Double-layer optimal scheduling of industrial parks based on equipment behavior correlation graphs

Weidong Bao, Zhou Yang, Jingbo He, Kaihua Lou, Xiuhua Ding, Bao Ning2025

Abstract

This paper establishes a two-layer optimization scheduling model for industrial parks based on the equipment behavior correlation graph. The model fully explores the flexible regulation ability of equipment behavior among high energy-consuming loads, acquires the optimal scheduling plan of the park, and realizes the coordinated operation of industrial parks and high energy-consuming enterprises. First of all, the goal of the level regulation plan of the power grid regulation center, as the upper-level manager, is to ensure the safe and stable operation of the system, minimize the operating cost of the system, and maximize the consumption of clean energy power generation. As a lower-level industrial park, the primary purpose of its operation is to achieve sustainable economic development in the park, reduce production costs and improve efficiency. Finally, the feasibility and validity of the model proposed in the paper were verified through numerical examples. The results show that the proposed method reduces the operating cost of the power grid regulation center on the basis of ensuring the safe and reliable operation of the system.
BibTeX
@misc{bao2025double,
  author = {Weidong Bao and Zhou Yang and Jingbo He and Kaihua Lou and Xiuhua Ding and Bao Ning},
  title = {{Double-layer optimal scheduling of industrial parks based on equipment behavior correlation graphs}},
  year = {2025},
  doi = {10.1109/iceeps66790.2025.11239619},
}

Loading related content...

Figure