Abstract
At Legnaro National Laboratories of INFN, a Rare Isotope Facility called “Selective Production of Exotic Species” (SPES) is under construction. Based on a 35-70 MeV proton cyclotron capable of delivering up to 0.75 mA, the facility includes an ISOL fission target station and utilizes the existing ALPI superconducting accelerator as a post-accelerator (up to 10 MeV/u for A/q=7). This report covers the high-resolution mass separator, the CW RFQ injector, the low-energy transfer lines, and the injection line from the Charge Breeder to ALPI.
Introduction
The SPES facility at INFN-LNL represents a significant advancement in nuclear physics infrastructure, designed to produce high-intensity, neutron-rich radioactive ion beams. By combining a high-power proton cyclotron with advanced mass separation and a superconducting re-accelerator, SPES aims to provide researchers with the tools to explore the limits of nuclear stability.
Methods: The ISOL Production Chain
The facility utilizes the Isotope Separation On-Line (ISOL) technique to generate and accelerate rare isotopes. The process follows a complex chain designed to maximize the capture and purity of short-lived isotopes:
- Primary Driver: A commercial 35-70 MeV proton cyclotron (C70) strikes a Uranium Carbide ($UC_x$) target, inducing $10^{13}$ fissions per second.
- Ionization and 1+ Selection: Fission products are ionized to a 1+ charge state. A Low-Resolution Mass Spectrometer (LRMS) performs the first "rough cut" of isotopes.
- Beam Cooling and HRMS: To achieve extreme purity, the beam is cooled and passed through a High-Resolution Mass Spectrometer (HRMS). This device, sitting on a -220 kV platform, is designed to separate isobars with a resolution of 1/20,000.
- Charge Breeding: To facilitate acceleration, an Electron Cyclotron Resonance (ECR) Charge Breeder strips more electrons away, moving the ions from a 1+ to an $n+$ charge state.
- Post-Acceleration: A new Continuous Wave (CW) Radio Frequency Quadrupole (RFQ) injector prepares the beam for the final stage: the existing ALPI superconducting linear accelerator.
Key Technical Achievements
- Cyclotron Performance: The primary proton driver is already operational. Tests showed excellent stability at 40 MeV (201 $\mu$A) and successful dual-extraction at 70 MeV (500 $\mu$A).
- RFQ Construction: Manufacturing of the 80 MHz CW RFQ is well underway, with electrodes meeting tight mechanical tolerances (within 0.04mm).
- End-to-End Simulation: Simulations of the entire line—from the charge breeder to the experimental hall—predict a total beam transmission of >85%, with a final kinetic energy of 1.2 GeV for the reference $^{132}$Sn beam.
- Mass Resolution: The HRMS design was benchmarked to successfully separate isobars at the required 1/20,000 mass difference.
Limitations and Future Work
The facility is currently in the installation and commissioning phase. Key future milestones include:
- ALPI Upgrades: To reach the target energy of 10 MeV/u for heavy isotopes like $^{132}$Sn, two additional cryostats must be installed in the ALPI linac.
- Instrumentation: A full suite of beam diagnostic tools, including Faraday cups and tape stations for gamma-ray spectroscopy, is being rolled out to monitor beam quality in real-time.
- Integration: The final "end-to-end" physical commissioning remains the ultimate hurdle to validate simulation results in a high-radiation environment.
Summary updated