Simultaneous Optimization of Exergy and Economy and Environment (3E) for a Multistage Nested LNG Power Generation System

Zhenzhen Chen, Yang Xing-lin, Junhu Zou, Qiang Lei, Bin YanJournal of Marine Science and Engineering 2024

TL;DR

This paper presents a novel three-stage nested power generation system for ships that simultaneously optimizes for energy efficiency (exergy), economic viability, and environmental impact (3E). By effectively utilizing LNG's cold energy and ship exhaust heat, the system achieves a significant increase in net power output and exergy efficiency, while reducing electricity costs and carbon emissions.

What Problem Does This Paper Address?

Maritime transport is a cornerstone of global trade, but it also contributes significantly to environmental pollution through emissions. Liquefied Natural Gas (LNG) is emerging as a cleaner fuel, but its regasification process releases substantial cold energy that is often wasted. Simultaneously, ship engines generate waste heat. This paper addresses the challenge of efficiently recovering and utilizing both this wasted LNG cold energy and the engine's waste heat to generate power, thereby improving ship energy efficiency, reducing operational costs, and minimizing environmental impact. Existing research often focuses on optimizing individual aspects (exergy, economy, or environment) or uses simpler system configurations. This study aims for a holistic optimization of all three critical factors within a more complex, cascaded system.

Methods

The core of this research is the development and optimization of a "three-stage nested LNG power generation system." This system integrates a trans-critical carbon dioxide cycle and leverages the pressure exergy of LNG. Key methodological components include:

  • System Design: A novel three-stage nested configuration is proposed, utilizing ship jacket cooling water (JCW) and exhaust gas (EG) as heat sources, and LNG as the cold sink.
  • Working Fluid Selection: Two azeotropic mixtures were chosen for the outer and middle cycles, and four cases were evaluated based on different mixing ratios.
  • Multi-Objective Optimization: The Multi-Objective Particle Swarm Optimization (MOPSO) technique was employed to simultaneously optimize for exergy efficiency, electricity production cost (EPC), and Total Equivalent Warming Impact (TEWI - a measure of carbon emissions).
  • Decision-Making: The TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) method was used to select the best performing system from the Pareto-optimal solutions generated by MOPSO.
  • Thermodynamic Modeling: Energy and exergy analyses were performed using Aspen HYSYS V11 software to model the system's performance.

Datasets

The study utilizes simulation data generated from Aspen HYSYS V11. The boundary conditions for the system (EG, JCW, and LNG parameters) are provided in Table 3. Model verification was performed by comparing simulation results with data from a similar study (Reference [45]), showing minimal error. No new experimental datasets were introduced.

Key Insights and Ideas

  • Cascading Utilization is Key: The nested, multi-stage design is crucial for effectively utilizing the temperature differences between the heat sources (EG, JCW) and the cold sink (LNG).
  • 3E Optimization is Essential: Optimizing solely for exergy efficiency can lead to higher costs or environmental impact. A simultaneous approach (3E) is necessary for a truly beneficial system.
  • Working Fluid Mix Matters: The specific composition of the working fluid mixtures significantly impacts system performance, highlighting the importance of careful selection and optimization.
  • LNG Pressure Exergy is Valuable: Incorporating the pressure exergy of LNG into the system design further enhances its overall efficiency.
  • Trade-offs Exist: While optimizing for one objective (e.g., exergy efficiency) can improve it, it may negatively impact others (e.g., cost). MOPSO and TOPSIS help navigate these trade-offs.

Key Results

The optimized system achieved significant improvements:

  • Net Power Output: Increased from 427.43 kW (unoptimized) to 575.75 kW (optimized).
  • Exergy Efficiency: Improved from 35.57% to 46.09%.
  • Electricity Production Cost (EPC): Reduced from $0.04569/kWh to $0.04099/kWh.
  • CO2 Emissions Reduction (TEWI): Reduced by 36,910 tons (compared to the unoptimized initial system).
  • Payback Period: Shortened to 2.548 years.

The optimal working fluid composition for the outer cycle was R170 (22.66%) and R1150 (77.34%), and for the middle cycle, R170 (90.86%) and R1270 (9.14%).

Limitations and Future Work

  • Waste Heat Recovery Limitations: The study acknowledges that waste heat recovery is not fully realized due to limitations in the cold end's cooling capacity. Future work could explore incorporating external cooling sources like seawater.
  • Simulation vs. Reality: The study relied on commercial software, and minor deviations from actual conditions might occur. Future research could involve building an experimental system for verification.
  • Component-Level Analysis: The current analysis focuses on the system level. Future research could delve into the specific structures, materials, and adaptability of individual components.
  • External Cooling Sources: Investigating the integration of external cooling sources (like seawater) to maximize waste heat recovery.
  • Experimental Validation: Building and testing a prototype system to validate simulation results.
  • Detailed Component Analysis: Performing in-depth analyses of individual system components.

Summary updated

BibTeX
@article{chen2024simultaneous,
  author = {Zhenzhen Chen and Yang Xing-lin and Junhu Zou and Qiang Lei and Bin Yan},
  title = {{Simultaneous Optimization of Exergy and Economy and Environment (3E) for a Multistage Nested LNG Power Generation System}},
  journal = {Journal of Marine Science and Engineering},
  year = {2024},
  doi = {10.3390/jmse12101850},
}
Figure