Optimal Scheduling of Timed Petri Nets With Resource Marking and Ready Times: Application to Robotic Flow Shops

Jun-Ho Lee, Hyun-Jung KimIEEE RA-L 2025 · OpenReview

Abstract

Many scheduling problems, especially for automated manufacturing systems, have been addressed with a timed Petri net (TPN) by developing optimal or heuristic algorithms based on it. However, most of them have focused on cyclic scheduling, in which a firing sequence of transitions in a TPN is repeated, to minimize the cycle time. A few studies have considered a noncyclic scheduling problem but focused on developing a heuristic search method. In this study, a noncyclic scheduling problem for automated manufacturing systems is considered with a TPN to obtain an optimal solution with the makespan measure. Specifically, a scheduling problem of a dual-gripper robotic flow shop with a given job sequence is considered to determine an optimal robot task sequence. We first define resource marking and resource ready times for the dual-gripper robotic flow shop based on a TPN and develop dominance properties based on them. Then, an optimal algorithm that eliminates dominated nodes in a reachability tree by using those properties is proposed. The experimental results show that the proposed algorithm significantly outperforms the existing studies.
BibTeX
@article{lee2025optimal,
  author = {Jun-Ho Lee and Hyun-Jung Kim},
  title = {{Optimal Scheduling of Timed Petri Nets With Resource Marking and Ready Times: Application to Robotic Flow Shops}},
  journal = {IEEE Robotics Autom. Lett.},
  year = {2025},
  url = {https://openreview.net/forum?id=hHLKrDzeG7},
}

Loading related content...

Figure