NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Integrated Disposal of Paste Backfill and Surface High-concentration Tailings Stacking at Chambishi Copper Mine

Aixiang Wu, Ruan Zhuen, Yiming Wang, Shaoyong Wang, Cuiping Li, Yong WangPaste/˜Pœaste 2020

TL;DR

This paper details the successful implementation of an integrated system for paste backfill and surface tailings stacking at Chambishi Copper Mine's southeast orebody. This approach addresses increased production demands and the need for higher strength backfill by combining underground paste backfill with surface high-concentration tailings disposal, overcoming challenges of deep backfilling and long-distance transport.

What Problem Does This Paper Address?

The Chambishi Copper Mine's southeast orebody presents a significant challenge due to its high annual ore production (3.3 Mt), which is 3.3 times larger than the west orebody. This increased production necessitates a higher capacity for waste disposal and mine support. Specifically, the southeast orebody requires:

  • Higher Capacity: To keep pace with intensive mining operations ("excavation-stoping-backfilling-transportation"), the backfill and tailings disposal systems need to handle a much larger volume.
  • Higher Strength Backfill: The geological conditions, including high ground stress and surrounding rock instability, demand backfill with greater mechanical strength to ensure mine stability.
  • Lower Cost: The low ore grade in this section of the mine mandates strict cost control measures to maintain profitability.

Previous success with cemented paste backfill (CPB) in the west orebody inspired the adoption of an integrated disposal system for the southeast, combining CPB with surface high-concentration tailings stacking to meet these demanding requirements.

Methods

The paper describes an integrated disposal system that combines two key processes:

  • Cemented Paste Backfill (CPB): This involves mixing tailings with cement and water to create a material that can be used to fill mined-out stopes, providing structural support and reducing the volume of waste requiring surface disposal.
  • Surface High-Concentration Tailings Stacking: This method involves dewatering tailings to a high concentration before stacking them on the surface, reducing the footprint and water content of the tailings storage facility.

The integrated system utilizes:

  • Thickening System: Two 18m diameter Deep Cone Thickeners (DCTs) are employed to concentrate tailings. The underflow for CPB reaches 72.8 wt.% solids, and for surface stacking, 72 wt.% solids.
  • Mixing System: Two-stage double-shaft horizontal mixers (10 m³ volume, 180 m³/h capacity) are used for mixing CPB. A cement addition system with an anti-blocking structure controls the cement ratio. For the second phase of backfilling, a waste rock addition system is incorporated.
  • Surface Stacking Dilution: Two dilution tanks are used to reduce the underflow concentration from 72 wt.% to 55 wt.% for surface stacking.
  • Reticulation Systems:
    • CPB Reticulation: A system designed for two mining areas, utilizing a combination of gravity flow and pumping. This includes two plunger pumps (5 MPa pressure) for underground transport, with the longest backfill pipeline reaching approximately 2.8 km.
  • Surface Stacking Reticulation: Three diaphragm pumps (7 MPa pressure) are used for surface tailings transport, with a discharge pipeline extending about 15 km.

The paper also details experimental work on material characterization (specific gravity, particle size distribution), flocculation and sedimentation, and the testing of slump and uniaxial compressive strength (UCS) for various paste mixtures.

Datasets

Not discussed in the paper. The paper focuses on the design and implementation of an engineering system and the experimental characterization of materials used within that system.

Key Insights and Ideas

  • Synergy of Integrated Disposal: The core insight is that combining underground paste backfill with surface high-concentration tailings stacking is a viable and effective strategy for managing large-scale mining operations with demanding requirements for capacity, strength, and cost-efficiency.
  • Addressing Deep Backfilling and Long-Distance Transport: The system successfully tackles the challenges of deep backfilling (up to 0.98 km) and long-distance tailings discharge (15 km) through a strategic combination of gravity flow and high-pressure pumping.
  • Waste Rock as a Cost-Saving Strength Enhancer: The introduction of waste rock into the paste backfill mix in the second phase is a crucial cost-reduction strategy. By increasing the waste rock to tailings ratio, the cement requirement can be reduced while still achieving adequate backfill strength, demonstrating a practical approach to economic optimization.
  • Concentration vs. Strength Trade-off: The experiments highlight the critical relationship between paste concentration, cement content, and resulting strength. Higher concentrations generally lead to increased UCS but can negatively impact fluidity (slump), necessitating careful optimization for transportability and performance.
  • Flocculant Optimization for Thickening: The selection of an appropriate flocculant (Magnafloc 5250) and its optimal dosage were critical for achieving high underflow concentrations (up to 75.53 wt.%) in the thickening process, which is fundamental to the paste backfill and high-concentration stacking operations.

Key Results

  • System Capacity: The integrated system achieves a capacity of 160 m³/h for paste backfill (75 wt.% paste concentration) and 265 m³/h for surface stacking (55 wt.% slurry concentration).
  • First Phase Backfill Strength: In the first phase, with cement to tailings ratios of 1/8 for primary stopes and 1/24 for secondary stopes, the UCS after 28 days reached 1.2 MPa and 0.5 MPa, respectively, meeting self-supporting requirements.
  • Second Phase Backfill Optimization: By incorporating waste rock (1/3 waste rock to tailings ratio) and adjusting cement ratios (1:12 for primary, 1:30 for secondary), the system aims to reduce costs while maintaining strength. For the second stope, a UCS of 0.56 MPa and a slump of 27 cm were achieved after 28 days.
  • Thickening Performance: Deep Cone Thickeners (DCTs) achieved underflow concentrations of 72.8 wt.% for CPB and 72 wt.% for surface stacking.
  • Fluidity and Strength Trade-offs: Experiments showed that increasing paste concentration generally increased UCS but decreased slump. For example, at 82 wt.% concentration, slump dropped to 16 cm, potentially hindering transportation.

Limitations and Future Work

  • Limitations:
    • The paper focuses on the initial implementation and performance of the system. Long-term performance, durability, and potential issues like pipeline wear or blockages are not extensively discussed.
  • While cost reduction through waste rock addition is mentioned, a detailed economic analysis comparing the integrated system to alternative disposal methods is not provided.
  • The paper presents results from laboratory and pilot-scale testing for material characterization and strength development. Full-scale operational data beyond initial performance metrics would provide further validation.
  • Future Work:
    • The paper implies that further optimization of cement and waste rock ratios will continue to be explored to balance strength, cost, and fluidity for different stope requirements.
  • Monitoring and analysis of the long-term performance of the integrated disposal system, including its impact on mine stability and environmental aspects, would be valuable.
  • Further research into pipeline transportation dynamics for highly concentrated slurries and pastes, especially over long distances, could lead to improved system design and efficiency.

Summary updated

BibTeX
@inproceedings{wu2020integrated,
  author = {Aixiang Wu and Ruan Zhuen and Yiming Wang and Shaoyong Wang and Cuiping Li and Yong Wang},
  title = {{Integrated Disposal of Paste Backfill and Surface High-concentration Tailings Stacking at Chambishi Copper Mine}},
  booktitle = {Paste/˜Pœaste},
  year = {2020},
  doi = {10.36487/acg\_repo/2052\_58},
}
Figure