Learning-Augmented Approximation for Unrelated-Machines Makespan Scheduling

Kaito Baba, Evripidis Bampis, Giorgos MitropoulosNeurIPS 2026

TL;DR

Assigning tasks to different machines to finish everything as fast as possible is a famously stubborn NP-hard problem, forcing classical algorithms to choose between fast-but-rough approximations or agonizingly slow near-optimal searches. By feeding imperfect "hints" (like ML predictions) about just the biggest, slowest jobs into a scheduling algorithm, the authors achieve the best of both worlds: near-optimal schedules in polynomial time when hints are good, and a guaranteed safety net when hints are terrible.

What Problem Does This Paper Address?

Imagine managing a server cluster where every job takes a wildly different amount of time depending on which machine runs it. Your goal is to minimize the makespan—the completion time of the very last machine to finish (denoted in scheduling literature as $R||C_{\max}$).

Since 1990, we’ve been stuck with a frustrating mathematical ceiling. A classic polynomial-time algorithm can guarantee a schedule at most twice as long as the true optimum ($2\text{OPT}$), and doing better than $1.5\text{OPT}$ in polynomial time is proven to be NP-hard. You can get arbitrarily close to optimal—a $(1+\varepsilon)\text{OPT}$ schedule—by guessing where the "heavy" (long-running) jobs go and using Linear Programming (LP) for the rest, but the runtime explodes exponentially as you add machines.

Recently, learning-augmented algorithms have tried to bypass worst-case limits using external predictions. In 2025, Antoniadis et al. built a clean framework for doing this on linear selection problems (like Vertex Cover), leaving an open question: can we get smooth, prediction-driven guarantees for non-linear bottleneck problems like scheduling? This paper answers with a resounding yes.

Methods

The authors build upon the classic "heavy/short" job decomposition, where jobs taking longer than a fraction ($\varepsilon T$) of a target makespan $T$ are considered heavy, and the rest are short. Instead of exhaustively guessing where every heavy job goes, the algorithm takes a predicted partial schedule $\widehat{\phi}$ and localizes its search around it using a two-layer approach:

  1. Inner Layer (Fixed Target $T$):
  2. Filter: It keeps only the predicted assignments that qualify as $T$-heavy, ignoring predictions for short jobs.
  3. Local Search: Recognizing that predictions might miss some heavy jobs, it searches for up to $K$ additional heavy job assignments (where $K$ is a user-chosen constant budget).
  4. LP & Rounding: With those heavy jobs locked in, it solves a Linear Program for all remaining jobs and rounds the fractional assignments into a real schedule using classic Shmoys–Tardos rounding.
  5. Outer Layer (Finding $T$):
  6. Normally, algorithms binary-search for the best target $T$. Here, a failed step might just mean a bad prediction rather than an impossible target, breaking binary search. Instead, the outer layer tests a polynomial number of discrete "critical thresholds" where jobs flip between short and heavy, and also runs the classic $2\text{OPT}$ algorithm in parallel as a worst-case fallback.
Comparison of classical makespan guarantees and running times against the authors' learning-augmented variants.

Datasets

Rather than training a machine learning model on static datasets, the authors follow standard operations research and learning-augmented evaluation practices using synthetic benchmarks:

  • Processing Times: Sampled independently and uniformly from $[1, 100]$ (with correlated, non-uniform instances tested in the appendix).
  • Synthetic Predictions: Generated by taking an optimal schedule and deliberately corrupting a controlled fraction of its heavy assignments into false negatives (deleting hints) or false positives (assigning jobs to the wrong machines).

Key Insights and Ideas

  • Don't sweat the small stuff: You only need predictions for bottleneck-inducing heavy jobs. Short jobs can be effortlessly swept into the Linear Program at the cost of a tiny $\varepsilon T$ additive rounding error.
  • The asymmetry of mistakes: False negatives (missed heavy jobs) and false positives (wrongly placed heavy jobs) behave completely differently. You can "buy back" false negatives by spending compute time via the search budget $K$. False positives, however, are trusted and locked in, meaning they directly penalize your final makespan bound.
  • $K$ as a smooth compute-vs-quality dial: Because $K$ is a constant chosen by the user, the runtime stays strictly polynomial—scaling as $O((mn)^K \text{poly}(\dots))$—regardless of how many machines you have. Even at $K=0$ (zero local search), good predictions still dramatically beat classical baselines.

Key Results

  • Theoretical Guarantees: With accurate predictions, the algorithm achieves a $(1+\varepsilon)\text{OPT}$ makespan in polynomial time. As errors creep in, the bound degrades smoothly based on false-positive machine overload and the $(K+1)$-th largest missed heavy job, while strictly capped at $2\text{OPT}$.
  • Empirical Quality ($m=10$ machines, $n=100$ jobs): With zero error, the method finds the exact optimal schedule ($1.00\times \text{OPT}$), handily beating the classic 2-approximation baseline (which sits around $1.26\times \text{OPT}$ empirically). Setting $K=1$ or $K=2$ completely absorbs moderate false-negative rates (up to $\sim 0.14$ normalized error) with zero loss in schedule quality.
  • Massive Speedups ($n=10$, varying $m$ up to $10$): As machine count grows to 10, classical $(1+\varepsilon)$-approximation baselines skyrocket to 400–600 seconds. Meanwhile, the authors' method ($K=0, 1, 2$) finishes almost instantaneously, visually overlapping with the fast 2-approximation baseline on runtime plots.

Limitations and Future Work

  • Vulnerability to False Positives: In the main algorithm, every heavy prediction is trusted and fixed. If an oracle confidently assigns heavy jobs to terrible machines, local search ($K$) won't undo the damage (though the authors sketch an edit/deletion variant in Appendix E that trades false positives for false negatives).
  • Synthetic Oracles: Experiments rely on artificially corrupted optimal schedules rather than predictions from an actual trained neural network on real-world cluster traces.
  • Future Directions: Having also extended this localized-search idea to total weighted completion time in the appendix, the authors suggest applying this "predict-and-locally-repair" blueprint to other NP-hard optimization problems whose classical approximations rely on expensive structural guessing.

Summary updated

Abstract

Recently, Antoniadis et al. (ICLR 2025) proposed a framework for incorporating predictions to approximate NP-hard selection problems. Despite its simplicity, this approach tightly matches theoretical lower bounds, making its generalization highly compelling. We address an open question raised in the work of Antoniadis et al., concerning the extension of this approach to other important problems outside the class of selection problems, such as scheduling. We develop a learning-augmented algorithm for the makespan minimization problem on unrelated machines, denoted by $R||C_{\max}$. By using predictions of heavy job assignments, we achieve a polynomial-time $(1+\varepsilon)$-approximation for accurate predictions that smoothly degrades to a worst-case 2-approximation as the error increases. We conclude our work with an empirical analysis of our method.
BibTeX
@inproceedings{baba2026learning,
  author = {Kaito Baba and Evripidis Bampis and Giorgos Mitropoulos},
  title = {{Learning-Augmented Approximation for Unrelated-Machines Makespan Scheduling}},
  booktitle = {Advances in Neural Information Processing Systems},
  year = {2026},
  url = {https://openreview.net/forum?id=OVhc0m9SE8},
}

Loading related content...

Figure