Grid Codes-Informed Virtual Power Plant Management for Frequency Containment Reserve Provision
Abstract
The transition towards high-renewable penetrated power systems has posed significant challenges for frequency regulation due to the declining system inertia. The flexibility of distributed energy resources (DERs) can be harnessed through Virtual Power Plants (VPPs) to enhance the frequency regulation capability of power systems. From a service provider’s perspective, a VPP’s frequency regulation support is realized through the operating reserve provision. Focusing on the frequency containment reserve (FCR), the effective FCR provision by VPPs must respect the limitations of individual devices, while complying with the technical specifications in the grid codes, such as initial delay time and rise time requirements. In this context, we propose a grid codes-informed VPP management scheme to effectively deliver FCR that comply with grid codes. Specifically, the aggregated rise time of heterogeneous DERs is encoded with the portfolio of DERs through a data-driven framework, thus facilitating the integration of the rise time constraint into the VPP’s management. To enhance computational efficiency and meet the initial delay time requirement, we introduce a two-level model reduction method, node-level DERs aggregation and network-level topology simplification, to streamline the coordination of massive DERs. Case studies based on the European Low Voltage Test Feeder demonstrate the effectiveness of the proposed method that minimizes the regulation costs of the VPP while ensuring compliance with grid codes for FCR provision.
BibTeX
@article{huang2025grid,
author = {Mingyu Huang and Jiaxin Wang and Fei Teng and Yi Wang},
title = {{Grid Codes-Informed Virtual Power Plant Management for Frequency Containment Reserve Provision}},
journal = {IEEE Transactions on Smart Grid},
year = {2025},
doi = {10.1109/tsg.2025.3627434},
}Ask Althea to put this paper to the test.
Loading related content...