Main mechanics issues of CEPC MDI in TDR
Abstract
CEPC has two MDI locations. It is very complex in the mechanics design owing to extremely high precision and stability requirement as well as the limited space. This paper will describe two most complex mechanics issues and the progress. For the vacuum connection between detector and accelerator, two schemes including RVC and inflatable seal have been designed in detail. For the cryostat support system, the preliminary structure design and FEA have been done, and the alignment method is under study.