Initial Commissioning Results of the MAX IV Injector

Joel Andersson, Francesca Curbis, Mikael Eriksson, Dionis Kumbaro, Filip Lindau, Erik Mansten, David Olsson, Sara Thorin, Sverker WerinLund 2015

Abstract

The MAX IV facility in Lund, Sweden is currently under commissioning. In the MAX IV injector there are two guns, one thermionic gun for storage ring injection and one photocathode gun for the Short Pulse Facility. The commissioning of the injector and the LINAC has been ongoing for the last year and ring commissioning is due to start shortly. In this paper we will present the results from beam performance experiments for the injector at the current stage of commissioning.
BibTeX
@inproceedings{andersson2015initial,
  author = {Joel Andersson and Francesca Curbis and Mikael Eriksson and Dionis Kumbaro and Filip Lindau and Erik Mansten and David Olsson and Sara Thorin and Sverker Werin},
  title = {{Initial Commissioning Results of the MAX IV Injector}},
  booktitle = {Lund},
  year = {2015},
  doi = {10.18429/jacow-fel2015-tup036},
}

Loading related content...

Figure