Commissioning of te China-ADS injector-I testing facility

Fang Yan, Huiping Geng, Cai Meng, Yaliang Zhao, Huafu Ouyang, Shilun Pei, Rong Liu, Feisi He, Tong-Ming Huang, Rui Ge, Yanfeng Sui, Qiang Ye, Xiaoping Jing, Fengli Long, Jungang Li, Quanling Peng, Dizhou Guo, Zusheng Zhou, Haiyin Lin, Xinpeng Ma, Qunyao Wang, Guangwei Wang, Hua Shi, Gang Wu, Sheng‐Chang Wang, Ningchuang Zhou, Qiang Ma, Zhenghui Mi, Peng Sha, Xinying Zhang, Yaoyao Du, Jun He, Huizhou Ma, Lingda Yu, Ying Zhao, Xiaoyan Zhao, Fang Liu, Yanhua Lu, Lin Bian, Liangrui Sun, Rui Ye, Xiaohua Peng, Dayong He, Ouzheng Xiao, Yao Gao, Zhenghua Hou, Yuan Chen, Xiangchen Yang, Hongyan Zhu, Bo Li, Lan Dong, Heng Li, Xitong Sun, Linglang Dong, Ping Su, Jianping Dai, Jianli Wang, Shaopeng Li, Jianshe Cao, Yunlong Chi, Weimin PanarXiv 2017 · DOI · arXiv

Abstract

The 10 MeV accelerator-driven subcritical system (ADS) Injector-I test stand at the Institute of High Energy Physics (IHEP) is a dedicated facility for demonstrating a 325 MHz injector design for China's ADS project. The system features a four-vane copper RFQ and a superconducting section with fourteen spoke cavities. Recently, the facility achieved a continuous wave (CW) proton beam of 10.67 MeV with an average current of 2 mA. This paper describes the design, commissioning results, and challenges encountered during high-power CW operation.

Introduction

The global push for sustainable nuclear energy faces two massive hurdles: the long-term management of radioactive waste and the inherent safety risks of traditional reactors. Accelerator-Driven Subcritical (ADS) systems offer a solution by using a high-energy proton beam to drive a subcritical reactor, "transmuting" long-lived waste into shorter-lived isotopes while providing a safer, controllable energy source.

Building the "driver" for such a system—a high-intensity, high-power continuous wave (CW) linac—is an immense engineering challenge. Most existing accelerators operate in pulsed modes; running in CW mode requires managing extreme heat dissipation and maintaining beam stability over long periods. The Injector-I facility at IHEP serves as a critical testbed to prove that a proton beam can be reliably accelerated to 10 MeV in CW mode.

Facility Design and Methodology

The Injector-I facility utilizes a multi-stage acceleration strategy to reach its energy goals. The process begins with a 2.45 GHz Electron Cyclotron Resonance (ECR) ion source that generates the initial proton beam, which is then shaped by a Low Energy Beam Transport (LEBT) line.

Schematic layout of the China-ADS Injector-I testing facility, showing the LEBT, RFQ, MEBT1, and superconducting sections.

The beam then enters a four-vane copper Radio Frequency Quadrupole (RFQ) operating at 325 MHz. This component is critical, as it simultaneously focuses, bunches, and accelerates the beam to 3.21 MeV. Following the RFQ, the beam enters the superconducting (SC) section, which consists of two cryomodules containing a total of 14 superconducting single-spoke cavities ($\beta_g=0.12$). This represents a world-first application of such low-beta spoke cavities for CW proton beams.

Internal view of the four-vane copper RFQ structure used for initial beam bunching and acceleration.

Diagnostics throughout the line include ACCTs for current measurement, FCTs using Time-of-Flight for energy verification, and double-slit systems for emittance measurement. Beam dynamics were modeled using TraceWin to compare experimental results with theoretical predictions.

Key Insights and Commissioning Results

Commissioning between 2014 and 2016 yielded several critical insights:

  • Thermal Management: Transitioning from pulsed to CW mode revealed hardware vulnerabilities. High heat caused RF contact springs in power couplers to burn out, leading to a redesign that eliminated these springs in newer versions.
  • Beam Matching: Simulations and experiments highlighted that minor mismatches at the start of the linac (e.g., a 3-degree phase offset) cause particles to drift to the beam periphery and eventually be lost, emphasizing the need for precise matching in the Medium Energy Beam Transport (MEBT) section.
  • Superconducting Performance: The single-spoke cavities achieved accelerating gradients far beyond design specifications, reaching up to 14 MV/m peak surface fields.

The facility successfully surpassed its primary targets:

  • Energy: Reached a maximum beam energy of 10.67 MeV.
  • Intensity: Achieved a stable 1.62 mA CW beam for 23 minutes without system trips, and a peak pulsed current of 10.6 mA.
  • Efficiency: Total beam transmission from the RFQ entrance to the end of the SC section was approximately 88.4%.

Conclusion and Future Outlook

While the 2 mA CW beam is a landmark achievement, it remains below the ultimate design goal of 10 mA. Future work will focus on implementing beam loading compensation to handle higher currents, improving hardware durability to prevent surface damage on RFQ components, and increasing automation for beam orbit judgment and loss localization. These steps are essential for transitioning from a test facility to an industrial-scale ADS driver.

Summary updated

Abstract

The 10 MeV accelerator-driven subcritical system (ADS) Injector-I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The Injector adopted a four vane copper structure RFQ with output energy of 3.2 MeV and a superconducting (SC) section accommodating fourteen \b{eta}g=0.12 single spoke cavities, fourteen SC solenoids and fourteen cold BPMs. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. Continuous wave (CW) beam was shooting through the injector and 10 MeV CW proton beam with average beam current around 2 mA was obtained recently. This contribution describe the results achieved so far and the difficulties encountered in CW commissioning.
BibTeX
@misc{yan2017commissioning,
  author = {Fang Yan and Huiping Geng and Cai Meng and Yaliang Zhao and Huafu Ouyang and Shilun Pei and Rong Liu and Feisi He and Tong-Ming Huang and Rui Ge and Yanfeng Sui and Qiang Ye and Xiaoping Jing and Fengli Long and Jungang Li and Quanling Peng and Dizhou Guo and Zusheng Zhou and Haiyin Lin and Xinpeng Ma and Qunyao Wang and Guangwei Wang and Hua Shi and Gang Wu and Sheng‐Chang Wang and Ningchuang Zhou and Qiang Ma and Zhenghui Mi and Peng Sha and Xinying Zhang and Yaoyao Du and Jun He and Huizhou Ma and Lingda Yu and Ying Zhao and Xiaoyan Zhao and Fang Liu and Yanhua Lu and Lin Bian and Liangrui Sun and Rui Ye and Xiaohua Peng and Dayong He and Ouzheng Xiao and Yao Gao and Zhenghua Hou and Yuan Chen and Xiangchen Yang and Hongyan Zhu and Bo Li and Lan Dong and Heng Li and Xitong Sun and Linglang Dong and Ping Su and Jianping Dai and Jianli Wang and Shaopeng Li and Jianshe Cao and Yunlong Chi and Weimin Pan},
  title = {{Commissioning of te China-ADS injector-I testing facility}},
  year = {2017},
  eprint = {1705.05068},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/1705.05068},
}