Development and Application for Intelligent Monitoring System of Concrete Temperature Control

Lei Zhang, Guoxin Zhang, Yi Liu, Deng Xiang-ming, Liying Yang2017 · DOI

Abstract

Temperature control and crack prevention in high dams present significant engineering challenges, primarily due to "four don'ts" in information management: data that is not timely, accurate, true, or systematic. These deficiencies lead to "four top" thermal problems—excessive temperature differences, drops, rates of fall, and gradients—which often result in concrete distress. This paper presents an intelligent monitoring system deployed at the Huangdeng Hydropower Station. By integrating real-time perception, 4D thermal simulation, and autonomous water-cooling control, the system successfully managed the curing of 2.1 million cubic meters of concrete without a single temperature-induced crack.

Introduction

In civil engineering, constructing a massive concrete dam is a complex thermodynamic balancing act. As concrete cures, it generates significant internal heat. If unmanaged, the resulting thermal stresses lead to cracks that compromise structural integrity. Traditional manual monitoring methods often fail to provide the real-time feedback necessary to prevent these issues. To address this, researchers have developed an intelligent, closed-loop system that moves beyond simple data recording to autonomous decision-making and control.

The Challenge: "Four Don'ts" and "Four Tops"

The primary hurdle in dam construction is the lack of high-quality, real-time data—the "four don’ts" (not timely, accurate, true, or systematic). Without reliable data, engineers cannot effectively manage the "four tops":

  • Large temperature differences between the core and surface.
  • Large scales of temperature drop.
  • High rates of cooling.
  • Steep temperature gradients.

Failure to control these parameters leads to thermal cracking. The intelligent monitoring system was designed to bridge this gap by creating a continuous feedback loop between the physical dam and its digital twin.

System Architecture and Methodology

The system is built upon a four-pillar architecture: Perception, Interconnection, Analysis & Decision-making, and Control.

Conceptual framework of the intelligent monitoring system, illustrating the feedback loop between perception, analysis, and control.
  1. Perception & Interconnection: The site uses a mesh of digital temperature sensors, water pressure gauges, and microclimate stations. These sensors communicate via a hybrid wireless network (RS485, ZigBee, and WiFi) designed to withstand the harsh electromagnetic environment of a construction site.
  2. Whole-Process Simulation: A 4D simulation model tracks nine distinct processes from initial pouring to long-term operation. This allows for "back analysis," where real-world data is used to refine the model's predictive accuracy.
  3. Individualized Ideal Temperature Curves: Instead of a generic cooling schedule, the system generates custom cooling curves for different dam sections based on seasonal factors and specific concrete mixes.
Target temperature control curves showing the transition between the first and medium cooling phases.
  1. Autonomous Control: The system manages an intelligent water-cooling subsystem that automatically adjusts flow rates and directions in the cooling pipes. This "non-manual intervention" minimizes human error and ensures precise adherence to the target cooling curves.

Key Results and Impact

The system was deployed at the Huangdeng Hydropower Station, the world’s highest roller-compacted concrete (RCC) gravity dam. Key achievements include:

  • Zero Cracks: No temperature-related cracks were found in the 2.1 million cubic meters of monitored concrete.
  • High Precision: Temperature prediction models achieved an average precision within 0.1°C.
  • Operational Efficiency: The autonomous cooling process significantly reduced labor costs and construction error rates.
  • Real-time Feedback: The integration of 12 evaluation indexes provided instant "early warning" alerts, a major improvement over the delayed reporting of previous large-scale projects.

Conclusion and Future Outlook

The transition from a "digital" to an "intelligent" dam represents a paradigm shift in civil engineering. By closing the loop between perception and action, the system effectively solves the "four don'ts" and controls the "four tops." While challenges remain regarding the long-term durability of embedded sensors in harsh environments, the success at Huangdeng Dam demonstrates the immense potential for intelligent monitoring in large-scale infrastructure projects.

Reference: Zhang, L., Zhang, G., Liu, Y., Deng, X., & Yang, L. (2017). Development and Application for Intelligent Monitoring System of Concrete Temperature Control. 2nd International Conference on Modelling, Simulation and Applied Mathematics (MSAM 2017).

Summary updated

Abstract

The temperature control and crack prevention of the high dam is with very much difficulties. One important reason is that the unsmooth information causes improper measures and management, that is "four don't" for obtaining the informationnot timely, not accurate, not true, not systematic; furthermore, "four top" problems during the temperature control construction process can't be controlled easily, that is: large temperature difference, large scale of drop in temperature, high rate of temperature fall, large temperature gradient, which could finally cause the generation of distress in concrete. In order to solve "four don't" to control "four tops", take informationized, automatic and intelligent technical methods, establish individual ideal temperature control curve model, temperature and flow prediction and forecasting model, temperature control effectiveness evaluation model, crack risk alarm model and other online real-time analysis models, develops key technology and processes for simulative analysis of the whole process of the whole dam, develops pervasive, stable and highly precise automatic monitoring and controlling instrument and equipment, researches and develops all software function models and subsystems, integrates a complete digital concrete temperature control intelligent monitoring system for Huangdeng Dam, realizes comprehensive, accurate and timely automatic collection of large quantity of temperature control information and relevant key factors, realizes automatic analysis, evaluation and warning and alarm as well as support of intervening measure decision for large quantity of temperature control information, realizes intelligent water cooling of the whole dam under the "nonmanual intervention" ideal conditions, and improves the water cooling construction quality while reducing the construction error rate. The system dynamically and high-efficiently manages, real-timely controls and analyzes the temperature control information of Huangdeng Hydropower Dam with many characters, such as real-time, continuity, automation and intelligentization, etc., it effectively manages all links during the temperature control process of the dam, realizes online real-time monitoring and feedback control of construction, which is able to effectively solve "four don't" and control "four tops", basically realizes the temperature control and crack prevention of concrete, and improves construction quality and informatization control level of Huangdeng Hydropower Station.
BibTeX
@misc{zhang2017development,
  author = {Lei Zhang and Guoxin Zhang and Yi Liu and Deng Xiang-ming and Liying Yang},
  title = {{Development and Application for Intelligent Monitoring System of Concrete Temperature Control}},
  year = {2017},
  doi = {10.2991/msam-17.2017.57},
}

Loading related content...

Figure