Autonomous construction of lunar infrastructure with in-situ boulders

Jonas Walther, Ryan Luke Johns, Hendrik Kolvenbach, Valentin Bickel, Marco HutterFrontiers in Space Technologies 2024

TL;DR

Building lunar infrastructure doesn't have to involve complex 3D printing or energy-intensive melting. This paper demonstrates that autonomous robots can build effective blast shields using raw, unprocessed lunar boulders, requiring two to three orders of magnitude less energy than alternative "in-situ" construction methods.

What Problem Does This Paper Address?

Establishing a long-term human presence on the Moon requires infrastructure, specifically blast shields. Every time a heavy lander like SpaceX’s Starship touches down, its engines eject high-velocity dust and rocks (blast-debris) that can sandblast nearby habitats or equipment.

Shipping building materials from Earth is prohibitively expensive (~$1.2 million per kg), so we must use what’s already there: In-Situ Resource Utilization (ISRU). Most current ISRU concepts involve melting lunar soil (regolith) or 3D printing, both of which require massive amounts of power—a scarce resource on the Moon. The authors ask: Can we skip the processing entirely and build "dry stone walls" using the boulders already littering the lunar surface?

Methods

The researchers developed a three-stage feasibility pipeline:

  1. Structural Modeling: They designed a trapezoidal blast shield and calculated the volume of boulders needed (~1000 $m^3$ for a full ring, though they focused on a 250 $m^3$ quarter-segment).
  2. Boulder Mapping: They used high-resolution imagery to identify boulders. Because the cameras can't see rocks smaller than ~1 meter, they applied Size-Frequency Distribution (SFD) laws (both power-law and exponential) to statistically estimate the abundance of smaller, "movable" boulders (0.5m to 1.5m).
  3. Path Planning & Logistics: They simulated an autonomous excavator’s mission using a greedy A* search algorithm. The planner had to minimize travel distance while respecting constraints like a maximum 20° slope, avoiding permanently shadowed regions, and managing a 10 $m^3$ payload capacity.

Datasets

The study utilized several key lunar datasets:

  • LRO NAC Images: High-resolution Narrow Angle Camera images from the Lunar Reconnaissance Orbiter for manual boulder mapping.
  • Diviner Rock Abundance: Data from the LRO’s Diviner instrument, used as an alternative, automated way to estimate rock populations.
  • LOLA Elevation Maps: Used to calculate terrain slopes for path planning.
  • Sun Visibility Data: To ensure the robot stays out of scientifically sensitive (or dangerously cold) shadowed regions.
  • New Contribution: The authors released augmented boulder shapefiles for two high-interest sites: the Shackleton-Henson Connecting Ridge (near the South Pole) and the Aristarchus Plateau.

Key Insights and Ideas

  • The "Raw" Advantage: The most significant "aha" moment is the energy delta. By using boulders as-is, you bypass the phase-change energy required to melt regolith. This reduces the energy footprint from thousands of Gigajoules to just ~10 GJ.
  • The SFD Uncertainty: The feasibility of a site depends heavily on which statistical law you believe. A "power law" suggests boulders are everywhere, while an "exponential law" is more conservative. The authors argue for the conservative approach to ensure mission success.
  • Landing Precision is a Multiplier: If a lander’s accuracy is low (e.g., a 50m margin of error), the blast shield must be placed further away and built larger, drastically increasing the number of boulders required.
  • Autonomy is the Bottleneck, Not Power: While the energy requirements are low, the robot has to drive a lot (hundreds of kilometers). The challenge isn't finding power; it's building a navigation system that can handle 1,500 hours of autonomous operation.

Key Results

  • Energy Efficiency: Constructing a quarter-ring blast shield requires 10.3 GJ of energy. Compare this to 1,250 GJ for cast regolith or 17,500 GJ for microwave sintering.
  • Mission Duration: At one of the South Pole sites, the median construction time was estimated at 1,520 hours (roughly 63 Earth days).
  • Logistics: The robot would need to drive a cumulative distance of approximately 880 km to collect enough material, assuming a conservative boulder distribution.
  • Payload Impact: Increasing the robot's payload capacity reduces the number of trips but increases the energy cost per kilometer; the authors found 10 $m^3$ to be a realistic "sweet spot."

Limitations and Future Work

The primary limitation is the "gap" problem. A dry stone wall made of irregular boulders isn't airtight. While it stops large rocks, fine dust might leak through the gaps. The authors suggest future work should investigate "sealing" the wall with smaller pebbles or a thin layer of regolith.

Additionally, the study assumes the robot can easily "pluck" boulders from the surface. In reality, many boulders are partially buried, and the energy required to excavate them from the compacted lunar soil (regolith) needs further experimental validation. Finally, the long-distance driving requirement demands a level of autonomous reliability that hasn't yet been flight-proven on the lunar surface.

Summary updated

Abstract

Significant infrastructure is required to establish a long-term presence of humans on the lunar surface. In-situ resource utilization (ISRU) is a fundamental approach to ensure the viability of such construction. Here, we investigate the feasibility of constructing blast shields as one example of lunar infrastructure using unprocessed lunar boulders and an autonomous robotic excavator. First, we estimate the volume of unprocessed material required for the construction of blast shield segments. Secondly, we quantify the amount of available boulders in two exploration zones (located at the Shackleton-Henson Connecting Ridge and the Aristarchus Plateau pyroclastic deposit) using LRO NAC images and boulder size-frequency distribution laws. In addition, we showcase an alternative approach that relies on Diviner rock abundance data. Thirdly, we use a path planning algorithm to derive the distance, energy, and time required to collect local material and construct blast shield elements. Our results show that our construction method requires two orders of magnitudes less energy than alternative ISRU construction methods, while maintaining realistic mission time and payload capacity margins.
BibTeX
@inproceedings{walther2024autonomous,
  author = {Jonas Walther and Ryan Luke Johns and Hendrik Kolvenbach and Valentin Bickel and Marco Hutter},
  title = {{Autonomous construction of lunar infrastructure with in-situ boulders}},
  booktitle = {Frontiers in Space Technologies},
  year = {2024},
  doi = {10.3389/frspt.2024.1345337},
}
Figure