Efficient Construction of Minimum Makespan Schedules for Tasks with a Fixed Number of Distinct Execution Times

Daniel J. Rosenkrantz, Lin Yu, S. S. RaviAlgorithmica 2001

Abstract

This paper addresses scheduling problems for tasks with release and execution times. We present a number of efficient and easy to implement algorithms for constructing schedules of minimum makespan when the number of distinct task execution times is fixed. For a set of independent tasks, our algorithm in the single processor case runs in time linear in the number of tasks; with precedence constraints, our algorithm runs in time linear in the sum of the number of tasks and the size of the precedence constraints. In the multi-processor case, our algorithm constructs minimum makespan schedules for independent tasks with uniform execution times. The algorithm runs in O(n log m) time where n is the number of tasks and m is the number of processors.
BibTeX
@inproceedings{rosenkrantz2001efficient,
  author = {Daniel J. Rosenkrantz and Lin Yu and S. S. Ravi},
  title = {{Efficient Construction of Minimum Makespan Schedules for Tasks with a Fixed Number of Distinct Execution Times}},
  booktitle = {Algorithmica},
  year = {2001},
  url = {https://openreview.net/forum?id=1lptSoOdHiN},
}

Loading related content...

Figure