Abstract

In a hydropower plant, the generator terminal voltage was found to be too low during a leading phase test, preventing the generator from achieving the expected leading phase capacity. An analysis of this issue led to a proposed solution involving adjustments to the main transformer tap changer. To validate this approach, a generator leading phase test simulation system was employed. This system simulated both the lagging power factor operation and leading phase test data for various tap settings of the main transformer. The simulated data were then compared with actual data from a second leading phase test conducted after adjusting the transformer taps. This case study also introduces the application method of the generator leading phase test simulation system and underscores its critical role in conducting effective leading phase tests.

1. Introduction

Maintaining voltage stability within a power grid is a complex balancing act, particularly during periods of low load when system voltages tend to rise. Generators play a vital role in this balance through "leading phase operation," a state where the generator absorbs reactive power from the grid to lower the voltage. However, physical and safety constraints often limit the depth of this operation.

In a specific hydropower plant case study, engineers found that the generator's terminal voltage dropped to the 90% safety limit (16.2 kV) far earlier than expected, preventing the unit from reaching its full reactive power absorption potential. This issue was primarily attributed to the plant's location at the grid's edge and the significant impedance of its 132.4 km transmission lines, which caused a 5-6% voltage drop on the high-voltage side during tests.

2. Methodology and Baseline Data

The researchers adopted a simulation-first methodology using the PSD-BPA (Power System Analysis Software Package). The goal was to determine if adjusting the main transformer's tap changer could provide the necessary voltage "headroom" to allow for deeper leading phase operation without triggering safety shutdowns.

Initial baseline data was collected from a physical test conducted with the transformer at its original 2nd gear setting. As shown in the data below, the terminal voltage ($U_G$) approached the lower limit as reactive power ($Q_G$) became increasingly negative, particularly at higher active loads ($P_G$).

Table 3: Initial leading phase test data at the 2nd gear setting, illustrating the voltage drop constraints.

The simulation model (a "digital twin") incorporated detailed parameters of the 300MW hydro turbines and the 220kV outgoing lines. The researchers simulated a shift from the 2nd gear to the 3rd gear, which effectively increases the turns ratio to boost the generator's starting terminal voltage during normal operation.

3. Results and Validation

The simulation indicated that the 3rd gear setting would allow the generator to absorb significantly more reactive power before hitting voltage limits. A second physical test was conducted to verify these results.

Comparison of leading phase depth (MVar) vs. active load (MW) for 2nd gear, 3rd gear, and simulation data.

The results were transformative. At a full active load of 300MW, the generator's reactive power absorption capacity increased from -13.2 MVar to -28.4 MVar—a 115% improvement. Furthermore, the simulation data for the 3rd gear setting proved to be highly accurate, aligning closely with the empirical results from the second test. This consistency underscores the reliability of the PSD-BPA model for predicting complex generator-grid interactions.

4. Discussion and Conclusion

The study highlights that the limiting factor in leading phase operation is often not the generator's internal physics, but the external transformer configuration and grid topology. By "pre-boosting" the voltage via tap adjustments, engineers can create a buffer that compensates for the voltage drops inherent in long-distance transmission.

However, the authors note that tap selection must be precise; higher gears (4th or 5th) could lead to overvoltage during normal lagging power factor operation. Consequently, simulation serves as a mandatory safety shield, allowing engineers to define the safe "depth" of a test before pushing physical equipment to its limits. This approach ensures grid stability while maximizing the utility of existing hydropower assets.

Summary updated

BibTeX
@article{jiang2024simulation,
  author = {Dawei Jiang and Longbin Yu and Li Niu and Chang Liu and Yuxiao Zhou and Tie Guo and Yue Gao},
  title = {{Simulation research on generator leading phase test and main transformer tap selection}},
  journal = {Journal of Physics Conference Series},
  year = {2024},
  doi = {10.1088/1742-6596/2835/1/012052},
}
Figure