TL;DR
This paper presents a novel "roof-cutting and pressure relief + anchor cable combined support" strategy to mitigate severe deformation and failure in roadways excavated alongside small coal pillars under strong mining conditions. By optimizing roof-cutting height and coal pillar width through theoretical analysis, numerical simulations, and field tests, they achieved significant reductions in roadway deformation, improving stability and resource recovery.
What Problem Does This Paper Address?
In modern mining operations, especially in China, the use of small coal pillars is common to maximize coal recovery. However, as mining depth increases, these pillars, along with adjacent roadways (gob-side entries), face immense stress from overlying rock strata and active mining faces. This often leads to severe deformation, cracking, and even collapse of the surrounding rock, making roadway maintenance difficult and dangerous. Existing support methods struggle to cope with these extreme conditions, particularly when combined with "strong mining" practices. This paper tackles the challenge of effectively controlling the stability of these roadways under such demanding circumstances.
Methods
The researchers employed a multi-pronged approach:
- Theoretical Analysis: They derived formulas to calculate the optimal width of the small coal pillar, considering factors like plastic zone damage and bolt effectiveness.
- Numerical Simulation: Using discrete element software (UDEC), they built a 3D model of the A110607 return airway and simulated various roof-cutting heights and coal pillar widths to analyze stress and displacement patterns in the surrounding rock.
- Field Industrial Test: A crucial part of the study involved conducting actual blasting tests to determine optimal parameters for roof-cutting, such as blast hole spacing and charge structure.
- Collaborative Control Scheme: The core of their solution is a combined approach: "roof-cutting pressure relief" to pre-determine the main roof-breaking point and "anchor cable combined support" to reinforce the roadway structure.
Datasets
The study utilized geological data from the A110607 return airway of the Shanwenjiaba Coal Mine. No new datasets or benchmarks were introduced; rather, existing geological information was used to build and validate the models and field tests.
Key Insights and Ideas
- Optimizing Roof-Cutting is Crucial: The height of roof-cutting significantly impacts how the overburden collapses. Too low, and it doesn't effectively transfer stress; too high, and the benefit plateaus. An optimal height (around 8m in this case) allows for controlled caving that supports the basic roof.
- Coal Pillar Width Matters: There's a sweet spot for coal pillar width. Too narrow, and the pillar itself fails. Too wide, and it wastes valuable coal resources. A 3m width was found to be optimal for balancing stability and resource utilization.
- Synergy of Techniques: The combination of roof-cutting to manage the primary roof failure and robust anchor cable support provides a synergistic effect, far more effective than either method alone.
- Blasting Precision: The success of roof-cutting relies on precise blasting. The study identified specific blast hole spacings (800mm) and charge structures (321 for intact roof, 221/211 for broken zones) that effectively create the desired fractures.
Key Results
The field application of the "roof-cutting pressure relief + anchor cable combined support" scheme yielded significant improvements:
- Reduced Deformation: Roof and floor movement in the roof-cutting section was reduced by approximately 38% compared to the uncut section.
- Minimized Side Convergence: Deformation of the roadway's two sides was reduced by about 44% compared to the uncut section.
- Optimal Parameters: The study determined that a roof-cutting height of 8m, a roof-cutting angle of 15°, and a coal pillar width of 3m provided the best results.
- Effective Blasting: A blasthole spacing of 800mm was found to be optimal for roof-cutting.
Limitations and Future Work
- Site-Specific: The optimal parameters (cutting height, pillar width, blasting parameters) are derived from the specific geological conditions of the A110607 return airway. While the principles are generalizable, these exact values might need recalibration for different mine sites.
- Long-Term Monitoring: While the study reports on deformation over observation days, longer-term monitoring under various mining stages could provide further insights into the sustained effectiveness of the support system.
- Economic Analysis: While resource recovery is mentioned, a detailed economic analysis comparing the cost of the new support system against the benefits of reduced maintenance and increased recovery would be valuable.
The paper successfully demonstrates a practical and effective solution for a critical mining engineering problem, paving the way for more stable and efficient roadway excavation in challenging environments.
Summary updated