Overview of operational experience and results from test activities in Vattenfall’s 30 MWth oxyfuel pilot plant in Schwarze Pumpe

Marie Anheden, Uwe Burchhardt, Holger Ecke, Richard Faber, Olle Jidinger, Rainer Giering, Harriet Ann Kass, S. Lysk, Elin Ramström, Jinyue YanEnergy 2011 · DOI

Abstract

Vattenfall has constructed a 30MWth oxyfuel pilot plant located in Schwarze Pumpe in Germany. The plant has been in operation since September 2008. Several test campaigns have been carried out, and in this paper some of the main results and conclusions are described together with some points related to operating experience. The results will serve as a basis for the design and operation of the 250MWe oxyfuel demonstration plant to be constructed by Vattenfall in Jänschwalde, Germany.
BibTeX
@inproceedings{anheden2011overview,
  author = {Marie Anheden and Uwe Burchhardt and Holger Ecke and Richard Faber and Olle Jidinger and Rainer Giering and Harriet Ann Kass and S. Lysk and Elin Ramström and Jinyue Yan},
  title = {{Overview of operational experience and results from test activities in Vattenfall’s 30 MWth oxyfuel pilot plant in Schwarze Pumpe}},
  booktitle = {Energy},
  year = {2011},
  doi = {10.1016/j.egypro.2011.01.140},
}

Loading related content...

Figure