Multi-objective Green Flexible Workshop Scheduling Considering Multi-energy Consumption Factors
Abstract
Abstract In order to solve the energy consumption problem of shop floor caused by machine processing, adjustment, idling and workpiece transportation, the green flexible workshop scheduling problem was studied, and a multi-objective optimization model was established with the maximum completion time, total machine load and total energy consumption as the objectives. The double-layer coding strategy was adopted to encode processes and machines respectively to optimize the scheduling scheme, and then the adaptive hybrid crossover scheme, mutation scheme and improved elite retention strategy were adopted to improve the operation efficiency and population diversity of NSGA-II algorithm. Finally, a case study is used to verify the effectiveness of the algorithm in solving the multi-objective green flexible workshop scheduling problem, which provides a reference for enterprises to achieve green manufacturing.
BibTeX
@article{gao2022multi,
author = {Shang Gao and Chang Liu and Guan Wang},
title = {{Multi-objective Green Flexible Workshop Scheduling Considering Multi-energy Consumption Factors}},
journal = {Journal of Physics Conference Series},
year = {2022},
doi = {10.1088/1742-6596/2174/1/012083},
}Ask Althea to put this paper to the test.
Loading related content...