Economic Assessment of Mobilized Thermal Energy Storage for Distributed Users: A Case Study in China

Shaopeng Guo, Jun Zhao, Jinyue Yan, Guang Jin, Xiaotong WangEnergy 2016 · DOI

Abstract

Mobilized thermal energy storage (M-TES) system can be an alternative of the conventional heating system to meet the heat demand for distributed users. This paper conducted a case study of the M-TES system in China. The operating strategies (OS) of the M-TES with different transportation schemes were compared. Moreover, the economic assessment was performed based on the project's net present value (NPV) and payback period (PBP). The OS with 6 trips per day is the most profitable with pay-back time of about 2, 3 and 5 years if the waste heat costs at the level of 0 €/MWh, 3300 €/MWh, and 6600 €/MWh, respectively.
BibTeX
@inproceedings{guo2016economic,
  author = {Shaopeng Guo and Jun Zhao and Jinyue Yan and Guang Jin and Xiaotong Wang},
  title = {{Economic Assessment of Mobilized Thermal Energy Storage for Distributed Users: A Case Study in China}},
  booktitle = {Energy},
  year = {2016},
  doi = {10.1016/j.egypro.2016.06.094},
}

Loading related content...

Figure