Optimization of HVAC Control to Improve Comfort and Energy Performance in a School
Lists
Only you see this
Abstract
ABSTRACT This article demonstrates the benefits of the Continuous Commissioning® process at a high school in Austin. The case study school was built in 2000. The HVAC system is operated by a full DDC system. The building continuous commissioning was started in August, 2005. All of the primary energy operation systems in the building were investigated to determine their current conditions and operations. The identified CC® measures for chiller, boiler, and AHU were implemented by Bes-Tech engineers. Utility bills before CC® were used to create baseline models of energy use. The accumulated savings is $41,916 from November, 2005, to November, 2006. On an annual base, the total cost savings is $38,691/yr, which represents 9.5 percent of baseline energy costs.
BibTeX
@inproceedings{dong2008optimization,
author = {Daoyi Dong and Li Song and Guanghua Wei},
title = {{Optimization of HVAC Control to Improve Comfort and Energy Performance in a School}},
booktitle = {Energy},
year = {2008},
doi = {10.1080/01998590809509375},
}Loading related content...