Construction monitoring and control were carried out during the lifting process of the steel truss bridge of heat-supply pipeline overhead section on Hulan River of the third electric power plant in Harbin.Measured results were compared with the theoretical results,and we checked the model and analyzed the reasons if there are significant differences between them.Besides,effective adjustments measures were taken to keep construction errors within the allowable ranges,which to ensure the safety during the construction process and reliability after construction completion.