like $^{132}$Sn, two additional cryostats must be installed in the ALPI linac.
  • Instrumentation: A full suite of beam diagnostic tools, including Faraday cups and tape stations for gamma-ray spectroscopy, is being rolled out to monitor beam quality in real-time.
  • Integration: The final "end-to-end" physical commissioning remains the ultimate hurdle to validate simulation results in a high-radiation environment.

Summary updated

Abstract

Abstract At Legnaro National Laboratories of INFN is under construction a Rare Isotope Facility called “Selective Production of Exotic Species” (SPES) based on a 35-70 MeV proton cyclotron, able to deliver two beams with a total current up to 0.75 mA, an ISOL fission target station and an existing ALPI superconducting accelerator as a post accelerator (up to 10 MeV/u for A/q=7). The paper will cover notably: the high-resolution mass separator, the CW RFQ (80 MHz, 727 keV/u, with internal bunching), the 1+ low energy transfer line and the injection line from Charge Breeder to ALPI under installation.
BibTeX
@article{comunian2020status,
  author = {M. Comunian and A. Andrighetto and Piergiorgio Antonini and C. Baltador and Luca Bellan and D. Benini and J. Bermudez and G. Bisoffi and D. Bortolato and M. Calderolla and M. Cavenago and S. Corradetti and Luca de Ruvo and A. Facco and E. Fagotti and P. Favaron and L. Ferrari and A. Galatà and F. Galtarossa and M. Giacchini and F. Gramegna and A. Lombardi and M. Maggiore and M. Manzolaro and Davide Marcato and T. Marchi and P. Mastinu and P. Modanese and M.F. Moisio and A. Monetti and Maurizio Montis and Antonio Palmieri and Stefano Pavinato and D. Pedretti and A. Pisent and M. Poggi and G. Prete and C. Roncolato and M. Rossignoli and L. Sarchiapone and D. Scarpa and D. Zafiropoulos and M. Bellato},
  title = {{Status of the SPES Exotic Beam Facility}},
  journal = {Journal of Physics Conference Series},
  year = {2020},
  doi = {10.1088/1742-6596/1401/1/012002},
}
Figure