Data flow partitioning with clock period and latency constraints
Abstract
We propose an efficient performance-driven two-way partitioning algorithm to take into account clock period and latency with retiming. We model the problem with a quadratic programming formulation to minimize the crossing edge count with nonlinear timing constraints. By using a Lagrangian Approach on Modular Partitioning (LAMP), we merge nonlinear constraints into the objective function. We then decompose the problem into primal and dual subprograms. The primal program is solved by a heuristic quadratic Boolean programming approach and the dual program is solved by a subgradient method using a cycle mean method. Experimental results on seven industrial circuits have demonstrated our algorithm is able to achieve an average of 23.25% clock period and latency reductions compared to the best results produced by 20 rum on each test case using a Fiduccia-Mattheyses algorithm. In terms of the average number of crossing edges, our results are only 1.85% more than those of the Fiduccia-Mattheyses algorithm without timing constraints. Compared with previous network flow based approach, our algorithm reduces the average crossing edge count by 14.59%. Furthermore, an average of 7.70% clock period and latency reductions are achieved,.
BibTeX
@article{liu1997data,
author = {Lung-Tien Liu and M. Shih and John Lillis and Chung‐Kuan Cheng},
title = {{Data flow partitioning with clock period and latency constraints}},
journal = {IEEE Transactions on Circuits and Systems I Fundamental Theory and Applications},
year = {1997},
doi = {10.1109/81.557364},
}Ask Althea to put this paper to the test.
Loading related content...