Monthly Runoff Interval Prediction Based on Fuzzy Information Granulation and Improved Neural Network

Xinyu Yang, Xiao Zhang, Jiancang Xie, Xu Zhang, Shihui LiuWater 2022 · DOI

TL;DR

This paper introduces a novel monthly runoff interval prediction model (FIG-GA-BP) that combines Fuzzy Information Granulation (FIG) with a Genetic Algorithm-optimized Backpropagation Neural Network (GA-BPNN). The model effectively captures the nonlinear and random nature of runoff data, providing more reliable prediction intervals compared to existing methods, which is crucial for effective water resource management.

What Problem Does This Paper Address?

Accurate monthly runoff prediction is vital for managing water resources, especially in regions facing changing climate and human impacts that introduce significant nonlinearity and randomness into runoff patterns. Traditional point prediction methods often struggle to capture this inherent uncertainty, leading to less robust decision-making. While interval prediction aims to address this by providing a range of possible outcomes, existing methods often rely on complex probability distributions and extensive data, making them less practical. This paper seeks to improve the accuracy and practicality of runoff interval prediction by developing a model that can better handle complex hydrological data without requiring strict distributional assumptions.

Methods

The core of this research lies in the proposed FIG-GA-BP model, which integrates three key components:

  • Fuzzy Information Granulation (FIG): This technique preprocesses the raw monthly runoff data. Instead of using the raw time series directly, FIG segments the data into "information granules." Specifically, it generates three distinct time series: minimum, average, and maximum values within defined time windows. This granulation helps to capture the range and trends of runoff changes more effectively than a single point value.
  • Genetic Algorithm (GA) for BPNN Optimization: The Backpropagation Neural Network (BPNN) is a standard tool for time series prediction. However, its performance can be sensitive to the initial weights and thresholds, which can lead to local minima during training. This paper uses a Genetic Algorithm to optimize these initial parameters for the BPNN. GA, inspired by biological evolution, searches for the optimal set of weights and thresholds through processes like selection, crossover, and mutation, aiming to avoid local optima and improve the network's learning capability.
  • Backpropagation Neural Network (BPNN) for Prediction: Once the FIG process generates the three granulated sequences and the GA optimizes the BPNN's initial parameters, the BPNN is trained to predict each of these three sequences separately. The combined predictions from these three sequences form the final prediction interval.

The model construction involves:

  1. FIG Processing: Segmenting historical runoff data into windows and applying fuzzy granulation to create Low, Average, and Up sequences.
  2. Data Normalization: Standardizing the granulated sequences to a [0, 1] range for better neural network performance.
  3. GA Parameter Setting & Initialization: Defining GA parameters and determining the BPNN structure (number of layers and nodes) through trial and error.
  4. GA Optimization: Iteratively using GA to find the optimal initial weights and thresholds for the BPNN.
  5. BPNN Prediction: Using the optimized BPNN to predict the normalized granulated sequences.
  6. Model Evaluation: Assessing the model's performance using metrics like FICP and FINAW.

Datasets

The study utilized historical monthly runoff data from three hydrological stations in the Wei River basin, China:

  • Weijiabu Hydrological Station
  • Linjiacun Hydrological Station
  • Zhangjiashan Hydrological Station

A total of 708 monthly runoff data points from January 1950 to December 2008 were used as the training set. An additional 120 monthly runoff data points from January 2009 to December 2018 were used as the test set. The paper does not introduce new benchmark datasets; it uses existing historical hydrological data.

Key Insights and Ideas

  • Fuzzy Granulation for Robustness: The core idea of using Fuzzy Information Granulation to create minimum, average, and maximum sequences is a powerful way to represent the inherent uncertainty and variability in runoff data. This approach moves beyond single-point predictions to capture the potential range of outcomes.
  • GA as a "Smart Initializer" for BPNN: By using GA to find optimal initial weights and thresholds for the BPNN, the model mitigates the common problem of BPNNs getting stuck in local minima, leading to more robust and accurate predictions.
  • Interval Prediction for Better Decision-Making: The paper strongly advocates for interval prediction over point prediction for hydrological forecasting. The ability to provide a prediction interval allows water resource managers to better understand the uncertainty involved and make more informed decisions, especially for flood control and water allocation.
  • FIG-GA-BP Outperforms Simpler Models: The consistent superiority of the FIG-GA-BP model across different hydrological stations suggests that the combination of FIG and GA-optimized BPNN is a highly effective strategy for complex, nonlinear time series like monthly runoff.

Key Results

The proposed FIG-GA-BP model demonstrated superior performance compared to baseline models (FIG-BP, FIG-WNN, and traditional BP) across all three tested hydrological stations:

  • Higher Prediction Accuracy: The FIG-GA-BP model consistently achieved higher Forecasting Interval Coverage Percentage (FICP) values, often reaching 0.98, indicating that a larger proportion of actual runoff values fell within the predicted intervals.
  • Narrower Prediction Intervals: The model also achieved smaller Forecasting Interval Average Width (FINAW) values, meaning the prediction intervals were narrower, providing more precise estimates without sacrificing reliability. For example, at Zhangjiashan, FINAW was 0.23 for FIG-GA-BP compared to 0.57 for FIG-BP.
  • Improved Qualification Rate (QR): The qualification rate (percentage of predictions with relative error < 20%) for FIG-GA-BP was consistently above 80% (reaching 81%, 84%, and 89% for the three stations), classifying its prediction accuracy as Class B or better, which is considered satisfactory.
  • Better Performance at Mutation Points: The paper highlights that FIG-GA-BP showed significantly better prediction accuracy at runoff "mutation points" (sudden changes in flow) compared to other models.
  • Reduced RMSE and ARE: The model also achieved the smallest Root Mean Square Error (RMSE) and Average Relative Error (ARE) among the compared models, further underscoring its predictive accuracy.

Limitations and Future Work

  • Limited Input Factors: The current model primarily uses historical runoff data. The authors acknowledge that climate change and human activities introduce many driving factors affecting runoff. Future research should incorporate hydrological factors like rainfall, underlying surface conditions, and vegetation into the prediction model.
  • Alternative Optimization Algorithms: While GA proved effective, the authors suggest exploring other optimization algorithms such as Particle Swarm Optimization (PSO) to potentially achieve even better adaptability and prediction results.
  • Generalizability: While tested on three stations, further validation on a wider range of hydrological conditions and basins would strengthen the model's generalizability.
  • Point Prediction Utility: The paper notes that the center of the prediction interval can serve as a point prediction. While this is a useful byproduct, further research could explore dedicated point prediction enhancements if pure point prediction is the primary goal.

Summary updated

Abstract

High-precision monthly runoff prediction results are of great significance to regional water resource management. However, with the changes in human activity, climate, and underlying surface conditions, the runoff sequence presents highly nonlinear and random characteristics. In order to improve the accuracy of runoff prediction, this study proposed a runoff prediction model based on fuzzy information granulation (FIG) and back propagation neural network (BPNN) improved with genetic algorithm (FIG-GA-BP). First, FIG was used to process the original runoff data to generate three sequences of minimum, average, and maximum that can reflect the rule of runoff changes. Then, genetic algorithms (GA) were used to obtain the optimal initial weights and thresholds of the BPNN through selection, crossover, and mutation. Finally, BPNN was used to predict the generated three sequences separately to obtain the prediction interval. The proposed model was applied to the monthly runoff interval prediction of Linjiacun and Weijiabu hydrological stations in the main stream of the Wei River and Zhangjiashan hydrological station on Jing River, a tributary of the Wei River. Compared with the interval prediction model FIG-BP, FIG-WNN, and traditional BP model. The results show that the FIG-GA-BP interval prediction model had a good prediction effect, with higher prediction accuracy and a narrower range of prediction intervals. Therefore, this model has superiority and practicability in monthly runoff interval prediction.
BibTeX
@inproceedings{yang2022monthly,
  author = {Xinyu Yang and Xiao Zhang and Jiancang Xie and Xu Zhang and Shihui Liu and Xu Zhang and Shihui Liu},
  title = {{Monthly Runoff Interval Prediction Based on Fuzzy Information Granulation and Improved Neural Network}},
  booktitle = {Water},
  year = {2022},
  doi = {10.3390/w14223683},
}
Figure