NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Status of MAX IV Linac Beam Commissioning and Performance

Sara Thorin, Joel Andersson, Mathias Brandin, Francesca Curbis, Lennart Isaksson, Marija Kotur, Dionis Kumbaro, Filip Lindau, Erik Mansten, David Olsson, Robin Svärd, Sverker Werin, Jonas Björklund SvenssonJACOW 2017

Abstract

The MAX IV linac is used both for full energy injection into two storage rings at 3 GeV and 1.5 GeV, and as a high brightness driver for a Short Pulse Facility (SPF). The linac has also been designed to handle the high demands of an FEL injector. The linac is now routinely injecting into the two storage rings, and commissioning work is focused towards delivering high brightness pulses to the SPF. In this paper we present results from characterisation of the linac in ring injection mode, as well as results from measurements of key parameters for the SPF such as bunch length and emittance.
BibTeX
@inproceedings{thorin2017status,
  author = {Sara Thorin and Joel Andersson and Mathias Brandin and Francesca Curbis and Lennart Isaksson and Marija Kotur and Dionis Kumbaro and Filip Lindau and Erik Mansten and David Olsson and Robin Svärd and Sverker Werin and Jonas Björklund Svensson},
  title = {{Status of MAX IV Linac Beam Commissioning and Performance}},
  booktitle = {JACOW},
  year = {2017},
  doi = {10.18429/jacow-ipac2017-tupab099},
}

Loading related content...

Figure