NeurIPS 2026Coming to NeurIPS?Explore papers, orals & directions

Beam Commissioning and Initial Measurements on the MAX IV 3 GeV Linac

Sara Thorin, Joel Andersson, Francesca Curbis, Mikael Eriksson, Lennart Isaksson, Olivia Karlberg, Dionis Kumbaro, Filip Lindau, Erik Mansten, David Olsson, Sverker WerinLund 2015

Abstract

The linear accelerator at the MAX IV facility in Lund, Sweden, was constructed for injection and top up of the two storage rings and as a high brightness driver for the Short Pulse Facility. It is also prepared to be used as an injector for a possible future Free Electron Laser. Installation of the linac was completed and beam commissioning started in the early fall of 2014. In this paper we present the progress during the first phase of commissioning along with results from initial measurements of optics, emittance, beam energy and charge.
BibTeX
@inproceedings{thorin2015beam,
  author = {Sara Thorin and Joel Andersson and Francesca Curbis and Mikael Eriksson and Lennart Isaksson and Olivia Karlberg and Dionis Kumbaro and Filip Lindau and Erik Mansten and David Olsson and Sverker Werin},
  title = {{Beam Commissioning and Initial Measurements on the MAX IV 3 GeV Linac}},
  booktitle = {Lund},
  year = {2015},
  doi = {10.18429/jacow-fel2015-tup014},
}

Loading related content...

Figure