Research on Stress Characteristics of Segment Structure during the Construction of the Large-Diameter Shield Tunnel and Cross-Passage

Zhongsheng Tan, Zonglin Li, Wei Tang, Xueying Chen, Junmeng DuanSymmetry 2020 · DOI

TL;DR

This paper investigates the stress characteristics of large-diameter shield tunnel segments during construction and the impact of cross-passage excavation. Using numerical simulations and field tests, it reveals how segment deformation and stress distribution change, highlighting critical areas for reinforcement to ensure structural integrity.

What Problem Does This Paper Address?

The rapid expansion of high-speed and intercity railways in China necessitates the construction of large-diameter shield tunnels and associated cross-passages. While standard shield tunnel construction is well-studied, the unique structural features of large-diameter tunnels (more lining blocks, staggered joints) and the disruptive nature of cross-passage excavation pose new challenges to segment stability and safety. This research aims to fill this knowledge gap by analyzing the mechanical responses of segments in these specific scenarios.

Methods

The study employs a two-pronged approach:

  • Numerical Analysis: A discontinuous contact model was developed using finite element analysis. Segments and bolts were simulated as linear elastic solid elements, while the surrounding rock was modeled using nonlinear spring elements. The soil-cement slurry filling the gap between the segment and soil was simplified to a homogeneous, isotropic elastic grouting body. The Mohr–Coulomb elastic-plastic model was used for the stratum, grouting body, shield segment, and primary support.
  • Field Test: A comprehensive field test was conducted on the Wangjing tunnel project. This involved installing various sensors:
  • Vibrating string earth pressure boxes to measure earth pressure.
  • Vibrating string concrete strain gauges to measure axial force and bending moment of segments.
  • Vibrating string steel bar meters to test steel bar stress.
  • Gasket type unidirectional stress meters to measure longitudinal and circumferential bolt stress.

Datasets

The study utilized data from the Wangjing tunnel project in Beijing, China. This included:

  • Numerical simulation results based on the project's geological and structural parameters.
  • Field test data collected from various rings (669-673) and segments during shield construction and cross-passage excavation.

Key Insights and Ideas

  • Shield Tunnel Construction Induces Elliptical Deformation: During the construction of large-diameter shield tunnels, segments don't maintain a perfect circle. The vault and invert tend to move inward, with invert uplift often being more severe than vault settlement. Conversely, the arch waist on both sides moves outward.
  • The "K" Block is a Weak Link: Segments near the "K" block (capping block) behave more like hinges or chain rods, primarily transmitting axial forces but offering little resistance to bending moments and shear forces. This significantly weakens the overall integrity of the segment ring.
  • Cross-Passage Excavation Creates Stress Concentrations: The most significant deformation and stress in shield tunnel segments occur symmetrically at the interface between the main tunnel and the cross-passage.
  • Tension-Compression Reversal is a Risk: At the interface, the upper and lower edges of the segment, as well as the steel bars in the vault and arch waist, can shift from compressive to tensile stress. This reversal is a critical factor that can lead to segment damage.
  • Grouting is Crucial for Stability: The time-history curves of surrounding rock pressure show that grouting significantly influences the contact pressure between the segment and the surrounding rock, stabilizing the system after assembly.

Key Results

  • Shield Tunnel Construction: Maximum segment displacement was 1.14 mm (inward at the bottom), with outward displacement at the arch waist of 0.14 mm. Circumferential stress ranged from -12.1 to 0.32 MPa, with maximum compression at the arch waist (12.1 MPa). Axial forces were substantial (e.g., vault at 1760 kN), and bending moments were significant, particularly negative moments at the arch waist (-181 kN·m). Bolt tension was observed, with maximum stress of 56.5 MPa.
  • Cross-Passage Construction: Maximum segment settlement was ~1 mm, and maximum uplift was ~6.76 mm. Maximum principal stress was 423.11 kN/m² (within C50 concrete's tensile strength). Minimum principal stress was -3544.2 kN/m² (within C50 concrete's compressive strength). Axial forces showed a significant negative value (-2022.3 kN) at the interface edge. Bending moments were also notable, with a maximum positive moment of 49.8 kN·m at the bottom and a maximum negative moment of -45.2 kN·m at the interface edge. Bolt tensile stress reached 67.8 MPa at the segment bottom.

Limitations and Future Work

  • Limitations: The study focuses on a specific project (Wangjing Tunnel) and a particular type of large-diameter shield tunnel. The findings might not be universally applicable to all large-diameter tunnels or varying geological conditions without further investigation. The paper notes that the "K" block's mechanical performance is significantly weakened, but doesn't extensively detail mitigation strategies beyond suggesting reinforcement.
  • Future Work: The paper suggests that positions prone to tensile stress during cross-passage construction (steel bars in the vault and arch waist) can be reinforced by erecting section steel frames. This implies a need for further research into optimal reinforcement strategies and their effectiveness in preventing segment damage. Further studies could explore the long-term performance of these segments under various operational loads and environmental conditions.

Summary updated

BibTeX
@article{tan2020research,
  author = {Zhongsheng Tan and Zonglin Li and Wei Tang and Xueying Chen and Junmeng Duan},
  title = {{Research on Stress Characteristics of Segment Structure during the Construction of the Large-Diameter Shield Tunnel and Cross-Passage}},
  journal = {Symmetry},
  year = {2020},
  doi = {10.3390/sym12081246},
}